HomeMy WebLinkAboutItem 29 - ValveMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: NOVEMBER 7, 2023 SUBJECT: RATIFICATION OF RAW WATER VAULT VALVE PURCHASE RECOMMENDATION: City Council to consider the ratification of the emergency purchase of a valve for the raw water vault from Rangeline Utility Services LLC. FUNDING SOURCE: Funds are available in the Utility Enterprise Fund in the estimated amount of $100,000. BACKGROUND: This ratification authorizes the installation of two, 30" valves on piping within our raw water vault supply located on the downstream side of the dam. This includes the purchase of a new 30" valve and the installation of a second 30" valve that the City has in the warehouse. The raw water vault is the diversion structure used to convey water released from the lake to the raw water pump station that feeds untreated water to the Water Treatment Plant. There is currently one valve that cannot be operated and is in need of replacing. These valves will allow for better control of the intake flows to the raw water pump station. The valve being ordered has a 16-week lead-time. Early next year the US Corps of Engineers has repairs planned to the downstream stilling basin and our valves will be replaced at the same time since the Corps will temporarily shut off all water being released from the dam structure. Rangeline Utility Services LLC is the only contractor that provided a responsive bid to this project and had the required welders to complete this work. The proposed work is estimated to be $95,472 and rounded to $100,000 for additional contingencies that may be discovered as the work commences. Staff recommends approval. N 17 N O 00 N 0 U 6 E N U O Of 0 0 !_ 7 ry 3 0 w w Cn 0 0 Q / 'o Of V) 3 w C N d O 0 I N 0 0) 0 0 0 / Q) I w / ,ri JL REPLACE E NG V VAULT CONCRETE TOP SLAB AND IN L CO HATCH. MINIMUM 8" THICK SLAB, 4, SI CONCRETE, WITH #6 AT 12" O.C. APP B SIZE IS 6.5'X10.75' SEE INSET V B W 30" W i 30„ x —Jew 0 -- r� _X STING 79" nPFN TnP DENTOtA CREEK OV REMOVE EXISTING 30" GATE VALVE AND INSTALL I \I NEW 30" BUTTERFLY VALVE AND MECHANICAL 1�� , • ACTUATOR INSIDE EXISTING VAULT (E) _ TOP OF PIPE ELEVATION APPROXIMATELY 476.0 0 o T /30 -GROUND ELEVATION APPROXIMATELY 495.25 X . I / SEE INSET VIEW A 30„ !— x x o/ X X � X xo0 e \ INSTALL NEW 30 BUTTERFLY = / - \ VALVE WITH MECHANICAL ACTUATOR INSIDE VAULT (S) \ \ SEE INSET VIEW A I , - - -- -------- GRAPHIC SCALE IN FEET 0 5 10 20 ON 11 "X17" SHEET, SCALE IS 1 "=20" X X W. \ / �x w �/ I \moo\ UNITED STATES OF AMERICA � TRACT NO. A-4 0 /, 20 = / VOL. 2021, PG. r 1 \\ T D.R.T.C.. _ X 8„ w , o\ 30"_ " W --I� 0W I N I \ 30" W EXISTING RAW WATER X 0 PUMP STATION oz = X \0- N� I, X/ 8" IR 8"'I IR - 8" IR 8" I C�� 8" IR 8" IR 8" IR EXISTING GOLF COURSE IRRIGATION PUMP STATION TO BE UPGRADED IN FUTURE 12" WL 7 E OHE OHE - OHE--- OHE OHF OAF Replace existing gate valve R 1� Inset View A: Tee location inside vault showing the valve to be replaced and the location of the new valve to be installed Inset View B: Location of valve vault concrete slab to be replaced and Bilco hatch to be installed. a) 41 m O N ti d: 0 m z HJNZ(n WEtz - W �a coo IWL d J U Z w 00 U') ~ U ~ M O O Z W w� W J � � U��z0 O Q o 0 N Z Z Z U J Q =Z000 lyj w Q �Qwzm to 0 W Cl) Z � a > w W Z a 0 Q a �~ a LL a 0 W F- Q V � n N E U > J 0 U O 73 O Q o O (n Q Ld Q Q W CK 0 0 0 U Y SHEET AWL Y