Loading...
HomeMy WebLinkAboutItem 08 - Aggregate Materials ITEIlt`'h MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER bilk MEETING DATE: SEPTEMBER 1, 2009 SUBJECT: AWARD OF ANNUAL CONTRACT RENEWAL OF BID 291-2007 FOR VARIOUS AGGREGATE MATERIALS RECOMMENDATION: City Council to consider an annual contract renewal to TXI, Inc., Hanson Aggregates, U.S. Silica, Big Sandy Sand, and Top Way Properties for various aggregate materials. Annual expenditures will be limited to the budgeted amount for this service. FUNDING SOURCE: Funds will be limited to the budgeted amount for the following accounts: 325-48899-415-06-0008 (Lease Fund/ Cap. Equip. Plan/ Infrast./ New Streets) 210-42205-340-2 (Lake Enterprise Fund/ Grounds Maintenance/ Course Maintenance) 100-42205-312-3 (General Fund/ Parks Maintenance/ Chemical Supplies) BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid advertisement was posted in the Fort Worth Star Telegram on June 17, 2007 and June 24, 2007. The bid was opened publicly on June 29, 2007. The purpose of this bid was to establish annual fixed pricing for various types of aggregate materials required on an as-needed basis by the Street Division and Parks Department. Bids were sent to eleven contractors. Four contractors responded. This bid requested fixed annual pricing (delivered and picked up) for 26 types of aggregate material. Of the four vendors that responded to the bid, three offered pricing as requested for both a delivered and picked up price. One vendor offered only delivered pricing and that vendor was only low on two of the 26 items. To insure the availability of supply, Staff recommended awarding primary contracts to the lowest bids received for each item where both a delivered and picked up price was bid. In addition, Staff recommended awarding secondary contracts to the vendors that were second low bid. Council initially approved contracts with TXI, Inc., Hanson Aggregates and Top Way Properties on July 17, 2007. The contracts were for an initial one-year period with options to renew for four additional one-year periods. If renewed, this would be the second one-year renewal period. All vendors have provided this service in the past with satisfactory results and agreed to renew the contract at no additional change in pricing. Staff recommends renewal of contracts to TXI, Inc., Hanson Aggregates, U.S. Silica, Big Sandy Sand, TXI Coppell, and Top Way Properties for various aggregate materials that each were low bid on as primary suppliers. GR Aggregate Materials - Sand ,a+ $= 'sue, TX! Top Way Hanson U.S. Silica 2008/09 2009/10 2008/09 2009/10 2008/09 2009/10 2008/09 2009/10 Description Price Price Price Price Price Price Price Price Manafactured Sand for De-Icin• -Delivered $15.54 $15.54 M- - - 1 -• S- • • D--I • -P -• U' $5.50 $5.50 Pea Gravel-Delivered $25.04 $25.04 Pea Gravel- Picked U• $16.00 $16.00 Concrete Sand-Delviered $21.04 $21.04 Concrete Sand-Picked Up $12.00 $12.00 3/4"Crushed Limestone-Delivered $20.04 $20.04 3/4"C -• L - • - -Pi k-• U.U AMIN. $10.00 $10.00 Unwashed Cushion Sand-Delivered $15.04 $15.04 Unwashed Cushion Sand-Picked Up $6.00 $6.00 1"Washed Limestone-Delivered $20.04 $20.04 1"Washed Limestone-Picked Up $10.00 $10.00 Rap Rock 2"to 5" -Delivered $19.04 $19.04 1:7710:1Wilti 11. 1lEl ll • $9.00 $9.00 Sand Loam To• Soil-Delivered $21.50 $21.50 Sand Loam To• Soil- Picked Up $11.50 $11.50 Cla /Sand Mixture-Delivered n/a n/a Cla /Sand Mixture-Picked Up n/a n/a Baseball Cla -Delivered n/a n/a Baseball Cla -Picked U• n/a n/a Baseball Cla Screened)-Delivered n/a n/a ase•a ay creene. - •is e• U p n/a n/a Flexible Base-Delivered $16.05 $16.05 Flexible Base-Picked U• $6.50 $6.50 Rap Rock 6"to 8" -Delivered $19.65 $19.65 I;FT7:Z•Zaz:3if :lle arn7.111WIIIIMIM $10.00 $10.00 To• Dressin. $16.00 $16.00 Tee Box Sand $17.50 $17.50 Sand Trap Sand $16.00 $16.50 Top Dressin• - Delivered $36.74 $36.74 Tee Box Sand-Delivered $37.24 $37.24 4:1117.1".11E► 1TOBT11 - $38.63 $38.24 ems,= _�., 0.0% 0.0% 0.0% -$0.01 Aggregate Materials - Sand Aggregate Materials - Sand TXI -Coppell Bid Sandy Sand 2008109 2009/10 2008/09 2009/10 Description Price Price Price Price 2:27 Sand Cement- Delivered $32.55 $32.55 :k , 2:27 Sand Cement- Picked Up $22.50 $22.50 Cement Treated Base(CTB) - Delivered $32.05 $32 05 Cement Treated Base(CTB) - Picked Up $22.00 $22.00 & Sand &Organic Mixed - Delivered }::} $32.00 $32.00 Sand &Organic Mixed - Picked Up $23.00 $23.00 ee :ox an. - Be were. LL '° $25.00 $25.00 0.00% 0.00%