HomeMy WebLinkAboutItem 09 - Trunked Radio ConsortiumMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER #41" JANUARY 9, 2001 AMENDMENT TO RCC CONSULTING CONTRACT City Council to consider approval of an extension to the Consulting Services Contract between the City and RCC Consultants, Inc. in the amount of $30,596. FUNDING SOURCE: Funds are available in account 325-48860-000-0-0003 Lease Fund/Machinery & Equip Eq. Note '00. Further, all five members of the Northeast Tarrant County Trunked Radio Consortium share the costs equally. Therefore, each of the four other consortium member cities will reimburse the City of Grapevine for their share of the $30,596. BACKGROUND: The City of Grapevine (City) and RCC Consultants, Inc. (RCC) entered into a contract for telecommunication consulting services on October 13, 1998. RCC assisted the City and the Trunked Radio Consortium with the development of the technical specifications for the new trunked radio system and the negotiation of a successful contract with Motorola. This amendment is to retain RCC's services during the implementation and acceptance testing of the new trunked radio system. RCC's technical expertise is required to successfully complete this portion of the project. Staff recommends approving the amendment in the amount of $30,596. NE Tarrant County Radio System improvement Project Trunked Group Phase Ill THIRD AMENDMENT TO CONSULTANT SERVICES CONTRACT This Third Amendment to Consultant Services Contract (Third Amendment) dated this 11th day of December, 2000 is by and between the City of Grapevine (the "City") and RCC Consultants, Inc. ("RCC"). WITNESSETH: WHEREAS, The City and RCC are parties to that certain Consultant Services Contract dated October 13, 1998 (the "Contract") for telecommunication consulting services; WHEREAS, The City has a need for additional services from RCC and both parties desire to amend the Contract; NOW THEREFORE, in consideration of the promises and mutual covenants and agreements contained herein, the parties hereto agree as follows: (1) In addition to the Scope of Work performed by RCC pursuant to Article 1 of the Contract RCC shall perform the services identified in Attachment 1 (RCC's Consulting Services Proposal dated 12/5/00). (2) In addition to the Compensation to be paid to RCC pursuant to Article II of the Contract, the City shall pay to RCC for the Additional Services, the sum of thirty thousand, five hundred, ninety-six dollars ($30,596). (4) The performance of the Additional Services shall commence upon execution of this Third Amendment and subject to the provisions of Article IV of the Contract, shall terminate upon delivery by RCC of the materials and reports required to provide the services and payment to RCC by the City the total sum specified in Paragraphs 2 and 3 above. EXCEPT AS MODIFIED HEREIN, ALL THE TERMS, COVENANTS AND CONDITIONS CONTAINED IN THE CONTRACT SHALL REMAIN IN FULL FORCE AND EFFECT. City of Grapevine Consultant Services Contract, Amendment Three —12/11/00 Page 1 of 2 IN WITNESS WHEREOF, the parties have executed this Third Amendment on the day and year first above written. ATTEST/WITNESS: By: Its: ATTEST/WITNESS: By: RCC CONSULTANTS, INC.: Mike Hunter, President/CEO City of Grapevine Consultant Services Contract, Amendment Three — 12/11/00 Page 2 of 2 0 RCC Consultants,, Inc. Consulting Services NE Tarrant County Trunked Group - Radio System Improvement Project -PhaseIII- System Implementation Overview Hardware Acceptance Testing Radio Coverage Acceptance Testing II• � �� Ili ro"710 2CC RCC Consultants, Inc. 12/11/00 NE "Farrant County Radio System Improvement Project 2 of 14 'I runked Group Phase III RCC Consultants, Inc. 12111/00 Section 1 General Understanding Radio System Improvement Project Phase III 1.1 Background Information RCC Consultants, Inc. has worked with the City of Grapevine, Texas and the Northeast Tarrant County Trunked Group (Consortium), of which Grapevine is a member, on various stages of the Radio System Improvement Project. Phase I included the evaluation of Grapevine's existing trunked radio system resulting in the delivery of a report outlining recommendations for improvement. The Phase II portion of the project incorporated the development and delivery of Request for Proposals to the vendor community. Motorola Inc. was the responder to the RFPs and consequently the Consortium has concluded an agreement with Motorola to implement a three -site simulcast trunked radio system. Included in this agreement is the implementation of a five -position trunked radio communications console system at the City Grapevine public safety answering point. This Phase III Proposal addresses the tasks associated with the overview of the trunked simulcast system and communications console system implementation. 1.2 General Approach RCC Consultants, Inc. (RCC) has available a team of consultants whose background and prior experience include the skills necessary to successfully complete this project. Personnel from the Dallas/Fort Worth Metroplex will be involved in the project with support from our Houston, Texas office available, if needed. These individuals have an extensive background working with city governments in the area of radio communications. RCC follows a structured process when considering project work. ■ Phase I addresses the issues and needs of an agency and translates these needs into operational or technical recommendations, or both. The recommendations are presented by means of a formal report. The City of Grapevine is in possession of a copy of the Report, which was delivered in November 1998. ■ Phase II involves the development of detailed system design including the outlining of technical specifications and requirements. The output NE'rarrant Count} Radio S}stem Improvement Project 3 of 1 7 runked Croup Phase III RCC Consultants, Inc. 12/11/00 of this phase is a formal Request for Proposal (RFP) that is sent to the vendors. Phase II also includes the review of the proposal submitted by the vendors and discussions/negotiations with the vendors in regards to any issues with the proposal. Phase II will also include RCC recommendations as to the vendor(s) that are most compliant with the RFP and meet the needs and requirements of the City of Grapevine. The Communications Console RFP was released to the vendor community in May of 2000. The Simulcast System RFP was released the following month. Motorola responded with a proposal on June 14, 2000 for the Communications Console System and on August 9, 2000 for the simulcast system. A revised proposal that addressed a number of Consortium issues regarding the simulcast system was received by the NE Tarrant Trunked group on October 25, 2000. After negotiations, agreement was reached with the City of Grapevine and the Consortium to accept the Motorola proposals. ■ Phase III encompasses the overview of implementation and testing of the systems provided by the successful vendor and is addressed in this document. 1.3 Project Scope RCC understands that the scope of the project is to provide for the overview and management of the implementation of the systems as described by the vendor proposals that resulted in response to the RCC RFPs. RCC will perform the following general tasks. (Details are included in Section 2) ■ Conduct a project "kick-off' meeting to apprise all parties of the project scope and to describe the contributions and responsibilities of all parties involved. ■ Review the project implementation time line provided by the vendor that denotes the critical path items and the order in which items must be implemented. Provide the Consortium with project progress reports and highlight any potential problem areas. • Provide technical assistance in the generation of FCC licenses and documentation to Region 40. ■ Approve a system "cutover" plan (supplied by the radio equipment vendor and/or his sub -contractor) so that radio service is minimally impacted when the new system is brought on-line. ■ Verify that the installation of the new equipment, and modification of existing trunked radio equipment meets the specification of the RFP as regards to grounding, cabling and general installation. Verify proper installation of the equipment shelters and standby generators and any other sub -systems. ■ Oversee the optimization and testing of the trunked radio equipment and the equipment associated with the trunked system at each radio site. • Work with Motorola to identify any installation or implementation errors or equipment faults and/or failures. Assist in the generation of a checklist (punch NI T arrant Count} Radio 5Nsiem Improvement Project 4 of 14 Trunked Group Phase III RCC Consultants, Inc. 12/11/00 list). Verify correction of the punch list items and certify the system ready for radio coverage testing. ■ Approve the Radio Coverage Testing Plan provided by Motorola. ■ Participate in the Radio Coverage Testing and Proof of Performance and verify the data provided by Motorola ■ Verify final acceptance of the system via a system checklist that will be provided to Consortium for their approval ■ Provide a final recommendation to the City of Grapevine and the Consortium regarding acceptance of the Grapevine Communications Console System and the Trunked Simulcast System. NE Tarrant CountyRadio SNstem Improvement Project 7 of 14 Trunked Croup Phase III RCC Consultants, Inc. i 12/11/00 NEI Tarrant CountN Radio System Improvement Project 6 of 14 Trunked Group Phase III RCC Consultants, Inc. Section 2 Radio System Improvement Project Phase III 12/11/00 The purpose of this workplan is to outline the major tasks that are to be performed and the deliverables associated with the tasks. * Task 1 - Provide a Detailed Work Plan ■ Hold Phase III Project Kick-off Meeting - Review General Scope of the Project - Review the work plan and project schedule and timeline provided by the vendor - Provide on-going (bi-weekly) progress reports to the City Consortium Deliverable - Attend Project Kick-off meeting. ❖ RCC Deliverable - Attend Project Kick-off meeting and provide scope of work and project schedule. * Task 2 - Assist in completion of FCC licenses and Region 40 documentation - Provide assistance to the Consortium in the completion of FCC licenses - Provide assistance to the Consortium in the completion of documentation required by Region 40 * Task 3 - Approve a system Implementation and Cut -Over Plan RCC Deliverable - Working with the vendor (Motorola) review and approve the system cut -over plan to ensure that radio service is minimally impacted during the period when the new system is brought on-line * Task 4 - Verify that the installation of trunked infrastructure equipment meets the specifications of the RFP •:- RCC Deliverable - Completed hardware checklists that verify that the equipment has been installed in accordance with the specifications and the vendors proposal. ti iarrmil Couuiv Radio System Improvement Project 7 of 14 Trunked Group Phase III RCC Consultants, Inc. 12/11/00 • Task 5 - Complete final equipment and system testing prior to system acceptance and proof of performance testing. The Consortium and the vendor shall mutually agree upon any tests preformed. RCC will assist in defining the tests to be preformed. Equipment to be tested, at each site, is noted below. 1. Console electronics banks 2. Console operator positions 3. Audio Switch/Simulcast Central Electronics Package 4. Trunked repeater stations 5. Trunked controllers 6. Transmitter combiners 7. Receiver multicouplers 8. Channel banks 9. GPS time & frequency standards 10. Audio distribution equipment 11. Receiver voting equipment 12. Antenna systems 13. Standby power generators 14. Ancillary equipment not noted above ❖ RCC Deliverable - Working with the vendor, define the tests to be preformed on the equipment via a mutually agreed upon test plan. Test the equipment at each site. Ensure that all outstanding open issues identified on a system "punch list" are addressed and that the system is ready for final system acceptance. • Tasks 6 - Approve the Radio Coverage Testing Plan provided by Motorola and participate in the Radio Coverage/Proof of Performance Testing. ❖ RCC Deliverable - Approve the radio coverage test plan developed by the vendor. Participate in the radio coverage testing and review and approve the report supplied by the vendor that addresses the test data and the results of the testing. • Tasks 7 - Provide documentation of final acceptance and submit to the Consortium for approval. ❖ RCC Deliverable - A Final Acceptance Document that contains the results of hardware tests and radio coverage testing and a recommendation from RCC. F: T<<rrant Courit� Radio Sistem Improvement Project 8 of 14 Trunked Group Phase III w RCC Consultants, Inc. Section 3 Professional Fees & Expenses 12/11/00 NE Tarrant Counts Radio System Improvement Project 9 of 14 Trunked Group Phase III RCC Consultants, Inc. 12/11/00 RCC's cost proposal for professional fees and out-of-pocket expenses is based upon the amount of time and level of skill required to complete the engagement. RCC will invoice the City of Grapevine (on behalf of the Consortium) on a monthly basis for the work undertaken in the previous month. In addition, each invoice will include out-of-pocket expenses for items such as travel, hotel rooms, and meals while working on the project. Invoices are due within thirty days after billing. A breakdown of professional fees and an estimate of out-of-pocket expenses have been included in the following pages. Professional fees total $29,870.00 for the tasks indicated. Projected expenses total to $726.00 Total fees and expenses for the Phase III project is $30,596.00 Nig T'lrronI CousttRadio SN stem hnprmement Project 10 of 1'1 Trunked Croute Phase III w RCC Consultants, Inc. Northeast Tarrant County Trunked Group Radio System Improvement Project Phase III Project Implementation Costs 12/11/00 Proposed Staff: Tim Driscoll; Jim Baron Rate per Hour: $145.00/Hour Hours Hours Task Cost Total Tim Hours Driscoll Jim Baron Task I - Provide a Detailed Work Plan - Hold Project Kick -Off Meeting - Review General Scope of Work - Review Vendor Project Schedule & Timeline - Provide biweekly Progress Reports $2,030 14 10 4 Task 2 - Assist the Consortium in FCC Licensing Issues - Provide technical assistance during the submission of FCC and Region 40 documentation $2,320 16 0 16 Task 3 - Approve Cut -Over Plan - Review and approve vendor cut -over plan $2,320 16 8 8 Task 4 - Ensure that Installation of the trunked equipment meets the requirements of the RFP and follows the vendor's proposal - Complete hardware acceptance tests $5,800 40 24 16 Task 5 - Complete Final System Hardware Checklist $4,640 32 20 12 Task 6 - Approve Radio Coverage Testing Plan and Participate in Testing $10,440 72 36 36 Task 7 - Provide Documentation on Final Acceptance and Submit to the Consortium for Approval $2,320 16 8 8 Totals - Professional Fees $29,870 206 106 100 Estimated Expenses $726 Grand Total $30,596 NE T',rrr.3rtt Couniv R;ritio System Irnprotienient Project I 1 of 14 Trunked Group Phase III RCC Consultants, Inc. Northeast Tarrant County Trunked Group Radio System Improvement Project Phase III Estimated Expenses 12/11/00 Proposed Staff: Tim Driscoll and Jim Baron Total Tim Jim Expense Driscoll Baron Task i - Provide a Detailed Work Plan Mileage @$0.33/Mile $66 130 Miles 70 Miles Task 2 - Assist the Consortium in FCC Licensing Issues Mileage @$0.33/Mile $23 0 Miles 70 Miles Task 3 - Approve Cut -Over Plan Mileage @$0.33/Mile $66 130 Miles 70 Miles Task 4 - Ensure that Installation of the trunked equipment meets the requirements of the RFP Mileage @$0.33/Mile $132 260 Miles 140 Miles Task 5 - Complete Final System Hardware Checklist Mileage @$0.33/Mile $109 260 Miles 70 Miles Task 6 - Approve Radio Coverage Testing Plan and Participate in Testing Mileage @$0.33/Mile $198 390 Miles 210 Miles Task 7 - Provide Documentation on Final Acceptance and Submit to the Consortium for Approval Mileage @$0.33/Mile $66 130 Miles 70 Miles Total $726 1430 770 NE Tarrant Couat} Radio S}stein Improvement Project 12 of 14 Trunked Group Phase 111 m RCC Consultants, Inc. Section 4 Project Staffing 12/11/00 NE Tarrmit County Radio System Improvement Project 13 of 14 Trunked Group Phase III RCC Consultants, Inc. 1 1 ' 12/11/00 Mr. Gregory A. Munchrath, P.E., Vice President & General Manager - Southwest Region, will be the Executive Sponsor for the project. Mr. James C. (Jim) Baron, P.E., Managing Consultant, will be the Program Manager and primary technical advisor on the project. Tim Driscoll, Senior Consultant will assist Mr. Baron Resumes for these individuals will be provided if the Consortium desires. RCC reserves the right to reassign or otherwise change personnel on this project with due notification and mutual consent of the Consortium. Please direct any and all questions concerning this proposal to: RCC Consultants, Inc. Attention: James C. (Jim) Baron, P.E. 2106 Belleview CT Richardson, TX 75082 (972) 644-5280 Nc, T tyrant Coun,:, Radio SNst.em ImproNement Project 14 of 14 Trunked Group Phase III