Loading...
HomeMy WebLinkAbout11/15/2022 - F211334-1139871Detail Sheet:• Plan Sheet: Grapevine, Texas SY1.1 Not Correct Reinforcement Clean Form Clean Item Observed Correct Grade Reinforcement Number of Reinforcement N/A 1/7/2022 X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct Proper Placement Reinforcement Tied Properly X X 1 of 1 Cloudy 11/17/2022 Off Champagne Boulevard and Merlot Avenue F211334 Technician:Russell, Nicholas Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Foundation and Footings, Storage Building The representative utilized the following provided project plans to perform the observation: Rebar noted in mud during this inspection - Corrected during inspection and found to be compliant. Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Drawings Approved Observation Information X X SY1.1 11/15/2022Service Date:Client:Chicken N Pickle 104 Armour Road North Kansas City, MO 64116 Work Order Number: Project Number: Report Date: Weather: Chicken N Pickle Grapevine 1139871 Project: Alpha Testing, LLC 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report • • Page Number: The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Item Observed Bar Length & Spacing Correct X X Re-Inspection of Non-Compliant Report F211334-1139228. Respectfully Submitted, Remarks: Paul Delaney X Sheathing X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Proper Cover Proper Support Dowels in Place Stirrup Size X X Grade Beam / Column Size Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Correct Splicing