HomeMy WebLinkAboutItem 09 - Train 2 ClarifierMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE: FEBRUARY 21, 2023
SUBJECT: TRAIN 2 CLARIFIER REPLACEMENT AND APPROPRIATION
ORDINANCE
RECOMMENDATION: City Council to consider approving a contract with Alltech Engineering
Corporation for the construction of the Train 2 Clarifier replacement
project and an ordinance appropriating the funds.
FUNDING SOURCE: Upon approval of the above recommendation, funds will be available in
the Utility Enterprise Capital Fund in the estimated amount of $2,165,596.
BACKGROUND: The WWTP has three trains, each of which can be operated
independently of the others. However, during normal operations, two of
three trains must be operational. The Train 2 clarifier was constructed in
1986. While ongoing maintenance and repairs have occurred, the clarifier
is in need of replacement. The proposed project will replace all the
mechanical components leaving only the original concrete basin which will
be rehabilitated.
On February 15, 2022, City Council approved an engineering services
agreement with Providence Engineering in the amount of $325,000 to
design new clarifier components for the existing two clarifier basins of the
Train 2.
Request for Competitive Sealed Proposals was advertised to consider not
only the bid process (75% of weight), but also bidder's qualifications
(10%), construction experience (10%) and safety record/litigation history
(2.5%) and project closeout (2.5%).
Bids were opened on February 7, 2022 with 4 bids received as follows:
Contractor Bid Amount Score
Alltech Engineering Corporation $ 1,940,596 96.5
Felix $ 2,194,620 87.2
Schofield $ 2,277,620 85.0
MH Civil Constructors. $ 2,540,000 74.8
Alltech Engineering Corporation received the highest score. Additionally,
staff has had recent experience with Alltech on the Train 1 clarifier and UV
disinfection system improvements at the Wastewater Treatment Plant.
Staff has also included $225,000 or 11 % in construction related costs [(5%
construction contingency, 4% inspection and 2% materials testing
($213,465.56 rounded to 225,000)] . This brings the total construction
phase appropriation to $2,165,596. The contractor has 395 calendar days
to complete the project after the Notice to Proceed is issued.
Staff recommends approval.
ORDINANCE NO. 2023-007
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS, AUTHORIZING THE APPROPRIATION
OF $2,165,596 IN THE UTILITY ENTERPRISE CAPITAL
FUND; DECLARING AN EMERGENCY AND PROVIDING AN
EFFECTIVE DATE
WHEREAS, the City Council of the City of Grapevine desires to fund the Train 2
Clarifiers Replacement project; and
WHEREAS, funding is available in the Utility Enterprise Capital Fund; and
WHEREAS, all constitutional and statutory prerequisites for the approval of this
ordinance have been met, including but not limited to the Open Meetings Act and Chapter
211 of the Local Government Code; and
WHEREAS, the City Council deems the adoption of this ordinance to be in the best
interests of the health, safety, and welfare of the public.
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS:
Section 1. That all matters stated hereinabove are found to be true and correct
and are incorporated herein by reference as if copied in their entirety.
Section 2. That the City Council hereby authorizes the appropriation of
$2,165,596 in the Utility Enterprise Capital Fund to fund the Train 2 Clarifiers Replacement
project.
Section 3. That a copy of the revised FY 2022-2023 Annual Budget document
shall be kept on file in the office of the City Secretary.
Section 4. That the terms and provisions of this ordinance shall be deemed to be
severable, and that if the validity of any section, subsection, word, sentence or phrase
shall be held to be invalid, it shall not affect the remaining part of this ordinance.
Section 5. That the fact that the present ordinances and regulations of the City of
Grapevine, Texas, are inadequate to properly safeguard the health, safety, morals, peace
and general welfare of the inhabitants of the City of Grapevine, Texas, creates an
emergency for the immediate preservation of the public business, property, health, safety
and general welfare of the public which requires that this ordinance shall become effective
from and after the date of its final passage, and it is accordingly so ordained.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS on this the 21st day of February, 2023.
APPROVED:
William D. Tate
Mayor
ATTEST:
Tara Brooks
City Secretary
APPROVED AS TO FORM:
Matthew C.G. Boyle
City Attorney
Ordinance No. 2023-007 2
TO SECONDARY
CLARIFIER
SPRAY BAR
1"0 TYPE 316 SS
GRADE LINE PIPING, TYP
FR(16TIINF
V NPT SS TEE
24"CRUSHED = INSTALL FLOMATIC
STONE OR GRAVEL VALVE 70 AUTO DRAIN
4501SSX OR APPROVED
EQUAL
1"0 TYPE 316 SS
_ PIPING, TYP
FROM WATER pp—Ier�,�
SUPPLY
1" NPT SS TEE
1" VALVE IN VALVE
BOX
POTABLE 1"BURILE DETAIL NOTES
PWATER 1 1"PIPING SHOWN FOR EXAMPLE ONLY
PIPE SEE DETAIL CONTRACTOR TO FIELD VERIFY PIPE SIZE OF
NOTE 2. EXISTING SPRAY BAR AND MATCH EXISTING PIPE
SIZE
2. CONTRACTOR TO FIELD VERIFY SIZE AND
MATERIAL OF BURIED POTABLE WATER PIPING
AND MATCH EXISTING.
TOP OF CONCRETE
AT WALL ELEVATION
m= 565.08
SPRAY BAR AUTO DRAIN DETAIL
SEE DETAILS ON
SHEET D701
TOP OF WALL
ELEVATION = EL 750
WATER SU RFACE
ELEVATION = EL 575.25
APPLY GROUT AS INDICATED
ON D103
56'-0..
INSIDE DIAMETER
CONTROL PANEL *
SEE NOTE 1.
THIS SHEET
CI L ELEVATION
W INFLUENT
CL ELEVATION = 563 00
CLARIFIER ILLUSTRATIVE SECTION
SCALE�IN FEET
TRAIN 1 CLARIFIER - EXISTING CLARIFIER WALKWAY
NOTES
1. MATCH PROPOSED ELECTRICAL CONDUIT FOR TRAIN 2 TO EXISTING TRAIN 1
ELECTRICAL CONDUIT.
EXIST 10" DRAIN LINE TO
BE ABANDONED IN PLACE
—
NOTES
1. CONNECTION DETAILS TO BE PROVIDED BY CLARIFIER MANUFACTURER. CONTRACTOR
SHALL FIELD VERIFY ALL DIMENSIONS AND COORDINATE MATH CLARIFIER MFR PRIOR TO
FABRICATION
2 THE ACCESS STAIRS AND BRIDGE FOR CLARIFIER NO 2 SHALL BE LOCATED MIRROR
CONNECT TO NEW
IMAGE OF CLARIFIER NO I, OFFSET APPROXIMATELY 45 DEGREES NORTHWEST OF
POTABLE WATER
EXISTING LADDER ACCESS
EXTENSION SEE
NOTE 6, D103
3. ITEMS DESIGNATED WTH AN- TO BE PROVIDED BY THE CLARIFIER MANUFACTURER
4 EXISTING ELECTRICAL CONDUIT AND POTABLE WATER PIPING SHALL BE EXTENDED TO
SPRAY BAR AUTO
THE LOCATION OF THE NEWWALKWAY AND RECONNECTED TO THE EXISTING
DRAIN SEE DETAIL
COMPONENTS ON THE WALKWAY CONTRACTOR SHALL FIELD VERIFY SIZE OF CONDUIT
THIS SHEET.
AND SIZE AND MATERIAL OF PIPING AND MATCH EXISTING. COORDINATE MATH OWNER
CONCRETE
FOR SUPPORT LOCATIONS AND DETAILS.
FOOTING
SEE DETAIL
S. SPRAY BAR DIA.TO MATCH EXISTING. SPRAY BAR MATERIAL TO BE 316 SS. NOZZLE
SHEET D701
LOCATION AND SIZE TO MATCH EXISTING SPRAY BAR TO BE SLOPED AWAY FROM
CENTER OF CLARIFIER TO ALLOW FOR DRAINAGE OF SYSTEM TO THE AUTO DRAIN
CONTRACTOR TO SUPPORT STAINLESS STEEL PIPING TO WALKWAY AS NECESSARY.
6. THE SPRAY NOZZLES SHALL BE OF ONE-PIECE CONSTRUCTION AND SHALL HAVE A CLEAR
OPENING WHICH IS NOT LESS THAN ONE -QUARTER INCH IN DIAMETER AT THE SMALLEST
POINT WHILE IN OPERATION. EACH NOZZLE SHALL BE CAPABLE OF DELIVERING 2.5
GALLONS PER MINUTE OF NON -ATOMIZED LIQUID IN A FLAT, UNIFORMLY -DISTRIBUTED
PATTERN WATHIN A SPRAY ANGLE OF NOT LESS THAN ONE HUNDRED -FIVE DEGREES.
7. INSTALL EFFLUENT WEIR PLATE AND SCUM BAFFLE TO MATCH ELEVATIONS DETERMINED
IN RPLS SURVEY.
k L
Z
K
Q 0'
F W
U
W
� N U
N
W H Z
11 W
0-' > as
0 QKa S
N F 3N
IQZL O 0 Q2
y f a U a
oxnnm av� IK
.—TID NWl 2201
-.T—.. 210004
D104
SHEET 14 OF 15
n ) v Aie THESE DOCUMENTS ARE
ISSUED FOR INTERIM
•°f, REEW ONLYANDARE
VI
y ! A� PROVENANCE NOT INTENDED FOR
T (�' � ENGINEERING CONSTRUCTION,
TEXAS nom•ane•wmwalro,r�e.�^� BIDDING,
OR PERMIT PURPOSES
cM^•
°`� asx�05�
VERIFY SCALE AW bcALEAcwR1— e,�atos,sa uxwene«i n z:. ¢,�.�as,,,, . w«. o,orei•�—' m^
z�
$
SHEETTITLE
^
U J
m
o
m
TRAIN 2 CLARIFIER PERSPECTIVE VIEW
y
m
PROJTITLE
ECT
o
mCITY
OF GRAPEVINE
O
u
gq
S'o
PEACH ST. WWTP TRAIN 2 CLARIFIER REPLACEMENT