Loading...
HomeMy WebLinkAboutItem 19 - Engineering Design Services for Wastewater Treatment Plant Electrical Improvements ProjectMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL 'V FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: DECEMBER 15, 2015 SUBJECT: ENGINEERING DESIGN SERVICES CONTRACT - WASTEWATER TREATMENT PLANT ELECTRICAL IMPROVEMENTS PROJECT RECOMMENDATION: City Council consider: • awarding an Engineering Design Services Contract to Gupta & Associates, Inc. in the amount of $80,710.00 for the design of electrical improvements and repairs of the Wastewater Treatment Plant, • adopting an ordinance appropriating $88,781.00 for the contract award that includes 10% contingency to the FY 2015 — 2016 Utility Enterprise Capital Projects Fund Budget, • authorizing staff to execute said contract, and take any necessary action. FUNDING: Upon approval of the attached ordinance, funds will be available and programmed in the Utility Enterprise Capital Projects fund. BACKGROUND: The wastewater treatment plant has three "Trains"; each of the three Trains treats wastewater independently of the others. The motor control center (MCC) for Train 1 at the wastewater treatment plant (WWTP) has recently had a major electrical failure, can no longer be safely operated and needs to be replaced. Train 1 is the oldest of the three Trains at the wastewater plant. Since the new headworks has been placed on-line, staff can more easily divert flow to Train 1 and utilize its capacity more frequently. Train 1 will also be used so the other two Trains may be put out of service temporarily for maintenance. Trains 2 and 3 are the primary treatment facilities at the wastewater plant. Train 2 currently is not connected to an emergency generator so it does not function properly during power outages. The City owns a trailer mounted/portable generator that may be parked at the WWTP and connected for operation of the Train 2 electrical systems during power outages. This electrical design would include required quick connect and automatic transfer switch. Train 3 is currently connected to an emergency generator, but has operational issues during power outages. The design would investigate these control issues and provide a solution to correct the current operational problems that are faced by providing emergency power where it is needed during outages. The specific items to be addressed in this contract are: • Train 1 MCC replacement design Design = $37,280.00 Construction estimate = $406,224.00 • Train 2 generator quick connect and transfer switch (for power outages) Design = $25,040.00 Construction estimate = $240,240.00 • Train 3 MCC emergency generator switching rewiring Design = $18,390.00 Construction Estimate = $30,000.00 Cost estimate for construction of the work is $676,464.00. The design contract is approximately 12% of the estimated construction costs. Staff recommends approval. Im ORDINANCE NO. ,M•, mom A 0 I an N I] I il, LMAI OR I a 2 2 met I VVJ I WHEREAS, the City Council of the City of Grapevine desires to maintain its Waste Water Infrastructure with regular maintenance, repairs and updates as necessary; and WHEREAS, funding for the maintenance activities, and the design phase services relative to the repairs and updates needed for the Wastewater Treatment Plant is not currently included in the Fiscal Year 2015-2016 Utility Enterprise Capital Projects Fund Budget; and WHEREAS, maintenance, repairs and updates to the Wastewater Treatment Plant is necessary to insure continued optimum operation of the Plant and the City's Waste Water Distribution System. NOW, •' BE IT • BY THE CITY COUNCIL • THE CITY 01 GRAPEVINE, TEXAS: M Section 1. That all matters stated in the preamble of this ordinance are true and correct and are hereby incorporated into the body of this ordinance as if copied in their entirety. Section 2. That the City Council hereby authorizes an amount of $88,781.00 be appropriated from the 2015 Utility Bonds to the Utility Enterprise Capital Projects Budget for design phase services relative to the Wastewater Treatment Plant Electrical Improvements Project. Section 3. That a copy of the revised Fiscal Year 2015-2016 Utility Enterprise Capital Projects Fund Budget document shall be kept on file in the City Secretary's Office and on the City of Grapevine website. Section 4. That the terms and provisions of this ordinance shall be deemed to be severable, and that if the validity of any section, subsection, word, sentence or phrase shall be held to be invalid, it shall not affect the remaining part of this ordinance. Section 5. That the fact that the present ordinances and regulations of the City of Grapevine, Texas are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety, and general welfare which requires that this ordinance shall take effect immediately from and after its passage and it is accordingly so ordained. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 15th day of December, 2015. UNISROAT103 ATTEST: APPROVED AS TO FORM: ORD. NO. 2