HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER 401
MARCH 6, 2001
CONSTRUCTION CONTRACT — CREEK 23/17 CHANNEL
IMPROVEMENTS
City Council consider awarding a Construction Contract to Omega Contracting, Inc. for
the Creek 23/17 channel improvements in the bid amount of $3,474,877.00, authorize
staff to execute said contract, and take any necessary action.
FUNDING SOURCE:
Funds are available in the following accounts:
Fundina
Account
Amount
Award
Percent
Source
94 GO Bonds
178-78324-007
$373,830.48
7.8%
96 GO Bonds
178-78355-009
$32,169.52
.7%
SDUS Funds
116-48941-535-1
$75,710.00
1.6%
SDUS Interest
116-48941-535-1
$85,000.00
1.8%
OOA C.O.
116-48930-536-1-000001
$4,203,129.00
$3,474,877.00
88.1%
Private
178-21407
$1,892.77
.0%
Participation
TOTAL
$4,771,731.77
$3,474,877.00
100%
Budaet
Amount
Award
Percent
Engineering
$556,410.00
11.7%
Construction
$3,474,877.00
$3,474,877.00
72.8%
EA404 Permit
$20,000.00
.4%
Contingency
$720,444.77
15.1%
TOTAL
$4,771,731.77
$3,474,877.00
100%
BACKGROUND:
Freese and Nichols, Inc. prepared plans for the proposed Creek 23/17 channel
improvements. The project includes construction of approximately 7,200 linear feet of
February 28, 2001 (3:52PM)
retaining walls (both sides); 2,040 linear feet of channel lining; two 20 foot by 8 foot
culverts at Creekwood Drive; 2,100 linear feet of storm drain; channel excavation;
compacted fill and other items contained in the Bid Proposal.
A City inspector will be dedicated to this project and a 24-hour phone contact available for
citizens to reach the contractor representative for emergencies. The contractor is
committed to finishing the project in a very timely manner and will be on-site to address
any problems that may occur during construction. City representatives have met with
residents along the Creek project in the past and will continue to diligently address their
concerns and questions throughout the construction. The engineer's estimate for this
project was $4,047,300, so the $3,474,877 bid from Omega is an excellent one for the
City.
Bids were opened on January 19, 2001 at 2:00 p.m. We received eight (8) bids on this
project as listed below:
Contractor
Bid Amount
Omega Contracting, Inc.
$ 3,474,877.00
Linder -Stahl Construction, Inc.
$ 3,631,729.00
Jeske Construction
$ 3,697,221.00
Hays Construction, Inc.
$ 3,840,856.00
Architectual Utilities, Inc.
$ 4,131,885.00
Rebcon
$ 4,647,866.00
Tri Dal, Ltd.
$ 4,977,575.50
Texas Standard Construction
$ 5,124,236.00
The low bid appears to be in order, the references have been positive, and our
consultant recommends awarding the contract to the low bidder.
Staff recommends approval.
JLH/JSL/jdr
0:\AGENDA\03 06_01\creek_23_17_contract.DOC
March 1, 2001 (11:36AM)
GENERAL GOVERNMENT CAPITAL PROJECTS
Creeks 17 and 23 Stormwater Channelization Project
PROJECT DESCRIPTION
Design and Construction of the Channel Improvements to Creeks 17 and 23. These two locations have been
identified as the highest priority projects to address existing capacity and future capacity problems that could result
in flooding of private property.
PROTECT SCHEDULE B"in Find
Design Mar -95 Dec -00
Construction Mar -01 Aug -02
FISCAL IMPACT
1994 GO Bonds
373,830
FY -2001
v
Budget
t ,.
2000A C.O.'s
FY -2001
2,195,322
Design
483,250
73,160
556,410
Construction
32,170
2,000,000
1,474,877 3,474,877
Permit
20,000
20,000
Contingency
720,445 720,445
TOTAL:
$483,250
$2,093,160
$2,195,322
$0
$0
$0
$4,771,732
1994 GO Bonds
373,830
FY -2001
v
Budget
373,830
2000A C.O.'s
2,007,807
2,195,322
lies
4,203,129
1996 GO Bonds
32,170
0
Services
32,170
SDUS
0
Tits
$ao
$o
Funds/SDUS
Interest
77,250
83,460
160,710
Peripheral Fees
1,893
1,893
TOTAL:
$483,250
1 $2,093,160
1 $2,195,322
1 $0
$0
1 $0
$4,771,732
jMpACT ON OPERATING BUDGET
Cleaning of these areas would be dependent upon need.
z:
FY -2001
v
Budget
"Personnelx enses
0lies
lies
0
Maintenance
0
Services
0
Ca ital Outla
0
Tits
$ao
$o
FEB -26-2001 13:58 Freese & Nichols, Inc. 81? 735 7491 P.02i02
February 21, 2001
Irmil
FREESE•NICHOLS
Mr. Stan Laster, P.E.
Assistant Director of Public Works
City of Grapevine
P.O. Box 95104
Grapevine, TX 76099
Re- Construction Contract Recommendation
Creek 23/17 Channel Improvements
Dear Mr. Laster:
We have completed our review of the bids submitted for the construction of the referenced project.
There were eight sealed bids received and opened at 2:00 PM on January 1.9, 2001:
Omega Contracting, Inc.
$ 3,474,877.00
Linder -Stahl Construction, Inc.
$ 3,631,729.00
Jeske Construction
$ 3,697,221.00
Hays Construction, Inc.
$ 3,840,856.00
Architectural Utilities, Inc.
$ 4,131,885.00
Rebcon, Inc.
$ 4,647,866.00
Tri Dal, Ltd.
$ 4,977,575.50
Texas Standard Construction
$ 5,124,236.00
Having tabulated the bids, Omega Contracting, Inc. (OCI) is the low bidder for this project. The
information provided by OCI has met the requirements contained in the contract documents. Based on
our review and reference checks, it is our recommendation that the contract for the construction of the
Creek 23/17 Channel Improvement Project be awarded to Omega Contracting, Inc.
If you have any questions, please do not hesitate to contact us.
Sincerely,
FREESE ANDNICHOLS,
,J
Curtis B. Deitel, P.E.
xc: Jerry Hodge, City of Grapevine
Steve Gilbreath, P.E., City of Grapevine
John Robertson, P.E., City of Grapevine
Mike Nichols, P.E,, Freese and Nichols4
[GPv950&73T:U2MECAWARD,doc
Freese and Nichols, Inc. -' Engineers JEnvironmental Scientists' Architects
4055 International Plaza Suite 200 Fort Worth, Texas -T 76109-4895
817-735-7300 Fax 817.735-7491
•
•
4-j
C)
N
0*
4-a
tll
E
N
2
a
E
a)
c
C\j
OIle
O