Loading...
HomeMy WebLinkAboutItem 09 - Opryland Forcemain & Trunk Line Design ContractMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER MAY 2, 2000 OPRYLAND FORCEMAIN & TRUNK LINE DESIGN CONTRACT City Council consider approving a design contract with Carter Burgess, Inc in an amount not to exceed $ 64,200.00 for engineering design services on the Opryland Lift Station, Force Main and Trunk Line Project, authorize City Staff to execute said contract, and take any necessary action. FUNDING SOURCE: Funds for the design contract are available as follows: City of Grapevine $ 13,817 21.52% 1996 Utility Bond Interest Opryland 33,810 52.66% Opryland TIF Wildwood Creek Apts. 7,791 12.13% 178-21555 Marina's International 8,782 13.68% To be deposited TOTAL $ 64,200 BACKGROUND INFORMATION: The development of the Opryland Site includes the construction of a large Wastewater Lift Station and Force Main. As part of standard development requirements, Opryland is required to size their system to collect and transport flows from upstream properties, developed or undeveloped. This includes extending a trunk line south from the lift station to SH 26 to provide for existing and future flows from properties south of Trencor as well as Opryland's property on SH 26 east of Ruth Wall Street. With the construction of Wildwood Creek Apartments, Staff has determined that the Wildwood Lift Station is undersized for this added flow as well as future flows from the undeveloped properties in the watershed. In a Developer contract approved by City Council on January 4, 2000, Wildwood Creek Apartments contributed $ 90,000 as their share of the cost to design and construct a gravity line from the Wildwood Lift Station east to the new Opryland Lift Station, the added capacity necessary in the new station, and the added capacity necessary in the force main. In that same development contract approved on January 4, 2000, the City committed $ 43,533 for its share of the estimated cost of similar responsibilities. The City is participating in the cost of the Wildwood Gravity Line to the Opryland Lift Station because of existing flows to the existing Wildwood Lift Station from Cobblestone Village Apartments and from the residential cul-de-sac on the north side of Wildwood Drive. Marina's International is participating in the cost of the system because of their impending plans for development of their leased Corps land along Fairway Drive. Their property will be served by the SH 26 Trunk Line to be constructed by the Opryland Project and have contributed to the design and construction cost based upon the percentages reflected above. Staff recommends approval. JLH/jsl 0:\AGENDA\05-02-00\OPRY DESIGN MEM.doc