Loading...
HomeMy WebLinkAboutItem 08 - Outdoor Control SystemMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: 9 ITEM 0 ,1� HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGERr), MAY 2, 2000 ENGINEERING SERVICES CONTRACT City Council to consider awarding a contract for engineering services to Montgomery Watson Inc., for design of an odor control system in an amount not to exceed $29,000, authorize the City Manager as signatory, and take any necessary action. FUNDING SOURCE: Funds are available in the following account: Odor Control for Hilton Lift Station Account 200-48940-534-1-000004SW. Design cost $23,000 30.7% Construction phase services 6,000 8.0% In-house construction cost (materials only) 36,000 48.0% Contingency (15%) 10,000 13.3% Total $75,000 100.0 BACKGROUND: The Fellowship Church is located in North East Grapevine adjacent to the Hilton sewage Lift Station. The lift station was constructed in the early 1980s when the DFW Hilton Hotel was constructed and serves as the main sewage conveyance mechanism for the entire area. It pumps sewage to the Grapevine Wastewater Treatment Plant. The Fellowship Church is in the process of expanding and has purchased land that completely encompasses the lift station. They have found the odors generated by the lift station to be of an offensive nature and have requested that the City reduce the nuisance. Staff contracted with Montgomery Watson Inc. to perform an odor control study for the lift station. Various odor control methods were investigated including chemical treatments, activated carbon filtration, package biofiltration and custom biofiltration. April 27, 2000 (11:16AM) The custom biofiltration process was recommended. Ease of operation, aesthetics, utilization of land space, life cycle cost and effectiveness were criteria utilized in the selection. The custom biofiltration system is a below ground structure that houses a biologically active bacteria which reduces the hydrogen sulfide gas to a non -detect odor state. The bacteria are harbored on a tree mulch media and a ventilation system draws the odors from the lift station and pumps them into the structure where reduction occurs. The project will be constructed by Public Works staff to assure a quality and timely product. Montgomery Watson Inc. has a vast amount of experience in designing and managing the construction activities of this type of project. The engineer will design and provide construction phase services for the project for a fee of $29,000. Staff recommends approval of the contract in the amount of $29,000. MS/dsm 0:\agenda\050200\odor. control. agm April 27, 2000 (11:16AM) MONTGOMERY WATSON April 13, 2000 Mr. Matt Singleton Assistant Director of Public Works City of Grapevine P.O. Box 95104 Grapevine, Texas 76099 RE: Hilton Lift Station Biofilter Design and Construction Services Proposal Dear Mr. Singleton: Enclosed is our proposed Scope of Services and Fee for the design and construction phase services of the biofilter for the Hilton Lift Station as recommended to in our Letter Report dated March 2000. Our Scope of Services is based on the discussion we had with you on April 10, 2000. It is our understanding that the design effort is limited to the effort required to prepare drawings and individual technical specifications to allow the City of Grapevine to construct the biofilter "in-house". It is not the intent of the City to prepare bid documents, advertise, and bid the project. Additionally, we will assist the City during the constriction of the biofilter by making site visits as required to oversee the work. We will also assist in the selection and review of equipment and materials required for the project. Based on this effort we were able to reduce or estimated design fee of S53,000 per the Letter Report to $23,000 (see attached spreadsheet). This equates to approximately 18 percent of the estimated d construction cost. Furthermore, is has allowed us to eliminate some of the detail that is required in a typical set of bid documents and therefore reduced the total number of drawings to 7. The estimated Fee for construction services is $6,000 as described in the attached scope of services and estimated manhour projections. The total proposed fee for design and construction services is $29,000. Haryt ne ., _ j s c )vironmental Needs MONTGOMERY WATSON We look forward to continuing working with you and City of Grapevine on both the design and construction of the biofilter. If you have any questions please feel free to call. Sincerely, James T. Georger, P.E. Project Manager JTG/maf Enclosures (2) cc: Andy Cronberg Wayne Hunter Hilton Lift Station Biofilter Design and Construction Services Scope Of Work Montgomery Watson agrees to prepare drawings and specifications to allow the City of Grapevine to construct their own biofilter. Additionally, Montgomery Watson will assist in the construction of the biofilter by providing the following services. The work will include the following: 1.1 Project Mana eg ment MW will manage the project using MW project management tools to assure the project stays on schedule and within budget. 1.2 Drawings MW will prepare drawings (24 x 36) that provide the City of Grapevine sufficient information and detail for them to construct the biofilter "in-house". The drawings will not be "Bid Ready". It is estimated a total of 7 drawings will be required. 1.3 Specifications MW will prepare technical specifications for all equipment and materials required for build the biofilter. The specifications will not be "Bid Ready". 1.4 Cost Estimate MW will prepare a final cost estimate. The estimate will include prices for all equipment and material required for the biofilter. 1.5 QA/QC All work prepared by MW will be reviewed by an inhouse expert in the field of biofilter design. 1.6 Construction Services MW will assist the City during the construction of the biofilter. This includes site visits, phone conversations, and review of equipment and materials to be purchased for the biofilter. It is estimated that a site visit will be required during the following construction activities: lining installation, piping layout, media placement, blower installation, start-up, smoke testing, and 3 miscellaneous visits. TIME FOR COMPLETION The Engineer agrees to start work immediately following written authorization by Director or his designee to proceed immediately following execution of this proposal. The Engineer will submit the 90% complete drawings and specifications to the City within 60 calendar days of receipt of a Notice to Proceed letter from the City. COMPENSATION The ENGINEERING SERVICES FEE shall provide compensation for all work included in this proposal. The basis for compensation shall be lump sum. The total maximum ENGINERING SERVICES FEE shall be Twenty Nine Thousand Dollars ($29,000.00). (see attached spreadsheet) 2 City of Grapevine Hilton Lift Station Biofilter Design and Construction Services MW Fee April 13, 2000 TASK LISTING Proj Mgr Asst Proj Mgr Proj Engr Elect Technician Enar Drafter Typing QAJQC Total Manhours 1.1 Project Management 4 10 4 $2,204 1.2 Drawings (7 sheets) 6 50 4 80 24 $14,112 1.3 Specifications 2 24 4 12 $3,427 1.4 Cost Estimate 2 $148 1.5 QA/QC 2 $282 1.6 Review Meetings 4 $296 1.6 Construction site visits 12 30 4 $4,260 equipment review 6 2 $699 communication 10 5739 TOTAL'NIANHOURS LABOR FEE SUBTOTAL 4 30 126 14, 80 24 16 2 296 $26,168 CADD $2.000 ODCs (xI0 'I'c) $1,000 TOTAL $29,168