Loading...
HomeMy WebLinkAboutItem 06 & 07 - 49th Year CDBGMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: FEBRUARY 21, 2023 SUBJECT: PUBLIC HEARING FOR THE 49TH YEAR COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM RECOMMENDATION: City Council to conduct a Public Hearing to receive public input relative to the proposed 49th Year Community Development Block Grant (CDBG) Program street reconstruction project and authorize staff to proceed with the application submittal to Tarrant County. FUNDING SOURCE: Funds are available in the Capital Project Street Fund and Utility Enterprise Capital Fund in the estimated amount of $1,147,500. BACKGROUND: The scope of the project is the reconstruction of approximately 870 linear feet of a 30' wide asphalt pavement residential roadway along Forest and Lipscomb Streets connecting to Lucas Drive. This project will include curb and gutters, sidewalk, barrier -free ramps, and drive approaches. In addition, a storm drain system will be installed and the existing sanitary sewer will be upgraded as needed. The roadway reconstruction project is located in the Original Town of Grapevine, CDBG Target Area designated as census tract 1137.03 Block Group 4, in the Housing and Urban Development (HUD) Low/Moderate Income Survey Data (LMISD). These improvements will contribute to the upgrade of the areas by providing an improved travel surface for motorists and pedestrians in the neighborhood. The construction cost estimate for this project, including engineering, is $1,322,500 of which approximately $175,000 is expected to be provided by Tarrant County. The City's match is expected to be $1,147,500. Engineering costs estimated to be $172,500 are paid for by the grant. The application process requires that the following statement be included in the memo: "The City shall be responsible for all costs of the 49th Year CDBG project that exceeds the amount of the grant fund." Staff recommends approval. CRAP VINE 49th year CDBG °T H X A S' ® Project Limits nGy, I` ""fir v - 0 rn v 11 ' - %%UTUMN DR Qr Z 0 SHADYBROOI� A Qto BEND `DO I_ t21 i 0 1=1', ! Q I "' I DFW AIRPORT