MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER
MEETING DATE: MARCH 20, 2001
SUBJECT: NORTHWEST AREA UTILITY ENGINEERING SERVICES
CONTRACT
RECOMMENDATION:
City Council consider approving an Engineering Services Contract with Cheatham &
Associates in an amount not to exceed $ 146,366.25 for the design of water and
wastewater facilities in the Northwest Area of Grapevine, authorize the City Manager to
execute said contract, and take any necessary action.
FUNDING SOURCE:
Funds are available as follows:
Funding Source Account Amount Award Percent
Private Development $ 671,540.00 58.4%
97 Utility Bond Int 200-48930-534-3-000001 $ 415,052.00 $146,366.25 36.1%
Water Impact Fees 200-48930-534-6-000003$ 63,436.00 5.5%
TOTAL $1,150,028.00 $146,366.25 100.0%
Budget
Amount
Award
Percent
Design
$ 100,366.25
$100,366.25
8.7%
GeoTech
$ 6,000.00
$ 6,000.00
.5%
EA
$ 40,000.00
$ 40,000.00
3.5%
Construction
$ 872,750.00
75.9%
Contingency
$ 130,911.75
11.4%
TOTAL
$1,150,028.00
$146,366.25
100.0%
March 15, 2001 (8:32AM)
The City Staff have developed a proposed water and wastewater plan to serve the
Northwest area of the City. This system will serve the two planned residential
developments, the Ranch of Lonesome Dove, and the proposed golf course, as well as
future development plans for Meadowmere Park.
Staff has negotiated this design contract to expedite this project to meet service needs
of Cannon Homestead and the Four Peaks residential development as well as the two
prospective commercial developments.
The system includes:
• a wastewater lift station located near Foxfire Lane,
• a force main extending from the new lift station to the existing lift station at Kimball
Road and Meadowmere Park Road # 4, and
• a 12" and 8" water line to complete the water loop of the 8" line constructed in the
mid 90's with CDBG funds.
The cost will be distributed between the four prospective developments, Cannon
Homestead Partnership, Four Peaks Development Corporation, Lonesome Dove Joint
Venture, The Ranch of Lonesome Dove and the City's future development of
Meadowmere Park.
The Engineering Services Contract includes geotechnical services necessary for the
design of the facilities and the preparation of an Environmental Assessment if required
by the Corps of Engineers. These two elements of the contract fall under Special
Services and are billed as needed.
Staff recommends approval.
JLH/jsl
0:\agenda\03-20-01 \NW_Area_DesignContract
March 15, 2001 (8:32AM)
GENERAL GOVERNMENT CAPITAL PROJECTS
NW Annexed Area Distribution Lines
The construction of an approximate 13,900 L.F. of 8" and 12" water line through Meadowmere Park to connect with a
new 8" line constructed under the federally funded Community Development Block Grant (CDBG) Program. This
will provide a looped water system for an area of town that was recently annexed.
W tMIJ M-961" 901 of UN 0
Design Apr -01 Jul -01
Construction Sep -01 Mar -02
Impact to the operating budget includes water to flush the new lines and yearly flushing using half the amount of
water as the initial flushing.
Projected Annual
O eratin Impact
FY -2001 FY -2002
Budget Planned
FY -2003
Planned
FY-2004
Planned
Total
Project
LTD
Budget
Planned
Project
Expenses
09/30/00
FY -2001
FY -2002 FY --2003 FY -2004 FY :2005
Cost
Design
146,366
Maintenance
136
136
146,366
Construction
Services
100,000
772,750
38
38
188
872,750
Contingency
130,912
0
Total
$0 $74
130,912
TOTAL:
$0
$246,366
$903,662
$0
$0
$0
$1,150,028
Funding
Source
1997 Utility Bond
Interest
146,366
268,686
415,052
Water Impact Fees
63,436
63,436
Private
Participation
36,564
634,976
671,540
TOTAL:
$0
1 $246,366
1 $903,662
$0
$0
$0
$1,150,028
Impact to the operating budget includes water to flush the new lines and yearly flushing using half the amount of
water as the initial flushing.
Projected Annual
O eratin Impact
FY -2001 FY -2002
Budget Planned
FY -2003
Planned
FY-2004
Planned
FY 2005
Planned
Total
Personnel Expenses
0
Supplies
0
Maintenance
136
136
136
408
Services
74
38
38
38
188
,Capital Outla
1
0
Total
$0 $74
$174
$174
$174 1
$596