Loading...
HomeMy WebLinkAboutItem 43 - FP The Bluffs4z 0 o MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL, AND THE PLANNING & ZONING COMMISSION FROM: ROGER NELSON, CITY MANAGER*, -.*, MEETING DATE: MAY 16, 2000 SUBJECT: FINAL PLAT APPLICATION LOT 1, BLOCK 1, THE BLUFFS AT GRAPEVINE PLAT APPLICATION FILING DATE............................................................. May 5, 2000 APPLICANT....................................................... Mr. Rick Horn, Carter and Burgess, Inc. REASON FOR APPLICATION ........................................... Platting site for the proposed development of a retail complex PROPERTY LOCATION ........................................... Northwest corner of Bass Pro Drive and State Highway 26 SITEACREAGE.................................................................................................... 19.992 ZONING.............................................................................. CC, Community Commercial NUMBEROF LOTS.........................................................................................................1 PREVIOUS PLATTING ............................................ Preliminary Plat: February 15, 2000 CONCEPTPLAN................................................................................................ CP00-04 SITEPLAN.............................................................................................................. None OPEN SPACE REQUIREMENT.................................................................................. No AVIGATIONRELEASE............................................................................................... Yes PUBLICHEARING REQUIRED................................................................................... No 0:\AGENDA\05-16-00\BLUFFS F.doc PLAT INFORMATION SHEET FINAL PLAT LOT 1, BLOCK 1, THE BLUFFS AT GRAPEVINE GENERAL: 1. Mr. Rick Horn, the applicant, is platting this 19.992 acre site for the proposed development of a retail complex. This property is located on the northwest corner of Bass Pro Drive and State Highway 26. 2. The property is currently undeveloped. STREET SYSTEM: 1. This site has access to State Highway 26, a six lane divided street that is part of the State Highway System. 2. This plat will dedicate 90 feet of right-of-way for the construction of the extension to Bass Pro Drive at its intersection with State Highway 26 in order to accommodate an eastbound left turn lane. The plat will also dedicate 60 feet of right-of-way for the remainder of the roadway section west of the intersection. 3. The developer is responsible for the signal and median modifications associated with the State Highway 26 intersection. STORM DRAINAGE SYSTEM: 1. The on-site and off-site storm drainage systems must be designed in accordance with the requirements of the City of Grapevine's Code of Ordinances. IV. WATER SYSTEM: 1. There is an existing 12 -inch water line that runs through the property from the southwest corner towards the northeast corner. 2. The development of this property will require the relocation of a portion of the existing 12 -inch water line. 3. The developer will be required to construct a public water distribution system necessary to meet domestic and fire protection needs of this development. 4. The existing water distribution system is adequate to serve the domestic and fire protection needs of this and future surrounding developments. V. SANITARY SEWER SYSTEM: 1. There is an existing 8 -inch sanitary sewer force main that runs through the property from the southwest corner towards the northeast corner. 2. The development of this property will require the relocation of a portion of the existing 8 -inch sanitary sewer force main. 3. The developer will be required to construct a public sanitary sewer collection system to meet the needs of this development. 4. The City has worked with this developer to construct a proposed sanitary sewer lift station within the limits of this property to provide sewer service to this development as well as the Cowboy Golf Course and the City's Water Treatment Plant. 5. The existing sanitary sewer collection system adjacent to and downstream of this property is being reviewed by Freese and Nichols to determine its adequacy. VI. MISCELLANEOUS: 1. Water and Wastewater Impact Fees are due prior to the issuance of any building permits. The current fee is $5,402.00 per acre. VII. STATEMENT OF FINDINGS: A. The City has determined that the right-of-way required to be dedicated for streets, utilities, drainage and other municipal needs and services are consistent with the City's ordinances and master plan, are reasonable and are connected to the proposed project in the following manner: 1. The utility easements dedicated by this plat are necessary to provide for public and franchised utility service to this and surrounding developments. 2. The drainage easements dedicated by this plat are necessary to convey storm drainage through this development. 3. The access easements dedicated by this plat are necessary to allow for increased vehicular mobility within this property. 4. The right-of-way dedicated by this plat is necessary to provide for the development of the surrounding transportation system. B. The City further finds that the required dedication is related both in nature and extent to the impact of the proposed development as follows: The utility easements dedicated by this plat will allow for public and franchise utilities to serve this development and surrounding sites. 2. The drainage easements dedicated by this plat are necessary to convey storm drainage through this development. 3. The access easements dedicated by this plat will allow for increased vehicular mobility within this property. 4. The right-of-way dedicated by this plat will allow for the development of the surrounding transportation system. 5. All of the dedications benefit the development to at least the extent of the impact of such on the development. VIII. RECOMMENDATION: 1. The members of the City Council and The Planning & Zoning Commission consider the following motion: "Move that the City Council (Planning and Zoning Commission) approve the Statement of Findings and the Final Plat Application of Lot 1, Block 1, The Bluffs at Grapevine." JLH/srh APPLICATION FOR PLATTING CITY OF GRAPEVINE, TEXAS TYPE OF PLAT: Preliminary Final Replat Amendment PROPERTY DESCRIPTION: Name of Addition: The Bluffs at Grapevine Number of Lots: r1 Gross Acreage: 3.50' .V,Proposed Zoning: cc Location of Addition: 1701 State Highway 26 PROPERTY OWNER: Name' Cumberland Grapevine Partners, LP Contact' Randy Edwards Address: 8235 Douglas Ave., Suite 410 City: Dallas State: Texas Zip: 75225 Phone: ( 214) 360-0606 Fax: b14) 36o -o663 Si natur : APPLICANT: Name: Carter & Burgess, Inc. ,_Contact' Rick Horn Address: 7950 Elmbrook Dr., Suite 250 City: Dallas State: Texas Zip: 75247 Phone' ( 214! 638-0145 PFax: (2 1 4) 64R -n447 4 Signature: SURVEYOR: Name: Carter & Burgess, Inc. Contact' Gary Vedro Address: 7950 Elmbrook Dr., Suite 250 City: Dallas State' Texas Zip: 75247 Phone: ( 214) 638-0145 el Fax: (71 /.) 6 -AR -n447 ************ FOR OFFICE USE ONLY ************ Application Received: 3 / (o / 00 Fee Amount: $ Z 2S , By: C.�. c�—cid- 3 uric -mss Check Number: -701-50`t