HomeMy WebLinkAboutPLIRR2014-2017 - LETTER OF COMPLIANCEFeb.11.2016 12:30 PM PAGE. 1/ 1
Mid- Citios lim don
1901 -A BWt'orra Rd
FEB 1520% Bedford,.Ti 7021
817- 5401559
FINAL CHECK LIST
PERMIT N: 14 -2017 ADDRESS: 1827'GR'EENHAVEN LANE, GRAPEVINE, TX 76US1
1. FINAL WALK THROUGH TO EXPLAIN THE OPERATION OF THE SYSTEM
2. MAINTENANCE CHECKLIST:
A. THE MANUFACTURER'S MANUAL FOR THE AUTOMATIC CONTROLLER
B. A SEASONAL (SPRING, SUMMER, FALL, WINTER) WATERING SCHEDULE
C. A LIST OF COMPONENTS THAT REQUIRE MAINTANANCE AND RECOMMENDED
FREQUENCY FOR SERVICE,
41 CHECK AND CLEAN NOZZLE'S MONTHLY FOR CORRECT-C-OVERAGE
#2 TEST RAIN /FREEZE SENSOR EVERY MONTH
#3 SERVICE AND CLEAN Y STRAINER YEARLY
1 THIS IRRIGATION SYSTEM HAS BEEN INSTALLED IN ACCORDANCE WITH ALL APPLICABLE
STATE AND LOCAL LAWS,. ORDINANCES,. RULES,. REGULATIONS. OR ORDERS, I HAVE
TESTED THE SYSTEM AND DETERMINED THAT IS HAS BEEN INSTALLED ACCORDING TO
THE IRRIGATION PLAN AND IS PROPERLY ADJUSTED FOR THE EFFICIENT OF WATER AT
THIS TIME
4. PERMANENT STICKER: COMPANY AND WARRANTY DATES
5, IRRIGATION PLAN TO OWNER
OWNER OR OWNER'S REPRESENTATIVE