HomeMy WebLinkAboutItem 17 - Mustang Elevated Storage TankFROM: • RUMBELOW, CITY MANAGER 69 - MEETING DATE: OCTOBER 20, 2015 SUBJECT: AWARD OF CONSTRUCTION CONTRACT — MUSTANG ELEVATED STORAGE TANK RENOVATIONS, REPAIRS AND REPAINTING RECOMMENDATION City Council consider: • awarding the contract for the Mustang Elevated Storage Tank Renovations and Repainting to Classic Protective Coatings, Inc. in the amount of $1,239,850.00 • adopting an ordinance appropriating $1,363,835 for the contract award including 10% contingency to the FY 2015 — 2016 Capital Improvements Plan, • authorizing the City Manager to execute said contract, and take any necessary action. Funds are programmed in the un -appropriated balance of the $10 Million in 2015 Utility Bonds sold in January 2015. The Mustang Elevated Storage Tank was constructed in 1985 with a storage capacity of 1,000,000 gallons of water. The pedestal and the elevated bowl are steel construction requiring periodic painting and other maintenance activities. This tank has never been fully emptied and repainted. The exterior was repainted without sandblasting in 2003. Painting systems used on storage tanks typically last twelve to fifteen years. The paint system life can be extended with minor maintenance. The interiors of all of our tanks are inspected annually by a certified inspector checking the paint system for pitting and deterioration. Last year, Deltatek Engineering, the City's elevated and ground storage tank consultant, performed a full inspection of this tank. The results of this inspection identified that the bowl and the pedestal needed painting and that structural repairs were needed on the pedestal due to corrosion. In addition to the painting and structural repairs, modifications to the tank are necessary to comply with regulatory agency regulations (TCEQ, AWWA, ANSI, OSHA) and to address operational deficiencies. These modifications include replacing the roof vent with a new RAAgenda\2015\10-20-15\Mustang Tank rehab Const Award.doc vandal resistant vent, replacing the insect shield with one that will also shield from dust and other particulate matter, installing a new roof safety rail and installing a new anti -fall railing on all access ladders. Cellular Phone operators currently on the tower will relocate to temporary poles installed around the perimeter of the tower site. Those operators are AT&T, Verizon and T -Mobile. The attached map represents the planned locations of the temporary poles on the west side of the tower and the planned locations and alternate locations for the east side of the tower. Bids were opened on September 9, 2015 with four bids received as follows: Classic Protective Coatings, Inc. $1,239,850.00 Blasco $1,257,800.00 N.G. Painting L.P. $1,277,219.00 TMI Coatings, Inc. $1,583,700.00 Deltatek Engineering has reviewed the bids and has recommended that the City award the contract to Classic Protective Coatings, Inc. The contractor has 270 days to complete the project. Staff recommends approval. R:Wgenda\2015\10-20-15\Mustang Tank rehab Const Award.doc I CHAIN LINK I GRAPEVINE] OULEYVILUE I.S.D. SERVICE CENTER 24 SLIDING ACCESS GATE EX CARD READER FOR GCISD ROLLER GATE STOP NOTE WALK SIGN 1. CONTRACTOR TO MAINTAIN GATEI. ACCESS TO THE G.C.I.S.D. T&T SERVICE CENTER & CARD g OLP 7a_ .- RAILING - - - - - - - - - - - - - - - - - - - - - BARRICADES READER AT ALL TIMES. DUMPSTER AT&T - - - VERI ON I AT&V'� AT&T SIGN 0 . 5��ON 'CABLE RUN AREA -MOBIL ABOVEGROUND) EX GCISD BACKUP T GENERATOR VERIZON 0 b VERIZO"N" T&TAND OPTION 1 T-MOSILE/ T -MOBLE GCISD SIDE GCISD Z, ",T -MOB L4 MAINTENANCE BUILDING X, SIGN PROPOSED AREA FOR CELLULAR ANTENNA POLES & CABLES Of 'o TY SIDE < < 0 0 < 0 0 TMO L S GOE'D SIDE VERIIIN T_.OBL ' SO E YIDE 0 O wm Sir 12° WL 0 SIGN +-4 �-4 �-4 1 -- --- BARRICADES - A= VERIZON / UNDERGROUND VAULT NOTES. I CONTRACTOR TO MAINTAIN ACCESSTO THE G.C.I.S.D. SERVICE CENTER & CARD READER AT ALL TIMES. 2, INSTALL TEMPORARY CONSTRUCTION FENCE GRAPEVINDCOLLEWILLE ISD. PORTABLE BUILDING AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, REVISING THE ADOPTED CAPITAL IMPROVEMENTS BUDGET FOR THE FISCAL YEAR ENDING IN 2016, INCREASING APPROPRIATIONS; DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council of the City of Grapevine desires to maintain its Water Infrastructure with regular maintenance, repairs and updates as necessary; and WHEREAS, funding for the maintenance activities, construction repairs and updates needed for the Mustang Elevated Storage Tank is not currently included in the FY 2015- 2016 Capital Improvements Plan Budget; and WHEREAS, maintenance, repairs and updates to the Mustang Elevated Storage Tank are necessary to insure continued optimum operation of the tank and the City's Water Distribution System. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated in the preamble of this ordinance are true and correct and are hereby incorporated into the body of this ordinance as if copied in their entirety. Section 2. That the City Council hereby authorizes an amount of $1,363,835 be appropriated from the unappropriated fund balance of the Utility Capital Fund. Funding is available from the sale of the 2015 Utility Revenue Bonds and the FY 2015-2016 Capital Improvements Plan budget for the Construction of Mustang Elevated Storage Tank Rehab Project. Section 3. That a copy of the revised FY 2015-2016 Capital Improvements Plan budget document shall be kept on file in the office of the City Secretary and on the City of Grapevine website. Section 4. That the terms and provisions of this ordinance shall be deemed to be severable, and that if the validity of any section, subsection, word, sentence or phrase shall be held to be invalid, it shall not affect the remaining part of this ordinance. Section 5. That the fact that the present ordinances and regulations of the City of Grapevine, Texas are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety, F and general welfare which requires that this ordinance shall take effect immediately from and after its passage and it is accordingly so ordained. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 20th day of October, 2015. ATTEST: APPROVED AS TO FORM: ORD. NO. 2