Loading...
HomeMy WebLinkAboutF211334-1038002Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: FG-1.0 3 6 15 Sanitary Sewer Line SS-2 (Manhole), Station 4+82.13, South Quadrant FG 3 6 124.7 106.3 approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering This report is in general compliance with one or more of the following technical standards: D6938-15 Respectfully Submitted, Paul Delaney Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ 13 124.3 105.8 17.5 Standard Count:(D):3141 (M):325 96 14 Sanitary Sewer Line SS-2 (Manhole), Station 4+82.13, East Quadrant 17.3 Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) General Location Area:Utilities Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Field Test Data 100 100 3 16.5 110.3 0 4 95 100 2 22.4 1 15.5 109.5 0 4 1 96.4 20Brown, Light Brown, Gray, and Red Sandy Clay Dark Brown and Brown Clay with Sand 38 Red and Brown Clayey Sand 33 958 0 4 952 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data Alpha Testing, LLC 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report 1 104 Armour Road Report Date: 4/29/2022 North Kansas City, MO 64116 Weather: Clear Work Order Number: 1038002 Grapevine, Texas Page Number: 1 of Client:Chicken N Pickle Service Date: 04/27/2022 106.6 16.8 97Sanitary Sewer Line SS-2 (Manhole), Station 4+82.13,West Quadrant FG-2.0 3 6 124.5 114.4 93.2 Project:Chicken N Pickle Grapevine Project Number: F211334 Off Champagne Boulevard and Merlot Avenue Technician: Sullivan, Maddox 97 23.9 97 96 96 96 96 97 96 105.5 17.1 96 22.7 97 96 9 Storm Drain Line SD-2G (Inlet), Station 0+96.57, Westside FG-2.0 2 6 12 Sanitary Sewer Line SS-2 (Manhole), Station 4+82.13, North Quadrant FG-3.0 3 6 11 Storm Drain Line SD-2G (Inlet), Station 0+96.57, Southside FG 92.9 23.5 123.5 114.7 93.1 23.226 10 Storm Drain Line SD-2G (Inlet), Station 0+96.57, Eastside FG-1.0 2 6 6 Storm Drain Line SD-2B (Inlet), Station 2+45.63, Southside FG-1.0 1 6 7 Storm Drain Line SD-2B (Inlet), Station 2+45.63, Northside FG 1 6 FG-3.0 2 6 115.5 93.5 23.5 3 Storm Drain Line SD-2 (Inlet), Station 9+26.24, Eastside FG-1.0 2 6 2 Storm Drain Line SD-2 (Inlet), Station 9+26.24, Westside FG-2.0 2 6 114.7 92.6 1 Storm Drain Line SD-2 (Inlet), Station 9+26.24, Northside FG-3.0 2 6 114.1 123.6 92.1 114.7 5 Storm Drain Line SD-2B (Inlet), Station 2+45.63, Eastside FG-2.0 1 6 4 Storm Drain Line SD-2 (Inlet), Station 9+26.24, Southside FG 2 6 124.0 8 Storm Drain Line SD-2G (Inlet), Station 0+96.57, Northside 105.3 17.4 92.8 23.0 96 106.2 16.8 97 114.7 123.8 105.6 17.2 24.1114.3 93.2 23.1