Loading...
HomeMy WebLinkAboutItem 07 - Scribner Street Water SystemMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: ITEM R , 2 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER MARCH 6, 2001 CONSTRUCTION CONTRACT — SCRIBNER STREET WATER SYSTEM IMPROVEMENTS City Council consider awarding a Construction Contract to Hebard Utilities for the Scribner Street water system improvements in the Alternate B bid amount of $353,904.50, authorize staff to execute said contract, and take any necessary action. FUNDING SOURCE: Funds are available in the following accounts: Fundin Source 95 Utility Bonds 96 Utility Bonds 97 Utility Bonds 99 Utility Bonds 99 Utility Int. TOTAL Account 200-48930-534-1-000004WA 200-48930-534-2-000001 WA 200-48930-534-3-000002 WA 200-48930-534-5-000009 WA 200-48930-534-5-000009 WA Budget Engineering Construction GCISD Oversizing- Interlocal Agreement Testing Contingency TOTAL BACKGROUND: Amount Award Percent $2,282.00 .3% $12,639.00 1.8% $52,748.00 7.6% $103,888.00 15.1% $518,443.00 $353,904.50 75.2% $690,000.00 $353,904.50 100% Amount Award Percent $82,995.00 12.1% $353,904.50 $353,904.50 51.3% $138,694.60 20.1% $12,000.00 1.7% $102,405.90 14.8% $690,000.00 $353,904.50 100% Cheatham and Associates prepared plans for the proposed water system improvements along Scribner Street. This project extends the north -south transmission line from the February 28, 2001 (3:49PM) new middle school site to the existing 20" water line near the service center. The water _w line construction will take place on Scribner Street, Peach Street, the Service Center property and the vacant parcel of land at the intersection of Peach and Church Streets. The project includes construction of approximately 2,300 L.F. of 20" water line; 770 L.F. of 12" water line; 44 L.F. of 10" water line and 521 L.F. of 8" water line. Bids were opened on February 15, 2001 at 2:00 p.m. Two alternate pipe materials, concrete cylinder (Alternate A) and PVC (Alternate B) were specified with a substantial completion deadline of July 1St. Five (5) bids were received for this project as listed below: We are recommending the lowest priced alternative (PVC Pipe) be awarded. The low bid appears to be in order, the references have been positive, and our consultant " recommends awarding the contract to the low bidder. Staff recommends approval. JLH/JSL/jdr \\CHDN\SYS\DATA\PWORKS\AGENDA\03_06_01 \scribner_watedine_contract.DOC February 28, 2001 (3:49PM) Alternate A Alternate B Contractor Bid Amount Bid Amount Hebard Utilities $ 390,504.50 $ 353,904.50 Burleson Utilities, Inc. $ 407,860.29 $ 390,804.15 Barson Utilities, Inc. $ 474,696.85 $ 433,191.85 Pate Brothers Construction $ 507,121.98 $ 484,821.98 R -Con, Inc. $ 549,820.72 $ 532,121.72 We are recommending the lowest priced alternative (PVC Pipe) be awarded. The low bid appears to be in order, the references have been positive, and our consultant " recommends awarding the contract to the low bidder. Staff recommends approval. JLH/JSL/jdr \\CHDN\SYS\DATA\PWORKS\AGENDA\03_06_01 \scribner_watedine_contract.DOC February 28, 2001 (3:49PM) GENERAL GOVERNMENT CAPITAL PROJECTS SCRIBNER STREET (from Banyon Place North to Dove Tank 20" Water Line) A part of the Ball Street Transmission Line project #20 which is described as the Construction of a 20" water line in Scribner and Peach Streets from Banyon Place to the Dove Tank 20" transmission line at the intersection of Dove Extension and North Main Street for a distance of approximately 3,635 L.F. This transmission line delivers water from the TRA delivery point to the Central and Northwest sections of Grapevine as well as the proposed 2MG elevated water storage tank. Design Mar -00 Feb -01 Construction Mar -01 Jul -01 * To be reimbursed by future Water Impact Fees Impact to the operating budget includes water to flush the new lines and yearly flushing using half the amount of water as the initial flushing. Projected Annual Operating Impact FY -2001 FY -2002 Bud et Planned FY -2003 Planned FY -2004 Planned Total )<"roject lf.Ti Budget Planned Project Expenses 09130[00 FY -2001 FY -2002 FY -2003 FY -2004 FY:2005 Cost Design 43,864 39,131 Maintenance 82 82 82,995 Construction Services 353,904 124 124 124 619 353,904 GCISD Oversizing 138,695 0 Total $0 $247 138,695 Testing $206' 12,000 12,000 Contingency 102,406 102,406 TOTAL: $43,864 $646,136 $0 $0 $0 $0 $640,000 riding Source 2,282 2,282 95 Utility Bonds* 96 Utility Bonds* 12,639 12,639 97 Utility Bonds* 52,748 52,748 99 Utility Interest* 518,443 518,443 99 Utility Bonds* 43,864 60,024 103,888 TOTAL: 1 $43,864 1 $646,136 $0 $0 $0 $0 $690,000 * To be reimbursed by future Water Impact Fees Impact to the operating budget includes water to flush the new lines and yearly flushing using half the amount of water as the initial flushing. Projected Annual Operating Impact FY -2001 FY -2002 Bud et Planned FY -2003 Planned FY -2004 Planned FY -2005 Planned. Total Personnel Expenses 0 Supplies 0 Maintenance 82 82 82 246 Services 247 124 124 124 619 ,Capital Outlay 0 Total $0 $247 $206 $206 $206' $865 ac�rT...BY: 80UTHVJEST PANNING AND DESIGN; 817 265 8532; �AH�H1 AND ASSOCIATES February 26, 2001 City of Grapevine P.O. Box 95104 Grapevine, Texas 76099 Attn: John Robertson, P.E. Re: Water Improvements along Scribner Street (from Banyon Drive) along Peach Street, North to Existing 20" Dia. Water Line City of Grapevine .Engineer's Project No. 022-0t. FEB-26-01 3:30PM; PAGE 2/6 In accordance with your request, Bids for the referenced project were received on February 15'h at 2:00 p.m. at the Grapevine City Hall. The low bidder in the amount of $353,904.50 fa -Alternate `B' (PVC-DR25 Pipe) is ;1 Hebard Utilities 301 S.E. 14'hStreet Grand Prairie, Texas 75051 Tel: (817) 832-3161 Fax: (972) 263-9505 A financial statement submitted by ffebard Utilities indicates the company is in sound 4mcial health. We have also contacted several references that speak highly of Hebard Utilities. 1"herefore, we recommend the Contract be awarded to Hebard Utilities in the amount Bid. We enclose a Bid Tabulation of all Bids received for your information. If you would like us in attendance at your Council Meeting when the Contract is tole awarded, to answer any potential questions, please advise. r If we may be of the further service in this matter please advise. Sincerely, Keith Hamilton, P.E. Project Manager cc: Roger D. Hebard, Jr., Hebard Utilities David E. Mayes, Cheatham and Associates Enc. Bid 'fabulation F:\WOMG. P.,inz 0 I IJ4.be..Iid .. dMA ENGINEERS • PLANNERS ' SURVEYORS A Subsidiary Firm of Southwest Planning and Design, Inc. 1601 E. Lamar Blvd. - Suite 200 - Arlington, Texas 76011 817/548-0696 - Metro 265-8836 - Fax 817/265-8532 VICINITY MAP rrr