Loading...
HomeMy WebLinkAboutSFADD2022-003666To: City of Grapevine Inspections/Permits Date September 25,2023 We (General Contractor) at 3703 Lakeview Dr, 76051 are respectfully requesting a onetime building permit # SFADD-22-3666 extension. Reason for extension is due to material and construction delays created by sub -contractors. Foundation/ excavation sub -contractor started December-5,2022. However, due to equipment failures and pier drill rig availability, they did not complete the foundation till February 17, 2023. Creating a delay of approximately 5 weeks. On December 12, 2022, framing sub -contractor ordered the engineered structural beam (which had a 6-to-8-week lead time). The engineered beams arrived February 6, 2023. However, they did not meet the structural engineered drawing requirements. New beams were ordered, they arrived March 27,2023 creating a 9- week framing delay. The framing sub -contractor created many rework and structural framing defects, due to several reasons, which required unscheduled rework opportunities. The Architect and Engineer of record had to write a formal deficiency notice to the framing sub -contractor. This led to multiple delays and no It from the framer. A formal 72-hour letter to cure was sent (which gives the sub -contractor 72 hours to respond with a written plan of action to resolve deficiencies and complete contract scope). This was a very grueling process, which led to a formal termination and hiring a of a new framing subcontractor. Creating an approximate 2-month delay. New framing contractor started June 21,2023... All the accumulated delays pushed the electrical and mechanical contractors start date out approximately 20 weeks. The MEP sub contractors have started and are fitting us into there schedule, but with limited workforce. Please grant this onetime permit extension. Rc, 'tK 1peci 1 Louis Floyd Tanya Foster ADDRESS 3703 Lakeview Dr. Grapevine, TX 76051 LEGAL Grapevine Lake Estates Blk 5 Lot 4 S PERMIT HOLDER Foster, Tonya OWNERS •Foster, Tonya INSPECTIONS 13 1. MISC. Plumbing Inspection 2. Plumbing Sewer 3. Plumbing Water Service 4. Plumbing Rough In 5. Plumbing Shower Pan 6. Plumbing Tub Seal 7. Plumbing Top Out 8. Plumbing Water Heater 9. Plumbing Gas Service 10. Plumbing Temp Gas 11. Plumbing Customer Sevice Inspection 12. TCEQ Backflow Certification Submit 13. Plumbing Final INFORMATION FIELDS Square Footage 2200 FEE TOTAL PAID DUE Plumbing Permit Fee SFR $ 89.78 $ 89.78 $ 89.78 TOTALS $ 89.78 $ 89.78 $ 0.00 The granting of this permit does not presume to give authority to violate or cancel the provisions of City, State, or other local laws regulating construction or the performance of construction. All provisions, laws, and ordinances governing this type of work shall be complied with, whether specified or not and shall be enforced at any and all times. City of Grapevine Plumbing Permit SFR {SQUARE FEET} #23-001207 Project Description: Plumbing for Addition (Kitchen, Master bath and Guest bath) Issued on: 04/11/2023 at 10:27 AM by: Courtney Cogburn MYGOV.US 23-001207, 04/11/2023 at 10:27 AM Issued by: Courtney Cogburn Page 1/1