HomeMy WebLinkAboutItem 19 - Church Street Reconstruction ProjectMEMO TO FROM: MEETING DATE SUBJECT RECOMMENDATION: ITEM #_ l�I HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER, f(/ 6 FEBRUARY 15, 2000 CHURCH STREET RECONSTRUCTION PROJECT AWARD OF DESIGN CONTRACT City Council consider awarding a contract to HDR Consulting Engineers, Inc. in an amount not to exceed $ 167,574 for Engineering Design Services on the Church Street Reconstruction Project, authorize staff to execute said contract, and take any necessary action. FUNDING SOURCE: Funds are currently available from FY 99 GO Bonds as follows: Proiect Budaet Engineering ROW Construction Contingency Total BACKGROUND: $ 175,000 14.6% 86,000 7.2% 752,880 62.9% 183,255 15.3% $1,197,135 100.0% The Church Street project extends from Wall Street south to Hudgins Street. The project will include reconstruction of the roadway to provide an improved driving surface, and the construction of 100 -year flow underground drainage systems. Any necessary water and wastewater line adjustments and or replacements of old deteriorated lines are included in the project as well as the extension of the storm drain out -fall from Church Street west across the Housing Authority site to Morehead Branch. This extension will relieve the surface flooding problems in the Housing Authority parking February 9, 2000 (3:49PM) lot and will be of sufficient size to collect and convey run-off from the Main Street area once the Main Street crown has been addressed in a separate construction project. The Basic Services Fee of $84,980 is at the higher end of the Engineer Fee Curve for a project of this type. However, staff uses the fee curve only as a guide for fee development since the fee curves were issued in 1982. The proposal includes two additional elements above and beyond the normal Basic Services. The first element involves preparing alternatives for the roadway section, which includes a full curb and gutter roadway with a complete underground storm drain system and a rural roadway section with shoulders, roadside ditches and an underground storm system (to provide supplemental capacity for the ditches). The second element above and beyond normal Basic Services is the preparation of a construction traffic control plan for Church Street. This particularly applies between College Street and Wall Street where the roadway is now relatively narrow. The final pavement width will also be relatively narrow. There is a significant amount of traffic on the roadway including "through" movements from north to south and traffic generated from the Housing Authority complex, Senior Citizens Center and the Methodist Church complex. The Special Services element of the contract will be listed as a "not to exceed" figure proposed at $82,594. This is comprised of a number of elements including Public Meetings, the design of a waterline replacement if deemed necessary by staff, landscape and irrigation design for the corridor if deemed necessary by staff or by Council, drainage out -fall design from Church Street to Morehead Branch and field surveys. Preparation of right of way parcel exhibits, drawings, field notes, metes and bounds descriptions and geo-technical engineering investigations and pavement design are also included. Staff feels this is a reasonable proposal for the scope of work that HDR Engineers has been requested to consider for the project. Staff recommends approval. JSP/dsm 0:\AGENDA\021500\CHURCH WTRL AGM %' February 9, 2000 (3:49PM) GENERAL GOVERNMENT CAPITAL PROJECTS Church Street PROJECT DESCRIPTION Church Street is to be reconstructed as a 36 -foot back to back concrete section. This will allow parking on the east side of the roadway while providing two 12 foot lanes for traffic. This project also includes substantial drainage improvements from Main Street to Moorehead Branch. These improvements will provide more parking and improved access to the downtown historic area. PROJECT SCHEDULE Begin En Design Mar -00 Dec -00 ROW Acquisition Nov -00 Jan -01 Construction Mar -01 Oct -01 FISCAL IMPACT IMPACT ON OPERATING BUDGET Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement, and maintaining parkways on both sides of the roadway. Projected Annual Operating Impact FY -00 FY -01 FY -02 Budget Planned Planned FY -03 Planned FY -04 Planned Total Project LTD- Budget Planned Project Expenses 09/30/99 FY -00 ' FY -01 FY -02 BY -03 FY -04 Cost Design 927 150,000 25,000 3,795 Services 975 175,000 ROW 3,978 Capital Outlay 86,000 0 86,000 Construction $2,409 $3,462 752,880 752,880 Issuance Costs 4,965 4,965 Contingency 183,255 183,255 TOTAL: $0 $150,000 $1,052,100 $0 $0 $0 $1,202,100 Funding Source 150,000 617,100 767,100 99 GO Bonds Future Bonds 435,000 435,000 TOTAL: $0 $150,000 $1,052,100 $0 $0 $0 $1,202,100 IMPACT ON OPERATING BUDGET Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement, and maintaining parkways on both sides of the roadway. Projected Annual Operating Impact FY -00 FY -01 FY -02 Budget Planned Planned FY -03 Planned FY -04 Planned Total Personnel Expenses 0 Supplies 0 Maintenance 927 1,434 1,434 3,795 Services 975 975 2,028 3,978 Capital Outlay 0 Total : $0 $0 $1,902 $2,409 $3,462 $7,773 JAN -24-2000 10:47 HDR ENGINEERING INC. 9?2 960 44?1 P.04/31 January 20, 2000 THE STATE OF TEXAS CONTRACT THIS CONTRACT is made and entered into by and between the CITY OF GRAPEVINE, a Texas municipal corporation, hereinafter referred to as "City", and HDR Engineering, Inc., a Nebraska professional corporation, whose local address is 12700 Hillcrest, Suite 125, Dallas, Texas, 75230, hereinafter referred to as "Engineer", The terms of this Contract shall be administered on behalf of the City by its Director of Public Works or his designated representative, hereinafter referred to as "Director. The decision of the City Council in all disputes shall be final and binding. WITNESSETH: The City hereby contracts for the services of Engineer to prepare right-of-way maps and descriptions, construction plans, details, specifications and special provisions for Church Street Improvements (Hudgins Street to Wall Street) in the City of Grapevine, Tarrant County, Texas in accordance with the terms of this contract. I In accordance with guidelines established by the City of Grapevine Department of Public Works, Engineer agrees to perform, or have performed, the field work necessary to establish existing and proposed right-of-way, and horizontal and vertical control; locate existing features, utilities and topography; and gather geotechnical data, as required for design and as more particularly described below, including the preparation of survey documents required for right-of-way and easement acquisition. 1 JAN -24-2000 10:4? HDR ENGINEERING INC. 9?2 SGO 44?1 P.05/31 F1 I A. CONCEPTUAL PHASE .• I Immediately after receiving Notice to Proceed, the Engineer shall submit for approval by the City, a breakdown of the primary items of work with each item shown as a percentage of the total phase. A schedule will be prepared and updated monthly with a bar graph attached showing scheduled and actual progress. Engineer agrees to prepare alternative concept schematics and cross-sections for Church Street improvements (Hudgins Street to Wall Street) for review by City staff, City Council and other affected parties, prior to commencement of Preliminary Design, as more particularly described below: BASIC SERVICES: 2.1 Proiect Standards and Criteria: Engineer shall develop and confirm appropriate project design and drafting standards and criteria between those promulgated by the City, the TOOT, DFW Airport and other entities having jurisdiction. Engineer shall develop a Project Guide containing ail relevant design, correspondence and contact information and distribute to the necessary entities (including the City). 2.2 Proiect Inventory and Utility Coordination: With the assistance of the City, the Engineer shall compile existing data of record concerning all physical elements that will affect the design process. Engineer shall coordinate with all local utility companies to locate existing facilities in the vicinity of the project and plan for inclusion of any future improvements into the plans, if necessary. 2.3 Site Conditions -Analysis: Engineer shall review previous studies of the project location and the existing 2 JAN -24-2000 10:48 HDR ENGINEERING INC. 972 5SU 4471 H-Ubl-Sl conditions to formulate a "laundry listu of problems and their potential solutions to be addressed in the design process. 2.4 Alternative Concept Plan Preparation and Selection: Prepare up to 2 alternative concept schematics (1"=40'H, I"=4'V) and cross sections for the roadway. These schematics will address and illustrate horizontal and vertical geometry concerns, right-of-way needs/impacts, basic aesthetic (landscape) concepts, traffic control and construction phasing, construction cost, schedule, and other pertinent issues. 2.5 Meetings Engineer shall attend a minimum of three (3) meetings during the concept phase — one for project kickoff and coordination purposes, and two for presenting and discussing concept plans and issues related to the selection of a preferred alternative. The first meeting shall be held at the beginning of the project to coordinate with the City, exchange information, and discuss possible alternatives. The second meeting shall be held prior to the first public meeting, when the alternatives are developed enough to illustrate the issues and concerns that will influence the selection of the preferred alternative. The third meeting shall be held after the public meeting when comments have been incorporated into one or both of the alternatives and the Engineer is prepared to recommend a preferred alternative to the City, Should additional meetings become necessary to allow an alignment and typical section(s) to be selected before proceeding to preliminary design (for reasons not related to Engineer's performance), the Engineer shall attend them with the understanding that the extra costs will be negotiated as "Additional Services". 2.5 Deliverables: Engineer shall submit the following to the City as part of the conceptual phase of the project: • Letter summarizing key issues that will/could affect the project, including those 3 .. ... . . . A JAN -24-2000 10:4e HDR ENGINEERING INC. 972 9G0 4471 P.07/31 related to survey, traffic counts, utility coordination, design, right-of-way acquisitions, construction phasing, and construction cost. • 1 set of full size black and white plots of each alternative for discussion purposes at the 2 design review meetings. 0 1 set of half size color plots of the preferred alternative for discussion purposes at the second design review meeting. SPECIAL SERVICES: 2.1 Right-of-way and Ownership Research: Engineer shall obtain and review existing right-of-way and ownership information, including deed records, plats, and any other available information, and incorporate the information into the contract drawings. 2.2 Field Survey: Engineer shall perform full topographic survey for the project vicinity, including the following: locate city and project control; establish GPS surface control to site, run traverse and tie monuments; establish vertical control; run cross sections at 50 foot intervals, 150 feet wide; tie all physical features on site, including visible utilities, driveways, sidewalks, culverts, trees 4" diameter or larger and any other items within 75 feet either side of the centerline; 8 intersection surveys, with sections 200 feet I in each direction at 50 foot intervals, 150 feet wide. 2.3 Base Map Preparation: Import survey information into CADD format and create 3D base file containing points, break lines and contours for use in preparing contract drawings. 2.4 Traffic Counts: Engineer shall have traffic counts performed along the project roadway. Counts shall be obtained for a one week period, Sunday to Sunday (8 days), and shall focus on the areas in front and around the church, housing authority, and the senior 2 M JAN -24-2000 10:4e HDR ENGINEERING INC. 5Y2 �bU 44Y1 r. udz IJ i citizens center. Pedestrian traffic patterns shall also be noted. Results to be included in the aforementioned letter outlining potential design issues for the project. 2.5 Geotechnical Investigation: Engineer shall perform geotechnical services, including boring logs, laboratory testing, water level observations, and boring plans. Report shall include test results, groundwater impacts, recommendations for areas requiring dewatering, and pavement design recommendations. 2.6 Public Meetin s : _qU Engineer shall attend a maximum of two (2) public meetings for presenting concept alternatives to the public for information and comment purposes. All labor and materials relating to the preparation, attendance and follow-up for these public meetings shall be invoiced as special services. Should additional public meetings be needed for the purpose of presenting concepts and arriving at a preferred alternative, Engineer agrees to attend the meetings and prepare all necessary information with the understanding that associated costs will be negotiated as "Additional Services". Engineer agrees to develop a Preliminary Design based on the chosen alternative Concept for review by City staff, City Council and other affected parties, prior to commencement of Final Design, as more particularly described below. "Basic Services" shall include the roadway and on-site storm sewer design. Design of the water line improvements, landscape and irrigation, and the drainage outfall to Morehead Branch shall be negotiated as "Special Services" to allow the City to exclude any or all of them should it choose to. 5 JAN -24-2000 10:49 HDR ENGINEERING INC- 972 960 4471 P.09/31 BASIC SERVICES: 2.1 Preliminary Roadway Design: Engineer shall prepare preliminary engineering plans, specifications and estimate for the improvements to Church Street, from Hudgins Street to Wall Street. Engineer shall attempt to maintain the "historic" feel of the roadway by implementing a 24 -foot wide asphalt section, approximately 2000 feet in length, with bar ditches on both sides and curb and gutter only in the areas where it currently exists. Sheets produced shall include typical sections, horizontal control, paving plan/profile, 8 intersection layouts, and standard details, 2.2 Drainage qgLigri: Engineer shall incorporate the existing bar ditch concept into the new drainage design for the project. Underground storm sewer will be utilized where necessary to contain the design flows. Engineer shall produce a drainage area map, hydraulic computations, drainage plan/profile sheets and culvert layouts, where necessary. 2.3 Preliminary Traffic Control and Construction "In Engineer shall prepare a preiliminarY concept for traffic control and construction phasing for the project. Concept will be presented at the public meeting following the preliminary design stage to allow for the public to comment. 2.4 Meetings: Engineer shall attend a minimum of three (3) meetings during the preliminary engineering phase for the purpose of discussing design -related issues and preparing for the final public meeting. Should additional meetings become necessary to develop an acceptable preliminary (650%) design prior to proceeding to final design (for reasons not related to Engineer's performance), the Engineer shall attend them with the understanding that the extra costs will be negotiated as "Additional Services". R JAN -24-2000 10:49 HDR ENGINEERING INC. 'J (2 'vbU 44 (1 t-1. IU/.)i 2,5 Deliverables: Engineer shall submit the following to the City as part of the preliminary design (65%) phase of the project: • I set of half size 65% drawings for review by the City • Maximum of 15 sets of full size 65% drawings (bluelines) for review by the City and utility companies • I set of half size color plots of the approved preliminary design for discussion purposes leading up to the final public meeting. • Preliminary Cost Estimate 2.6 Quality Control/Assurance: Engineer shall incorporate its standard QA/QG procedures to ensure the design documents are checked and satisfy the standards desired by the City. A copy of the Engineer's QA/QC procedure is available upon request. 2.7 Plan Coordination and Review: The preliminary plans will be reviewed by the City staff, the franchised utilities, and, to the extent appropriate, the affected property owners along the roadway so that final design can begin with maximum concurrence and all necessary input. SPECIAL SERVICES: 2.1 Field Survey: Completion of any additional survey/topo, including additional on -the -ground data needed for final design such as cross-sections and drainage design. 2.2 Right-of-Wgy and Easement Document Preparation: Conduct any remaining right-of-way research and data gathering based on the selected alignment. Begin preparation of right-of-way and easement acquisition documents (metes and bounds descriptions) for the City to use in preparation of dedication documents. Charges to be billed per parcel, for a maximum of 10 done with the parcels. Should additional parcels be needed, they will be JAN -24-2200 10*49 HDR ENGINEERING INC. 972 960 4471 P.11/31 understanding that the extra costs will be negotiated as "Additional Services". 2.3 Church Street Drainage Outfall System Design: Engineer agrees to prepare preliminary (65%) plans, specifications, and estimates for the design of the Church Street drainage outfall to Morehead Branch, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services" design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 2.4 Water Line Design; Engineer agrees to prepare preliminary (65%) plans, specifications, and estimates for design of a replacement for the existing water line in Church Street, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services!' design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 2.5 Landscapinq and Irrigation Design: Engineer agrees to prepare preliminary (65%) plans, specifications, and estimates for landscape and irrigation design associated with the aforementioned improvements to Church Street, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services" design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 2.6 Public Meeting(s)' Engineer shall attend one (1) public meeting for presenting the preliminary design M JAN -24-2000 10:50 HDR ENGINEERING INC. y3 (2 'vbU 44 (1 t-1. ld/Jl to the public for information and comment purposes. This meeting may be held near the conclusion of the final design phase instead of the preliminary design phase should the City choose. All labor and materials relating to the preparation, attendance and follow-up for the public meeting shall be invoiced as special services. Should additional public meetings be needed for the purpose of presenting the preliminary/final design, Engineer agrees to attend the meetings and prepare all necessary information with the understanding that associated costs will be negotiated as "Additional Services". ' 9 SAN -24-2000 13:50 HDR ENGINEERING INC. 972 960 4471 P.13/31 M] Engineer agrees to prepare final construction plans, details, specifications, bidding documents and special provisions as required for the Church Street Improvements (Hudgins Street to Wall Street), to include design of paving, drainage and utility improvements for the full extent of the project including those areas outside the public right-of-way which may be directly affected by the proposed improvements and to coordinate with applicable public agencies for necessary approvals and with franchised utilities for necessary relocation of their facilities and to perform Basic Construction Phase Services as more particularly described below. BASIC SERVICES: 3.1 Construction Plans: Construction Plans shall consist of the plan sheets and details for paving, drainage, signing and striping, traffic control, and modifications to private property adjacent to the roadway and ail appurtenances thereto. All improvements shall meet or exceed current City of Grapevine design criteria. Cross-sections shall be run at a maximum of 50 -foot intervals, and drawn to show all excavation or fill needed for construction of the project. Calculations for end areas and volumes of excavation and embankments (including shrinkage factors used) shall be shown an the cross section sheets. Profiles and cross sections shall be designed for all intersecting streets, alleys, and driveways and cross sections at other critical or intermediate points such as culverts, bridge abutments, etc. Drainage at all intersections shall be clearly indicated and verified by field survey. Either contours or spot elevations shall be shown on intersection layouts with cross slope to fit intersecting grade lines. Cross sections shall be extended beyond the proposed right-of-way a sufficient distance (minimum of 50 feet) to determine directions of rainfall runoff and to a point that will achieve an adequate approach IN JAN -24-2000 10:50 HDR ENGINEERING INC. 'JbU 44 (1 i1. 14/.)1 slope, All drainage ditches shall be profiled beyond the right-of-way or easement limits to the extent necessary to determine grading and drainage requirements and cross sections. 3.2 Final Utility Coordination: Engineer shall coordinate with the utilities and agencies in the project vicinity to ensure that all existing utilities are shown and any future improvements are incorporated into the final plans. 3.3 Mggli0g! Engineer shall attend a minimum of three (3) meetings during the final engineering phase for the purpose of discussing design -related issues and preparing the project for bid. Should additional meetings become necessary to develop an acceptable final design (for reasons not related to Engineers performance), the Engineer shall attend them with the understanding that the extra costs will be negotiated as "Additional Services". 3.4 Quality Assurance/Quality Control, Engineer shall incorporate its standard QA/QG procedures to ensure the design documents are checked and satisfy the standards desired by the City. A copy of the Engineer's internal QA/QC procedure is available upon request. 3.5 Bidding Documents, Specifications Engineer shall prepare Bidding Documents, Specifications and Special Provisions of Contract including Engineer's Final estimate, Quantity Takeoffs and Construction Schedule, as follows: 4 Sets of Bluelines (22" x 34") of complete construction plans 7 Sets of Specification and Proposal Book 4 Sets of Half Scale complete construction plans JAN -24-2000 10:51 HDR ENGINEERING INC. 972 SGO 44?1 P.15/31 Set of Final Cross-sections (22" x. 34", mylar) Set of the entire construction plans on standard CD, preferably, or 31h" (1,44 mb) Floppy Disks utilizing the *,DWG format for use with AutoCAD Release 14. 3.6 Plan Coordination and Review: The final plans Wit be reviewed by the City staff, the franchised utilities, and, to the extent appropriate, the affected property owners along the roadway so that the final contract documents represent a design deemed satisfactory to all parties involved and/or affected by the proposed improvements. SPECIAL SERVICES: 3.1 Rigrht of Way and Easement Document Preparation: Conduct any remaining right-of-way research and data gathering based on the selected alignment. Finish preparing right-of-way and easement acquisition documents (metes and bounds descriptions) for the City to use in preparation of dedication documents. Charges to be billed per parcel, for a maximum of 10 parcels. Should additional parcels be needed, they will be done with the understanding that the extra costs will be negotiated as 'Additional Services". All right-of-way and easements to be acquired shall be clearly dimensioned with the area to be acquired and that area remaining, indicated in square feet and acres_ Propertylines shall be referenced to the project centerline. Dimensions from proposed right-of-way lines to all improvements, existing structures or houses shall be indicated on the documents. Preparation of field notes shall be by a Registered Public Surveyor suitable for inclusion in right-of-way deeds, which will be prepared by the City's legal counsel. Preparation of right-of-way exhibits for the purposes of public presentations and 22 JAN -24-2000 10:51 HDR ENGINEERING INC. J'(2 1bu 44(1 r.1n/1)1 meetings with individual landowners. 3.2 Church Street Drainage Outfall System Design: Engineer agrees to prepare final plans, specifications, and estimates for the design of the Church Street drainage outfall to Morehead Branch, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services" design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 3.3 Water Line Design: Engineer agrees to prepare final plans, specifications, and estimates for design of a replacement for the existing water line in Church Street, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services" design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 3.4 Landscaping and Irrigation Design: Engineer agrees to prepare final plans, specifications, and estimates for landscape and irrigation design associated with the aforementioned improvements to Church Street, should the City request it, with the understanding that any associated costs will be billed as "Special Services". Plans, specs and estimates related to this design would be designed according to the same procedures as described for the "Basic Services" design tasks and included in the overall design package, unless Engineer is directed to do otherwise. 13 JAN -24-2000 10:52 HDR ENGINEERING INC. 972 960 4471 P.17/31 F0 CONSTRUCTION � A. ADVERTISE, BID AND AWARD (Construction Phase Servicee%.,-,, BASK SERVICES: 4.1 Advertise andCoordinateBid Process Engineer shall prepare materials for advertisement of the project for bidding, organize and execute a pre-bid conference, distribute addenda and respond to bidders' inquiries. 4.2 Receive, Tabulate and Evaluate Bids Engineer shall collect, tabulate and evaluate all bids and make a recommendation to the City for award of a construction contract. 4,3 Construction Plans Engineer shall provide the City with one reproducible copy of the construction plans for the City's use during the construction phase. B. CONSTRUCTION (Construction Phase Services) BASIC SERVICES: 4.1 Construction Administration Engineer shall provide general administration services during construction which will include the following: Make periodic visits to the site (as distinguished from the continuous services of a resident Project Representative) to observe the progress and quality of the executed work to determine, in general, if the work is proceeding in accordance with 14 JAN -24-2000 10:52 HDR ENGINEERING INC. 972 960 4471 P.1e/31 the Contract Documents. Prepare a report for each site visit to note progress and conditions observed. Attend monthly or periodic progress meetings as requested by the City to provide technical consultation and responses to requests for information by the contractor. Prepare report for each progress meeting. Consult and advise with the City, issue instructions to the contractor requested by the City, and prepare and issue routine change orders with City's approval. Review samples, catalog data, schedules, shop drawings, laboratory, shop and mill test of material, equipment and other data which the contractor submits only as required by construction contact documents. Obtain and review monthly and final estimates for payments to contractors and furnish to the City any recommended payments to contractors. Assemble written guarantees which are required by the Contract Documents. 4.2 ConstructionStaking See Special Services 4.3 Final inspection Engineer shall conduct, in company with the City, a final inspection of the Project for compliance with the Contract Documents, and submit recommendations concerning the City's acceptance of the Project and final payment to the Contractors. 4.4 Record Drawings Engineer shall prepare Record Drawings reflecting the final field conditions and any changes to the construction plans required during the construction of the project. Engineer shall use information from the contractor, the City Inspector, and the Engineer's staff to develop these Record Drawings. The Record Drawings shall be submitted to the City Staff as follows: 15 JAN -24-2000 10:53 HDR ENGINEERING INC. 972 9G0 4471 P.19/31 Set of Reproducible Mylars (22" x 34') identified as Record Drawings with an effective date. Set of the entire construction plans on standard CD, preferably, or 31/2" (1.44 mb) Floppy Disks utilizing the *.DWG format for use with AutoCAD Release 14. Record Drawings shall be delivered to the City within 60 calendar days of the Final Acceptance of the project. SPECIAL SERVICES: 4.1 Construction StakLnA (a) Basic Control Engineer shall provide vertical and horizontal construction control staking by establishing a minimum of 2 benchmarks for the project and setting all points of geometric change on the proposed right-of-way for use by the construction contractor. This will also include right-of-way and back of curb stakes at 100 -foot intervals and back comers of all storm sewer inlets. (b) Construction Staking It is our understanding that actual construction staking will be performed by the contractor based on the construction plans and control 4.1(a) set by the Engineer. However, should more detailed staking be required by the engineer such as that for grading, paving, storm sewer or utilities, such staking may be performed under separate agreement. (c) -Monumentafon Upon completion of all construction, Engineer shall set iron rods at all P,C,s, P.T.s, etc. on the new right-of-way and set all new front property corners on tracts from which right-of-way was acquired. in JAN -24-2000 10:53 HDR ENGINEERING INC. 972 560 4471 V TIME FOR COMPLETION Engineer agrees to complete and submit all work required by City under FIELD SURVEY WORK and CONCEPTUAL/PRELIMINARY DESIGN within 150 calendar days from the date of the written authorization by director or his designee to proceed immediately following execution of the contract. FINAL DESIGN/PLAN PREPARATION and all other work required under the contract documents will be completed within 30 calendar days from the date of written authorization to commence said work by the Director or his designee after review and return of the preliminary plans, provided however that either time -frame may be extended or suspended due to delays in the right-of-way acquisition, reviews by agencies or franchised utilities or other such matters beyond the control of City or Engineer, with the mutual written consent of both parties. VI COMPENSATION: SPECIAL SERVICES, BASIC, AND TOTAL ENGINEERING FEE A. BASIC ENGINEERING SERVICES FEE 6.1 The BASIC ENGINEERING SERVICES FEE shall provide compensation for all design work, drafting work, computations, and all other work required for the design of this project, including Concept and Preliminary Phases and Basic Construction Phases Services, except that work described under Section VI.B.6.1. below. 6.2 The basis for compensation shall be Lump Sum. The total maximum BASIC ENGINEERING SERVICES FEE shall be Eighty-four thousand) nine hundred and eighty dollars ($ 84,980). Labor hours and rates used for Basic Services are shown in Exhibit "A". 6.3 BASIC ENGINEERING SERVICES FEE shall be paid as follows: Upon furnishing satisfactory evidence of progress to City, Engineer shall receive up to twenty (20) percent of the maximumBASIC ENGINEERING SERVICES FEE, as 17 JAN -24-2000 10:53 HDR ENGINEERING INC. 972 960 4471 P.21/31 shown in Section V.A.6.2 above, per month. The first monthly partial payment may be requested by Engineer thirty (30) calendar days after the date of execution of the Contract, and then monthly thereafter. Should the Engineer furnish satisfactory evidence to the Director of Public Works that his progress exceeds twenty percent (20%) of the total Engineering effort, as defined by this Contract, the partial payment may be increased to a higher percentage at the discretion of the Director of Public Works. In no case shall the sum of the partial payments exceed Eighty-five percent (85%) of the maximum BASIC ENGINEERING SERVICES FEE. The remaining fifteen percent (15%) of BASIC ENGINEERING SERVICES FEE shall be paid as part of Basic Construction Phase services incrementally as work progresses. (b) City reserves the right to delay, without penalty, any partial payment, when in the opinion of the Director, Engineer has not made satisfactory progress on this design of.this project. 6.3 No items of work shall be included in the Basic Engineering Services Fee for compensation except those items described in Section it., CONCEPTUAL/PRELIMINARY DESIGN, Section Ill., FINAL DESIGN/PLAN PREPARATION, and Section VI.A. BASIC ENGINEERING SERVICES FEE of this Contract. B. SPECIAL SERVICES FEE 6.1 The SPECIAL SERVICES FEE shall provide compensation to engineer for FIELD SURVEY WORK AND PREPARATION OF ROW EXHIBITS as needed for initial establishment of control lines, centerlines, elevations, location of underground utilities, topographical features, and other field surveys necessary for the design of this project including establishment of existing right-of-way and easements and preparation of documents for proposed right-of-way and easement acquisition and JAN -24-2000 10:54 HDR ENGINEERING INC. 972.960 4471 P.22/31 for GEOTECHNICAL INVESTIGATIONS (if soil investigations are required under Section 1.). Fees and associated expenses for the design of the WATER LINE, LANDSCAPING/IRRIGATION, AND DRAINAGE OUTFALL TO MOREHEAD BRANCH are also included as "Special Services" to allow the City to exclude them from this Contract should it choose to do so, Also, NON -SALARY EXPENSES shall be paid under said SPECIAL SERVICES FEE for reproduction costs, computer services, communication charges and pre -authorized delivery charges as required for proper execution of the design of all Phases of this project. 6.2 The basis for compensation for the above shall be a NOT -TO -EXCEED LUMP SUM. Preparation of right-of-way exhibits shall be billed on a PER PARCEL basis at $1300 per parcel, for a maximum often (10) parcels ($13,000 max). Innoevent shall the maximum SPECIAL SERVICES FEE exceed Eighty-two thousand, five hundred and ninety-four dollars ($ 82,594), regardless of the work required. 6.3 Payment for Special Services shall be on the basis of actual progress, invoiced monthly to the City. 6.4 For the purpose of budgeting, the separate major elements of Special Services are shown in the Special Services portion of Exhibit "A". 6,5 No items of work will be included in the SPECIAL SERVICES FEE for compensation except those items described in Section 1, FIELD SURVEY WORK; Section 11, CONCEPTUAL/PRELIMINARY DESIGN; Section III, FINAL DESIGNIPLAN PREPARATION; Section IV, CONSTRUCTION; and Section VI, SPECIAL SERVICES FEES of this contract. C. ITEMS NOT INCLUDED IN THIS CONTRACT Scope items not included in this contract are as follows. Engineer will perform any or all of these services, should the City decide to do so, with the understanding that all related costs will be negotiated as "Additional Services". 19 JAN -24-2000 10:54 HDR ENGINEERING INC. 972 960 4471 P.23/31 6.1 No general specifications shall be required. Only special provisions for those items not covered in NCTCOG specifications and the City of Grapevine standard specifications for paving and storm drainage design will be produced. 6.2 Street lighting and traffic signal design is not included in this contract. The TOTAL ENGINEERING FEE shall be the sum of the SPECIAL SERVICES FEE and the BASIC ENGINEERING SERVICES FEE. The TOTAL ENGINEERING FEE for this Contract shall not exceed One hundred sixty-seven thousand, five hundred and seventy-four dollars ($ 167,574) Upon acceptance and approval by City of Section III: FINAL DESIGN/PLAN PREPARATION, mylar record copies of original tracings, cross sections, preliminary plans, special provisions, field notes, and any other related documents or items shall become the sole property of the City of Grapevine and shall be delivered to City, without restriction on future use. Engineer may make copies of any and all plans, cross sections, field notes, and related documents for his files. ffm 8.1 After acceptance of the final plans and special provisions by City, Engineer agrees, prior to and during the construction of this project, to perform such engineering services as may be required by City to correct errors or omissions ' on the original plans prepared by Engineer and to change the original design as required by such WX JAN -24-2000 10:54 HDR ENGINEERING INC. errors or omissions at no additional compensation. 'J'(,) yblJ 44 (1 i'. 114/1.)1 8.2 Redesign occasioned for the convenience of the City shall be at additional compensation for Engineer. Any additional compensation shall be as negotiated between Engineer and City and agreed upon in a separate or supplemental contract after authorization by of the City Council. 8.3 Acceptance and approval of the final plans by the City shall not constitute nor be deemed a release of this responsibility and liability of Engineer, its employees, associates, agents, subcontractors and consultants for the accuracy and competency of their Designs, Working Drawings and Specifications, or other Documents and work; nor shall such approval be deemed to be an assumption of such responsibility by the City for any defect in the Designs, Working Drawings and Specifications or other Documents prepared by engineer, its employees, associates, subcontractors, agents and consultants. 8.4 Engineer agrees to defend, indemnify and hold City, its officers, agents and employees, harmless against any and all claims, lawsuits, judgments, costs and expenses including attorney's fees and collection costs for personal injury (including death, property damage or other harm for which recovery of damages is sought that may arise out of or be occasioned by the intentional or negligent breach of any of the terms or provisions of this Contract by Engineer, its officers, agents, associates, employees or subconsultants, or by any other negligent act or omission of Engineer, its officers, agents, associates, employees or subconsultants, in the performance of this Contract; except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence of City, its officers, agents, employees or separate contractors, and in the event of joint and concurrent negligence of both the Engineer and City, responsibility, if any, shall be apportioned comparatively in accordance with the laws of the State of Texas, without, however, waiving any governmental immunity available to the City under Texas law and without waiving any defenses of the parties under Texas law. The provisions of this 21 JRN-24-2000 10:55 HDR ENGINEERING INC. 572 9160 44?1 P.25/31 paragraph are solely for the benefit of the parties hereto and not intended to create or grant any rights, contractual or otherwise, to any other person or entity. M_ Engineer, at Engineer's sole cost, shall purchase and maintain the following minimum insurance during the term of this Contract: 9.1 Worker's Compensation and Employers' Liability. This insurance shall protect the Engineer and his subcontractors against all claims under applicable state workers' compensation laws. The insured shall also be protected against claims for injury, disease, or death of employees which, for any reason, may not fall within the provision of a workers' compensation law. This policy shall include an all -states endorsement. The liability limits shall not be less than: Workers' Compensation Statutory Employers' Liability $500,000 9.2 Comprehensive General Liability This insurance shall be an occurrence type policy written in comprehensive form and shall protect the engineer and his subcontractors and the additional insureds against all claims arising from bodily injury sickness, disease or death of any person other than the Engineer's employees or damage to property of the City of Grapevine or others arising out of the act or omission of the engineer or his subcontractor or their agents, employees, or subcontractors. This policy shall also include protection against claims insured by usual personal injury liability coverage, a (protective liability) endorsement to insure the contractual liability, broad form property coverage, xcu, premises/operations, and independent contractors. Bodily Injury $1,000,000 per occurrence Property Damage $2,000,000 aggregate 22 JAN -24-2000 10:55 HDR ENGINEERING INC. 972 960 4471 P.26/31 93 This insurance shall be written in the comprehensive form and shall protect the provider, the Engineer and his subcontractors and the additional insured against all claims for injuries to members of the public and damage to property of others arising from the use of motor vehicles, and shall cover operation on and off the site of all motor vehicles licensed for highway use, whether they are owned, non -owned, or hired. The liability shall not be less than: Bodily Injury Property Damage $1,000,000 Combined Single Limit 9.4 Professional Liability coverage of not less than $1,000,000.00 single limit. The Engineer shall maintain coverage for at period of no less than two (2) years from the date of project completion. 9.5 The cost of all insurance required herein to be secured and maintained by Engineer shall be bome solely by Engineer, with certificates evidencing such minimum coverage in force to be filed with the City. Such certificates shall provide that City shall receive 30 days prior written notice of any cancellation, change or reduction in coverage. 91 • In connection with the work outlined in this Contract, it is agreed that the Director may cancel or indefinitely suspend further work by written notice to Engineer with the understanding that immediately upon receipt of said notice all work and labor being performed under this contract shall cease immediately. Before the end of a thirty (30) day period following such notice, Engineer shall invoice the City for all work completed and shall be compensated in accordance with the terms of this Contract for all work accomplished by Engineer prior to the receipt of said notice, and approved by Director. No 23 JAN -24-2000 10:55 HDR ENGINEERING INC. 972 960 4471 P.27/31 payment shall be made by City to Engineer for lost or anticipated profits, All plans, field surveys, maps, cross sections and other data related to the project shall become the property of City upon termination of this Contract. Nothing herein shall deprive City of its right to terminate this Contract for breach of same by Engineer and City retains its right to any and all remedies it may have, at law or at equity, to strictly enforce the terms of this Contract, included, but not limited to, its right to seek specific performance of the terms hereof, In case of any default by Engineer, City shall notify Engineer in writing of same. If Engineer does not remedy the default within ten (1 g) days of said notice, City may terminate this Contract for cause and/or pursue any legal remedy it may have against Engineer. F.4-1 This Contract is entered into subject to the Charter and Ordinances of the City of Grapevine, as amended and applicable Federal and Texas State laws. The provisions of this Contract shall be construed in accordance with the laws and court decisions of Tarrant County and the State of Texas; and exclusive venue for any litigation which may be filed by either party hereto in connection with this Contract shall be in Tarrant County, Texas. Wo ASSIGNMENT This Contract shall be deemed personal to Engineer and in no event shall be sublet or assigned without written approval of City. an Engineer agrees that City may review any and all work performed by Engineer on this project. The relationship of Engineer to City is that of Independent Contractor. 24 JAN -24-2000 10:56 HDR ENGINEERING INC. 972 960 4471 P.28/31 NIV NONDISCRIMINATION As a condition of this Contract, Engineer covenants that he will take all necessary actions to insure that, in connection with any work under this Contract, Engineer, his associates and subcontractors, will not discriminate in the treatment or employment of any individual or groups on the grounds of race, color, religion, national origin, age, sex, or handicap unrelated to job performance, either directly, indirectly, or through contractual or other arrangements. In this regard, Engineer shall keep, retain and safeguard all records relating to this Contract or work performed hereunder for a minimum period of three (3) years from final Contract completion, with full access allowed to authorized representatives of the City, upon request, for purposes of evaluating compliance with this and other provisions of the Contract. M FINANCIAL INTEREST PROHIBITED Engineer covenants and represents that Engineer, its officers, employees, agents, consultants and subcontractors will have no financial interest, direct or indirect, in the purchase or sale of any product, materials or equipment that will be recommended or required for the construction of the project. XVI The Engineer shall maintain, and the 04 shall have the right to examine books, records, documents, and other evidence and accounting procedures and practices, sufficient to reflect properly all direct and indirect costs of whatever nature claimed to have been incurred and anticipated to be incurred in the performance of this Contract. Such right of examination shall include inspection at all reasonable times of the Engineer's offices or facilities, or such parts thereof, as may be engaged in the performance of this Contract. 25 JAN -24-2000 10:5G HDR ENGINEERING INC. 972 SGO 44?1 P.29/31 All written notices and correspondence given to City by Engineer shall be mailed or delivered to the City of Grapevine, Director of Public Works, 200 South Main Street, P.O. Box 95104, Grapevine, Texas 76099, All written notices and correspondence from City to Engineer shall be mailed or delivered to the Engineer as follows: Jon Clements, P.E. HDR Engineering, Inc. 12700 Hillcrest Road, Suite 125 Dallas, TX 75230-2096 EXECUTED this the _ day of 20_, the CITY OF GRAPEVINE signing by and through the City Manager, adopted by City Council on and signing by and through its has caused this instrument to be executed by its duly authorized officials. -0 CITY OF GRAPEVINE HDR ENGINEERING, INC. City Manager Roger Nelson W M Senior Vice -President William R. Hindman, P.E. J HN-24--"tUU 116; Ub MJtK tNU I Nttt-, i NU i Nt-. 'J (,-' 'jbU 44Y! H. Jo/31 qct C7 0 OOgO 04 et Ul) co U) Lf) CD LO cr) No 0 CO(o cn co co 00 Cn LD C) 2 0 r-- 0 C) co Lo Id, t to I 1. 1 r- N V I N C4 c tJf SH !R 4R If 41� 44� follp 1 64 Ito 61. 44 co M C 0 a Mn rD to 0 r = LD C4 rcu I � tog. (D to (D 7D Ci et C7 LO st COT N N m m 1! co Li cc Ce) N -,t CY) C14 i cj r 0 W 44 40, Fn O Q CO E > cc CO'.rt C7 Ni co (qct o cj CV co 0 LU cn LL LR uj j $40 CL w — CL cc 0 1;0 W > ouj UJ 'V 04 C C Niv 0 N 0 Cl) M 0 cli X > :) U) 6 cr, 0 0 C7, LL. 0) LO m C:, (a CTQ co Nr To N CO "r C\l CO co C\j Cj CD — S C L a) 81 E UJ W LU 69. ful� E 0 oLLI :3 co cm m Co 0 C\j co TN NN C\.. 00 ci z (D 1 r LJ co LU _0 7@ Z v; V) C H . Cn tt) m V(:) � rT 0 W En 4) cm co r- CL ;� I p = 2 (n Cl) m u) — 0 I'm m 8 > co CL rc z it LOU) 0 X'O co w ca. E L� C: C% C2 '2 CL B +'2 y 0 Q 0 0 I= CO CT (D d 0 0 m (D L) FL -r- 0 0 2.3 w CL LU CL (D Cl D CD U) (n -- < 0 40 cn r- (D 0 :3 .0 (1) 0: CD cc cc W '0 > R. o '0 ia 5 'a !F 0 to (D 0 0 CD - (a F) z 0 g 4) CD >1 ca cc 0 cr- o a Cl) M c w EEO CT r_ IC67 CL -j MIS 0 E !-f 'm as (D M cl asp I- ca 0 o 0 0 w T 0 LL (L Ol (1) a Luu 1 0-0- cmn 0, C, Cr_ 0 �–,U)l (L 0 I cn Loll to co 0) cli cr) L= 1-1 t 5 E3