Loading...
HomeMy WebLinkAboutItem 10 - Curb and Gutter Concrete MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: DECEMBER 16, 2008 SUBJECT: APPROVAL TO RENEW AN ANNUAL CONTRACT TO PROVIDE CURB AND GUTTER CONCRETE CONSTRUCTION SERVICES RECOMMENDATION: City Council to consider approval to renew an annual contract for curb and gutter concrete construction services to be ordered on an as-needed basis from Manning Concrete. Annual expenditures will be limited to the budgeted amount for this service. FUNDING SOURCE: Funds are available in account 174-43301-090-000 Street Maintenance/Capital Replacement/Transportation Infrastructure Maintenance. BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid was advertised in the Fort Worth Star Telegram on October 12, 2006 and October 19, 2006. Bids were issued to 13 vendors with seven vendors responding. Council first approved this contract to Manning Concrete and R.E.C. General Contractors at the City Council meeting on November 21, 2006. The purpose of this bid is to establish fixed annual pricing for curb and gutter concrete construction services ordered on an as-needed basis by the Traffic Division. The specifications of this bid requested fixed pricing for construction of various footage configurations for 6" curbs with 18" gutters, as well as removal of the old curbs and gutters. The bid specifications allowed for an initial one-year contract with four one-year options to renew. If approved, this would be the second renewal. Council approved the first year renewal of this contract on December 4, 2007 to Manning Concrete as primary vendor and R.E.C. General Contractors as secondary vendor. Currently R.E.C. General Contractors is no longer in business. December 10,2008(10:36AM) Specifications of the contract allowed for price adjustments to be considered at each renewal period. Due to the increase cost of fuel and materials Manning Concrete is asking for a 10% increase in pricing (See attached paperwork). Manning Concrete has provided this service in the past with satisfactory results. Staff recommends approval of renewing the contract to Manning Concrete as primary vendor for curb and gutter concrete construction services that will establish a fixed pricing contract for an additional one-year period. GR December 10,2008 (10:36AM) Manning Concrete Curb and Gutter Constructuion Services 2008 2009 Pricing Pricing Item# Qty Unit- Description 0, t.,4_,_ Unit Price,. Unit v,k- 1 1 LF New Curb and Gutter Construction-for 0-100 Linear Feet 16.50 18.15 2 1 LF New Curb and Gutter Construction-for 101-499 Linear Feet 16.25 17.88 3 1 LF New Curb and Gutter Construction-for 500-999 Linear Feet 16.00 17.60 4 1 LF New Curb and Gutter Construction-for 1000-1499 Linear Feet 13.00 :14.30 5 1 LF New Curb and Gutter Construction-for 1500-3000 Linear Feet 12.75 14.03 6 1 LF Replace Existing Curb and Gutter-for 0-100 Linear Feet 22.50 ;24.75 7 1 LF Replace Existing Curb and Gutter-for 101-499 Linear Feet 22.25 .?24.48 8 1 LF Replace Existing Curb and Gutter-for 500-999 Linear Feet 22.00 24.20 9 1 LF Replace Existing Curb and Gutter-for 1000-1499 Linear Feet 16.75 18.43 10 1 LF Replace Existing Curb and Gutter-for 1500-3000 Linear Feet 15.00 16.50 ANN Manning Concrete Sawing P.O. Box 123566 Ft. Worth, Texas 76116 Manning Concrete would like to renew The Contract with the City Of Grapevine. We would like to take this opportunity to ask for a 10% increase. Do to the cost of Steel, Concrete insurance, and fuel. If you have any questions contact Henry Manning (817) 991-9483. Thank you Henry Manning 7((efri