Loading...
HomeMy WebLinkAbout74-34790-22-22rsiamEllerbee-Walczak Inc. ' GEOTECHNICAL ENGINEERING 6 CONSTRUCTION MATERIALS TESTING SERVICES REPORT NO.: 74-34790-22-22rsi REPORT OF: Reinforcing Steel Inspection CLIENT: Wright Construction Company, Inc PROJECT: Wright Construction Office DATE: 5/13/2022 INSPECTOR: Saul Martinez On this date, reinforcing steel was inspected for the retaining wall. The following Reinforcing Items were inspected. Summary of Inspection Items Inspected Correct Incorrect I Items Inspected Correct Incorrect Placing Drawings Approved x IDowel Bars in Place x (Bar Size & Grade x (Lapped Splices x Reinforcing Steel Clean x I lColumn Ties Properly Tied & Spaced Forms Clean x I (Proper Clearance from Forms x Number of Bars x I (Stirrup Spacing/Type x (Bar Length & Shape x I lWelded Splices Proper Bar Placement x I IMechanical Splices IProperly Tied x I I Proper Cover x Proper Bar Supports x Plans or Cut Sheets used for Inspection: S1.1A Plan Sheet Approval Date: 3/8/2022 Discrepancies: None Hector Martinez k.illgence, ., P. . General Manager Texas Firm No. F-4610 Cc: Wright — Ashley Wright awright@wrightconst.com 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888