HomeMy WebLinkAboutItem 25 - PP Grapevine Texan Trail Substation4/1. irenn #
MEMO TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL,
AND THE PLANNING & ZONING COMMISSION
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE: JANUARY 15, 2013
SUBJECT: PRELIMINARY PLAT APPLICATION
LOTS 1 & 2, BLOCK 1, GRAPEVINE TEXAN TRAIL SUBSTATION
ADDITION
PLAT APPLICATION FILING DATE ......................... ............................... January 8, 2013
APPLICANT ............................. ............................... Halff Associates, Thomas L. Fletcher
REASON FOR APPLICATION .. ............................... Platting site for electrical substation
PROPERTY LOCATION ......................... Northeast corner of Texan Trail & Dallas Road
SITEACREAGE ...................................................... ............................... ....................3.88
ZONING.............................................................................. ............................... ......LI
NUMBEROF LOTS ........................................................................... ..............................2
PREVIOUS PLATTING .................................................................. ............................... No
CONCEPTPLAN ......................................................................... ........................SU12 -05
SITEPLAN .................................................................................... ............................... No
OPEN SPACE REQUIREMENT .................................................... ............................... No
AVIGATIONRELEASE ..................................................... ............................... ............Yes
PUBLIC HEARING REQUIRED ..................................................... ............................... No
January 2, 2013 (4:42:32 PM)
PLAT INFORMATION SHEET
PRELIMINARY PLAT APPLICATION
LOTS 1 & 2, BLOCK 1, GRAPEVINE TEXAN TRAIL SUBSTATION ADDITION
GENERAL:
• The applicant, Thomas Fletcher is Preliminary Platting this 3.88 acre site for two
lots. Lot 1 will be for a proposed electrical substation and Lot 2 has an existing
warehouse operation. The property is located at the northeast corner of Texan
Trail and Dallas Road.
STREET SYSTEM:
• The development has access to Texan Trail and Dallas Road.
• ALL abutting roads: ® are on the City Thoroughfare Plan: Texan Trail
® are not on the City Thoroughfare Plan:
Dallas Road
El Periphery Street Fees are due as follows:
Type of Roadway Cost 1 LF
❑ Major Arterial (A)
❑ Major Arterial (B)
❑ Minor Arterial (C)
❑ Minor Arterial (D)
❑ Collector (E)
❑ Collector (F)
❑Sidewalk
❑Curb & Gutter
$ 234.571 LF
$ 178.351 LF
$ 203.061 LF
$ 170.33 I LF
$ 170.331 LF
$ 150.981 LF
$ 25.00 I LF
$ 10.001 LF
® Periphery Street Fees are not due:
TOTAL
STORM DRAINAGE SYSTEM:
Length
• The site drains into a storm system into Texan Trail.
Cost
January 2, 2013 (4:42;32 PM)
• The developer will be required to design for offsite as well as offsite drainage in
accordance with the requirements of the City of Grapevine's Code of
Ordinances.
IV, WATER SYSTEM:
® The existing water supply system bordering the subject site is adequate to
serve the development.
❑ The existing water supply system bordering the subject site is not adequate
to serve the development. Additional off site water system improvements will
be necessary to serve the site.
V. SANITARY SEWER SYSTEM:
® The existing sanitary sewer collection system bordering the subject site is
adequate to serve the development.
The existing sanitary sewer collection system bordering the subject site is not
adequate to serve the development.
I. MISCELLANEOUS:
El Water and Wastewater Impact Fees are not required for:
® Water and Wastewater Impact Fees are due prior to the issuance of building
permits: Lots 1 &2, Block 1, Grapevine Texan Trail Substation
❑ Single Family Residential ( $ 2,191 / Lot)
❑ Multifamily
( $ 1,026 / Unit)
❑ Hotel
( $ 38,107 / Acre)
❑ Corporate Office
( $ 18,847 /Acre)
❑ Government
( $ 4,037 / Acre)
® Commercial / Industrial ( $ 5,209 / Acre)
® Open Space Fees are not required for: Lots 1 & 2, Block 1, Grapevine Texan
Trail Substation
El Open Space Fees are required for:
❑ R -5.0, Zero Lot District ( $ 1,416.00 / Lot)
❑ R-7.5, Single Family District ( $ 1,146.00 / Lot)
❑ R -12.5, Single Family District ( $ 1,071.00 / Lot)
❑ R -20.0, Single Family District ( $ 807.00 / Lot)
January 2, 2013 (4:42:32 PM)
❑ Public Hearing Only
❑ Variances were required on the following ems:
❑
Front building line
❑
Rear building line
❑
Lot width & depth
❑
Max. Impervious Area
❑ The following items associated with this plat are not in accordance with
current subdivision standards:
❑ 50' ROW dedication not met: Developer is proposing to dedicate
variable width private access easements throughout the development.
The access easements will be owned and maintained by a Home
Owners Association (HOA).
Length of cul -de -sac street exceeds the 600 -foot limit:
El Driveway Spacing not met.
II. STATEMENT OF FINDINGS:
A. The City has determined that the right -of -way and easements required to be
dedicated for streets, utilities, drainage, access, sidewalks and other
municipal needs and services are consistent with the City's ordinances and
master plan, are reasonable and are connected to the proposed project in
the following manner:
❑ The right -of -way provides for future widening of public streets that will
serve the development of this site.
® The onsite utility easements provide for a utility network to serve the
development of this site.
❑ The onsite drainage easements provide for a drainage network to
serve the development of this site.
The onsite access easements provide cross access capabilities to this
site and surrounding property.
January 2, 2013 (4:42:32 PM)
❑ The onsite sidewalk easements provide for a sidewalk network to
serve the development of this site.
B. The City further finds that the required dedication is related both in nature
and extent to the impact of the proposed development as follows:
❑ The right -of -way is necessary to provide for future widening of public
streets that will serve the development of this site.
® The onsite utility easements are necessary to provide for a utility
system to serve this development and connect to existing utilities on
surrounding property.
❑ The onsite drainage easements are necessary to provide for storm
drainage improvements to serve the development of the site_
❑ The onsite access easements are necessary to provide cross access
capabilities to this site and surrounding property.
The onsite sidewalk easements are necessary to provide for a
sidewalk network to serve the development of this site.
® All of the dedications benefit the development to at least the extent of
the impact of such on the development.
Ill. RECOMMENDATION:
The members of the City Council and The Planning & Zoning Commission
consider the following motion: "Move that the City Council (Planning and
Zoning Commission) approve the Statement of Findings and the Preliminary
Plat of Lots 1 & 2, Block 1, Grapevine Texan Trail Substation Addition ".
January 2, 2013 (4:42:32 )
- "' A%Q
CITY OF GRA I- r-A;'-)r-VINE, r
TYPE OF PLAT. Preliniinary Final Reolat Amendment
PROPE RTY DESCRIPTION:
Name of Addition
?-7
Number of Lots: Gross Acreage: r" Proposed Zoning:
Location of Addition:
PROPERTY OWNER:
Name-1f %.V df-at
Address: JOV) V
State: Zi
Signature.
APPLICANT:
Contact: t J'Aca
6-,1'UjCity-. 'Cia
Phone:
+
Name: PvqSoc-til TV-- s Contact:
V, -'.� '�Z, ?:7 7 -
Address: '2, b.
city-.
e
State: Zip :
Phone:
Fax:
.15- 6- � 'l
j
�J-
V
Signature:
,
SURVEYOR.
Name: tVht-•F-E: V, -7 Contact:
Address., 4000 ftv-�At- Wu%IX City: Foy:-y 00%.T%A
State: 'FA Zip- :1(,-k !-,J- - Phone- (Nj)
Fax: (Oil) ',LV4 - J- r?,
FOR OFFICE USE ONLY
Application Received: I Z / Ze (2-
Fee Amount., $ ZCZ2 <LK-)
By:
Check Nurflbbr: