Loading...
HomeMy WebLinkAboutItem 03 - Links TrailMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: DECEMBER 20, 2011 SUBJECT: LINKS TRAIL RESOLUTION & ENGINEERING DESIGN SERVICES CONTRACT RECOMMENDATION: City Council to consider: • adopting a resolution updating and consolidating its authorization and direction to staff to participate in the development of the Links Trail project, and • approving an engineering design services contract with BW2 Engineers, Inc. in an amount of $24,000.00 for design services on the Ruth Wall Road to Gaylord Trail segment of the Links Trail project and take any necessary action. FUNDING: City funds are available from interest generated by the Grapevine Mills Mail Tax Increment Finance District. BACKGROUND: The initial scope of the project extended from Ruth Wall Road to Grapevine Mills Mall with an estimated cost of $2.2 Million. We received $432,904 in Surface Transportation Program — Metropolitan Mobility (STP -MM) and State funds for this project. To compensate for the funding shortfall, staff began planning for a scope reduction from Gaylord Trail to Bass Pro Drive to utilize the Federal funds. Subsequently, another call for projects was issued and the City submitted an application for $934,795 in federal funding for the trail segment extending from Gaylord Trail to Grapevine Mills Mail. We received these State Transportation Enhancement Program (STEP) funds. December 14, 2011 (1:39PM) The funding programmed for these two applications is as follows: (STP -MM) Funding STEP Funding Total Fed & State Local $ 432,904 $ 267,312 $ 934,795 $ 327,699 $ 1,367,699 $ 595,011 CSJ# 364 -06 -0111 0902 -48 -663 The STP -MM funds are now programmed for trail improvements between Ruth Wall Road and Gaylord Trail and the STEP funds are programmed for trail improvements between Gaylord Trail and Grapevine Mills Mall. To clarify the final scope of the project and its two funding programs, staff has prepared a resolution to confirm our agreement with State and Federal representatives. Additionally, staff has requested a proposal from the engineering firm of BW2 Engineers, Inc to prepare the design of the trail segment from Ruth Wall Rd to Gaylord Trail. BW2 is currently under contract with the City for the design the trail segment from Gaylord Trail to Mills Mall. BW2 will consolidate the two trail segments into one bidding package. Staff recommends approval. December 14, 2011 (1.39PM) RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS AUTHORIZING AND DIRECTING STAFF TO PARTICIPATE IN THE DEVELOPMENT OF THE TRAIL LINKAGE BETWEEN RUTH WALL ROAD AND GRAPEVINE MILLS MALL, INCLUDING CONNECTION TO THE GAYLORD TEXAN RESORT AND CONVENTION CENTER, WITH STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM FUNDING AND SURFACE TRANSPORTATION PROGRAM — METROPOLITAN MOBILITY FUNDING; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council of the City of Grapevine adopted a Hike & Bike Trail Master Plan on July 20, 2010; and WHEREAS, the Hike & Bike Trail Master Plan identified a connecting trail system along State Highway 26 from Ruth Wall Road to Grapevine Mills Mall; and WHEREAS, the Statewide Transportation Enhancement Program (STEP) allows for competitive funding of acceptable trail projects; and WHEREAS, the Surface Transportation Program — Metropolitan Mobility (STP- allows for competitive funding of acceptable trail projects; and WHEREAS, Title 23 U.S.C. Section 134 establishes that Metropolitan Planning Organizations and State Transportation Agencies develop transportation plans and programs for urbanized areas of the State; and WHEREAS, Title 23 U.S.C. Section 120 establishes that the Federal share of funding will not exceed eighty percent (80 %) of the cost of the project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated in the preamble are true and correct and are incorporated herein as if copied in their entirety. Section 2. That the City of Grapevine endorses the trail project described above. Section 3. That the City of Grapevine agrees to abide by the stipulations set forth by the STEP and STP -MM programs and any agreements associated with the development of the project. Section 4. That the City Council directs and designates the City Manager or his designated representative as the City's Chief Executive Officer and Authorized Representative to act in all matters in connection with the Transportation Enhancement Project described.above. Section 5. That this resolution shall become effective from and after the date of its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS and this the 20th day of December, 2011. APPROVED: ATTEST' /_f»:Zi]► /: ar7TI, %r 7Xi1 7iyIG RES. _ 2