Loading...
HomeMy WebLinkAboutItem 47 - FP 430 Main AdditionMEMO TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL, AND THE PLANNING & ZONING COMMISSION FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: OCTOBER 18, 2022 SUBJECT: FINAL PLAT APPLICATION LOT 1, BLOCK 1, 430 MAIN ADDITION PLAT APPLICATION FILING DATE ...................................................... October 11, 2022 APPLICANT .................................................... Jason Kilpatrick, Ridinger Associates, Inc REASON FOR APPLICATION ........................ Platting unplatted property into one (1) lot PROPERTY LOCATION ........................................... 216 and 306 E. Northwest Highway ACREAGE................................................................................................................ 0.714 ZONING................................................................................... HC: Highway Commercial NUMBEROF LOTS....................................................................................................... 1 PREVIOUS PLATTING.................................................................................................No CONCEPT PLAN................................................................................................ SP22-07 SITEPLAN....................................................................................................................No OPEN SPACE REQUIREMENT....................................................................................No AVIGATION RELEASE............................................................................................... Yes PUBLIC HEARING REQUIRED....................................................................................No C:\Users\tbrooks\Downloads\Agenda Memo 159537.doc PLAT INFORMATION SHEET FINAL PLAT APPLICATION LOT 1, BLOCK 1, 430 MAIN ADDITION GENERAL: • The applicant, Jason Kilpatrick, Ridinger Associates, Inc. is final platting 0.714 acres into one (1) lot. The property is a Highway Commercial lot and located at 216 and 306 East Northwest Highway. STREET SYSTEM: • The development has access to Northwest Highway • ALL abutting roads: ® are on the City Thoroughfare Plan: Northwest Highway ❑ are not on the City Thoroughfare Plan: ❑ Periphery Street Fees are due as follows: Type of Roadway Cost / LF ❑ Major Arterial (A) $ 234.57 / LF ❑ Major Arterial (B) $ 178.35 / LF ❑ Minor Arterial (C) $ 203.06 / LF ❑ Minor Arterial (D) $ 170.33 / LF ❑ Collector (E) $ 170.33 / LF ❑ Collector (F) $ 150.98 / LF ❑ Sidewalk $ 25.00 / LF ❑ Curb & Gutter $ 15.00 / LF ® Periphery Street Fees are not due: STORM DRAINAGE SYSTEM: Length Cost • The site mainly drains northeasterly into Northwest Highway. • The developer will be required to design for onsite as well as offsite drainage in accordance with the requirements of the City of Grapevine's Code of Ordinances. C:\Users\tbrooks\Downloads\Agenda Memo 159537.doc IV. WATER SYSTEM: ® The existing water supply system bordering the subject site is adequate to serve the development. ❑ The existing water supply system bordering the subject site is not adequate to serve the development. Additional off -site water system improvements will be necessary to loop water service to serve the site. V. SANITARY SEWER SYSTEM: ® The existing sanitary sewer collection system bordering the subject site is adequate to serve the development. ❑ The existing sanitary sewer collection system bordering the subject site is not adequate to serve the development. Owner has submitted construction plans to extend sanitary sewer to this property. VI. MISCELLANEOUS: ® Water and Wastewater Impact Fees are not required for: Lot 1, Block 1, 430 Main Addition ❑ Water and Wastewater Impact Fees are due prior to the issuance of building permits for: ❑ Single Family Residential ( $ 2,388/ Lot) ❑ Multifamily ( $ 1,049/ Unit) ❑ Hotel ( $ 43,606/ Acre) ❑ Corporate Office ( $ 20,572/ Acre) ❑ Government ( $ 4,426/ Acre) ❑ Commercial / Industrial ( $ 5,670/ Acre) ® Open Space Fees are not required for: Lot 1, Block 1, 430 Main Addition ❑ Open Space Fees are due prior to the preconstruction meeting for public infrastructure improvements for: ❑ R-5.0, R-TH, Zero Lot District ( $ 1,416.00 / Lot) ❑ R-7.5, Single Family District ( $ 1,146.00 / Lot) ❑ R-12.5, Single Family District ( $ 1,071.00 / Lot) ❑ R-20.0, Single Family District ( $ 807.00 / Lot) C:\Users\tbrooks\Downloads\Agenda Memo 159537.doc ❑ Public Hearing Only ❑ Variances were required on the following items: ❑ Front building line- ® Highway Commercial Buffer Yard and Rear Setback: AM22-05 Amendments (September 2022) to the Comprehensive Zoning Ordinance No. 82-73 "HC" Highway Commercial District. Allowing an exception to the buffer yard and rear yard requirements between "HC" and Residential Districts along East Northwest Highway This property does not have a front or rear building line ❑ Allowing a setback of 3 feet for the rear property line for an accessory building ❑ Lot width & depth ❑ Max. Impervious Area ❑ Landscaping Regulations, allowing no landscape buffer between the edge of the parking area and the adjacent property line. ❑ The following items associated with this plat are not in accordance with the current subdivision standards: ❑ 50' ROW dedication not met: Developer is proposing to dedicate variable width private access easements throughout the development. The access easements will be owned and maintained by a Home Owners Association (HOA). ❑ Length of cul-de-sac street exceeds the 600-foot limit: ❑ Driveway Spacing not met. VII. STATEMENT OF FINDINGS: A. The City has determined that the right-of-way and easements required to be dedicated for streets, utilities, drainage, access, sidewalks and other municipal needs and services are consistent with the City's ordinances and master plan, are reasonable and are connected to the proposed project in the following manner: ❑ The right-of-way provides for future widening of public streets that will serve the development of this site. ® The onsite utility easements provide for a utility network to serve the development of this site. C:\Users\tbrooks\Downloads\Agenda Memo 159537.doc ® The onsite drainage easements provide for a drainage network to serve the development of this site. ® The onsite access easements provide cross access capabilities to this site and surrounding property. ❑ The onsite sidewalk easements provide for a sidewalk network to serve the development of this site. B. The City further finds that the required dedication is related both in nature and extent to the impact of the proposed development as follows: ❑ The right-of-way is necessary to provide for future widening of public streets that will serve the development of this site. ® The onsite utility easements are necessary to provide for a utility system to serve this development and connect to existing utilities on surrounding property. ® The onsite drainage easements are necessary to provide for storm drainage improvements to serve the development of the site. ® The onsite access easements are necessary to provide cross access capabilities to this site and surrounding property. ❑ The onsite sidewalk easements are necessary to provide for a sidewalk network to serve the development of this site. ® All of the dedications benefit the development to at least the extent of the impact of such on the development. VIII. RECOMMENDATION: The members of the City Council and The Planning & Zoning Commission consider the following motion: "Move that the City Council (Planning and Zoning Commission) approve the Statement of Findings and the Final Plat of Lot 1, Block 1, 430 Main Addition." C:\Users\tbrooks\Downloads\Agenda Memo 159537.doc