HomeMy WebLinkAboutItem 15 - LibraryFROM:
MEETING DATE:
SUBJECT
RECOMMENDATION:
ITEM r /5- Mow
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER 9
APRIL 17, 2001
GRAPEVINE PUBLIC LIBRARY — Change Order No. 6
City Council consider approving Change Order No. 6 to the Grapevine Public Library
Expansion Project with T. W. Foster, Inc., Contractors in the amount of $14,785.02,
authorize staff to execute said Change Order, and take any necessary action.
BUDGET Amount Award Percent
Planning/Design $ 613,805.59 8.8%
Construction 4,832,487.00 69.7%
Owner Direct Expenses 675,000.00 9.7%
Furnishings and Signage 650,000.00 1,912.00 9.4%
Contingency 167,013.07 12,873.02 2.4%
TOTAL $ 6,938,305.66 $ 14,785.02 100.0%
FUNDING SOURCE:
Amount Award Percent
Library Building Account
$ 14,750.35
0.2%
99 GO Bonds
1,000,152.00
14.4%
00 GO Bonds
2,879,893.92
41.5%
00-A GO Bonds
2,823,991.39
14,785.02 40.7%
99 GO Bond Int.
67,000.00
1.0%
00 -GO Bond Int.
103,675.00
1.5%
Future Bond Sale
45,000.00
.6%
Contractor Reimbursement
3,843.00
0.1%
TOTAL
$ 6,938,305.66
$14,785.02 100.0%
BACKGROUND:
Acct. Nos,
100-48840-313-1
177-48840-010-313
177-48840-011-313
177-48840-012-313
177-48840-010-313
177-48840-011-313
177-48840-010-313
The Contract for the construction of the Grapevine Public Library improvements was
awarded to T.W. Foster, Inc. Contractors, Inc. by the City Council on April 18, 2000. The
Notice to Proceed for the project was issued on May 30, 2000. The original time allotted for
April 6, 2001 (7:21 AM)
Notice to Proceed for the project was issued on May 30, 2000. The original time allotted for
the contract is 390 days.
According to the contract, the Contractor is scheduled to be substantially complete on May
25, 2001. Since the beginning of the project, more than 80 days were lost due to rainfall
and/or temperatures which prevented work on the site. Staff anticipates construction of
Phase I (the new addition) will be completed in mid May. The entire project is anticipated to
be complete by late Summer of this year.
Change Order No. 6 specifically includes 6 items.
■ Item A is for the furnishing of materials and labor to modified 42" x 60" glass panels in the
interior "Teen Zone" wall in lieu of smaller and more restrictive 20" panels. This cost of
this item is $3,422.45 and is allocated out of the Building Contingency budget.
■ Item B is for the fully reconciled adjustments to reflect actual costs of drilled piers,
including casings, additional concrete and the piers for the parking lot light poles. The
cost of this item is $2,991.96 and is allocated out of the Building Contingency budget.
■ Item C is a $849.95 credit to the City of Grapevine for recovered costs from the
installation of specialized plywood decking on the curved portion of the roof canopy. The
cost of this item was included in Change Order No. 5. The credit for this item will be
returned to the Building Contingency budget.
■ Item D is for the furnishing of materials and labor to accomplish electrical items as
outlined in RFP #2. The total cost for this item is $5,266.75, with $1,912.00 of the cost
attributed to the Circulation and Reference Desks, which will be allocated out of the
Furnishings and Signage budget. The remaining $3,354.75 is allocated out of the
Building Contingency budget.
■ Item E is for the furnishing of materials and labor to accomplish electrical work, revising
the voltage on the humidifiers from 480V to 208V. The cost for this item is $3,275.62 and
is allocated out of the Building Contingency budget.
• Item F is for the furnishing of materials and labor to install gas line piping to HVAC roof
top units #6 and #11. The cost for this item is $678.19 and is allocated out of the Building
Contingency budget.
Change Order No. 6 totals $14,785.02.
Staff recommends approval.
RHP/JLH
April 11, 2001 (11:22AM)
CHANGE ORDER
This is CHANGE ORDER NO. 6 (Six1 to Contract dated MAY 30, 2000 for the construction of
THE CITY OF GRAPEVINE PUBLIC LIBRARY EXPANSION
Between T.W. FOSTER INC. (Contractor) and CITY OF GRAPEVINE TEXAS (Owner).
Pursuant to Paragraph 15 of the above referenced Contract, the Contractor is hereby directed to make
the following changes in the Work:
A.
Furnish materials and labor to install modified 42" glass windows in lieu of
designed 20" windows, complete in place:--
_ _ _ - -------------------------------------
$3422.45
B.
Adjust payment schedule to reflect actual costs of drilled piers, including casings,
additional concrete and -piers -for the parking lot light poles:- ---------------------
$2991 _96
C.
Adjust payment schedule to reflect credit to City of Grapevine for difference in
plywood decking on -curved -portion of roof canopy. - - - - - - - - - - - - - - - - - - - -
- - - - $849.95
D.
Furnish materials and labor to accomplish electrical items as outlined in RFP #2,
complete in place_-_-
_----------------------------------------------
$5266.75
-
E.
Furnish materials and labor to accomplish electrical work on humidifiers,
correcting voltage from 480V to 208V, -complete in-place: ------------
$3275.62
F.
Furnish materials and labor to install gas line piping to RTU's #6 and #11,
complete in place:-------
------------------------------------------------------------------------------
$678.19
TOTAL CHANGE ORDER AMOUNT: $14785.02
The Contract Price as adjusted through Change Order No. 5 was: $4,959,832.93
The Contract Price is hereby increased in the amount of: $14785.02
The Contract Price, taking into account the effect of this Change Order, shall be and is: $4,974,617.95
NCLC DOCUMENT 20 * CHANGE ORDER * 81994
NATIONAL CONSTRUCTION LAW CENTER, INC., PO BOX 57308, ATLANTA, GEORGIA 30343
Page 1 of 2
NATIONAL CONSTRUCTION LAW CENTER, INC.
CHANGE ORDER
The Date of Substantial Completion, as specified in the Contract shall not change and shall remain May
25, 2001. Final Project Completion shall remain June 23, 2001.
Execution of this Change Order by the Contractor shall have the effect set forth in Subparagraph 15(d) of
the above -referenced Contract.
OWNER ARCHITECT CONTRACTOR
City of Grapevine Phillips Swager Associates, Inc. T. W. Foster, Inc.
By: By: By:
(SIGNATURE) (SIGNATURE) (SIGNATURE)
(TITLE) (TITLE) (TITLE)
(DATE)
Approved by City Council: April 17 2001
(DATE) (DATE)
NCLC DOCUMENT 20 * CHANGE ORDER * 81994
NATIONAL CONSTRUCTION LAW CENTER, INC., PO BOX 57308, ATLANTA, GEORGIA 30343
Page 2of2
April 2, 2001
Elbridge Christison
City of Grapevine
Grapevine, Texas 76051
1606 lr-jousTRtAL COURT • ARLINGTON, TEXAS 7601 1 • METRo 617-265-J1 62
RE: Grapevine Public Library
Dear Mr. Christison,
Below is the price for the changing of the storefront glass in children's area
Storefront and Glass
$3,000.00
Bonding
$100.00
Liability Insurance
$4.76
Umbrella Insurance
$5.01
Builder Risk Insurance
$1.55
Subtotal
$3,111,32
10% OHIP
311.13
Total
$3,422.45
If you have any questions or need more information please call me.
Thank You,
AN EQUAL OPPORTUNITY EMPLOYER
TWF
T. W. FOSTER 1NC. 1 606 INDUSTRIAL COURT • ARLINGTON, TExAs 76011 • METRO Ell 7-265-9162
l • •
April 2, 2001
Elbridge Christison
City of Grapevine
Grapevine, Texas 76051
RE. Grapevine Public Library
Dear Mr. Christison,
Below is the price breakdown for the pier depth report (revised) on Grapevine Public Library
Deduct for smaller piers
-$1,407.00
cost for larger piers
$4,067.00
Bonding
$50.00
Liabitity Insurance
$4.22
Umbrella Insurance
$4.38
Builder Risk Insurance
$1.36
Subtotal
$2,719.96
10% OHIP
$272.00
Total
$2,991.96
If you have any questions or need more information please call me.
Thank You,
Jim Her "
Pr ct Manager
T . Foster, Inc.
AN EQUAL OPPORTUNITY EMPLOYER
IRAIF
T. w. F o S T E R i N c s 1 OOB iNousTRIAL CCouFTT ® ARLINGTON, TExAs 7BOl l• MErRo 8l 7-205-9 i s
[adeli,11hid-
December 28, 2000
Tom Shaw
PSA Architects
Dallas, Texas 75231
RE. Grapevine Public Library
Dear Mr. Shaw,
Below is the pricing for the RFP #2 on the electrical on the Circulation desk, and
replacement VCT in lieu of carpet in room 107 & 108.
iThank You,
m Butler
Project Manager
T.W. Foster, Inc.
Wall telephone
$55.00
Extend conduit for desk
$400.00
New telephone stub ups
$110.00
Plug on separate circuit LA70 & LA 68
$550.00
Relocate telephone and Plug &circuit LA74
$275.00
Add plug on existing circuit
$63.00
Add poke through floor box data ports
$295.00
Add t/d @ reference & circulation
$1,512.00
Add plug on top of Grape arbor LA 18
$195.00
Wire (2) auto doors
$475.00
Wire (2) outlets in fury down for infrared
$196.00
Wire (2) Motorized shades location of existing
$160.00
Deduct for 5 J -boxes and circuit LA43
4300.00
VCT
$634.50
Bonding
$150.00
Liability insurance
$7.34
Umbrella Insurance
$7.72
Builder Risk insurance
$2.39
Subtotal
$4,787.95
10% OHIP
"Z8-80
Total
$5,266.75
AN EQUAL OPPORTUNITY EMPLOYER
FROM Parish Electric, Inc. PHONE NO. : 817 429 9435 Mar. 30 2001 08:35AM P2.
PARISH ELECTRIC HA OS FORTTWORT, INC.
TREET
FT. WORTH, TX 76142
817-451-2931 VOICE
817-429=9435 Fax.
February 21, 2001
TO: TW Foster, Inc.
ATTN : Jim Buttes'
RE; Grapevine Library
RFP No. 2
Add 1 wall telephone outlet on kitchen wall stub up only $55.00
Extend conduit into desk to serve duplex outlets on under side of
desks -1 computer clrcuit. and I general�-purp.6" circuit at feed as necessary t provide power tot all
fee -
jumper connect at base
receptacles in furniture $400.04
4 existing desks @$100.00 each $600.00
2 new desks @$300.00_each
(this is worst case - if furniture hook up is not over floor outlet)
Wiring for 5 furniture feed j -boxes
$375.00
(this is worst case - if furniture hook up is not over floor outlet )
$110.00
Add 2 new telephone stub ups only
Add 2 plugs on separate circuit (originally on general purpose $550.00
circuits) LA70 & LA 68
Relocate telephone and plug and add circuit LA74 $275.00
(originally all on CLA-18)
Add plug on existing circuit $63`00
Add poke through floor box - Walker RC3 with 4 data ports
and 1 internal duplex plug In existing .plumbers chase $295.00
Add 1 telephoneldupplex plug t S circulation desks reference ks and
add 1 telephone/du lex plug $1512.00
x@1.26.00 each 300.00
item C1 -deleted 5 i boxes and circuit La - 43 $
FROM : Parish Electric, Inc. PHONE NO. : 817 429 9435 tlar. 30 2001 013:50AM P1
PARISH ELECTRIC CO. OF FT. WORTH, INC.
5725 HART
FT.WORTH, TX 76112
817-451-2931 voice
817429-9435 fax
March 30,2001
TO: TW Foster
Attn. Jim Butler
Re.:. Grapevine Library
1201 Municipal Way
Grapevine
Proposed Changes
1.) add plug on top of grape arbor off existing circuit. (Le —18) $195,00
2.) wire 2 auto doors at main entrance off existing circuits. $475.00
3.) wire 2 outlets in Purr downs in cont. Room and meeting room for $196.00
infared equip. ( off existing circuits )
4.) wire two more motorized shade locations off existing circuit. (no separate
switches). $160.00
tha you
w
Greg Parish
Parish Electric
T. W. F O 5 T E R I N C., 1 BOB INDUSTRIAL CouRT • ARLINGTON, Texas 7BO1 1 • METRO 817-2B5-91 B2
CONTRACTORS
March 29, 2009
Elbridge Christison
City of Grapevine
Grapevine, Texas 76059
RE: Grapevine Public Library
Dear Mr. Christison,
Below is the breakdown for the electrical work on humidifiers 208 vs 480
Electrical
$2,867.00
Bonding
$900.00
Liabitity Insurance
$4.55
Umbrella Insurance
$4.80
Builder Risk Insurance
$9.49
Subtotal
$2,977.84
10% OH1P
Total
$3,275.62
If you have any questions or need more information please call me.
Thank You,
Jim Butler
Project Manager
T.W. Foster, Inc.
AN EQUAL OPPORTUNITY EMPLOYER
PARISH ELECTRIC CO. OF F61*T WORTH, INC.
5725 HART STREET
FT. WORTH, TX 76112
.817-451-2931 VOICE
817-429.9435 Fax
March 23, 2001
To: TW Foster, Inc.
Attn: Jim Butler
Re: Grapevine Library
1201 Municipal Way
Grapevine
Proposed Changes:
1. Plans show (4) FTU's to be on (1) 3pole 30amp circuit. However, they
pull more amps than shown.
4 FTU pull 7.25amp each
2 FTU pull 8.5amp each
1 FTU pulls 10.25amp each
I think that each should be on a 3pole 15amp breaker except for one and it
should be on a 3pole 20amp breaker. I suggest we add (7) 3pole 15amp
breakers and (1) 3pole 20amp breaker. The additional breakers would fit In
Panel HA.
2. The 7 humidifiers show single-phase 480voit circuit (3-1 pole 40 and
4-1 pole 30). However, they are 208volt not d80volt. I suggest we add
(2)2pole 30amp, (1) 2pole 50amp in Panel LA and (4) 2pole 50amp In
Panel LC and upgrade wiring size to take care of 2 additional 50amp
circuits.
Breakers $2471.00
Wiring for 2 extra 50arnp circuits versus 30amp $ 396.00
Mote: leaving the
Square O will not take back any breakers for credit,l suggest9
existing in as spares.
Thank you.
TA LIACG•TLi TfA0i P71 'teL1 CS176 fi?t7 )TR : *oil 3POHJ `OTaloat3 WST,pd : 110d3
,,-_,--TWF
T. W. FOSTER INC.
CONTRACTORS
April 3, 2001
Elbridge Christison
City of Grapevine
Grapevine, Texas 76051
RE: Grapevine Public Library
Dear Mr. Christison,
1 BOB INDUSTRIAL. COURT • ARLINGTON, TexAs 7601 1 *Mt--, oB17-265-91 B2
Below is the breakdown for the gas line to RTU's 6 & 11
Mechanical
$589.30
Bonding
$25.00
Liabitity Insurance
$0.94
Umbrella Insurance
$0.99
Builder Risk Insurance
$0.31
Subtotal
$616.54
10% OHIP
61.65
Total
$678.19
If you have any questions or need more information please call me.
Thank You,
Jim Butler
Project Manager
T.W. Foster, Inc.
AN EDUAL OPPORTUNITY EMPLOYER
04/03/01 TUE 11:20 FAX 972 561 5153 PRICE PLBG & UTIL, INC.
PRICE PLUMBING & UTILITIES INC.
110 INDUSTRIAL Det.
FORNEY.Y, TEXAS M26
FAX 'TRANSMITTAL
DATE:
April 3, 2001
TO:
T. W. Foster time.
ATT:
dim Butler
FAX NUMBER:
817-2742972
FROM:
derrell Neely
RE:'
Grapevine Library Expansion
PRICING FOR REVISION RFF03 DATED 3129/01
Change
10'
1112" to 2"Pipe
Add
$ 6100
Change
21'
2112" to 3"Pipe
Add
$ 23.50
Add
84'
1112" Pipe
Add
$ 142.00
Delete
51'
1/4" Pipe
Deduct
$ 36.20
Labor Add
Add
$ 482.00
Labor deduct
Deduct
$ 105.00
TOTAL
$ 512.$0
OH&P
15%
5 77.00
TOTAL ADD TO CONTRACT'
$ 588.30
TOTAL. NUMBER OF PAGES ( INCLUDING THIS TRANSMITTAL PAGE) (1)
PLEASE CALL IF YOU' HAVE NOT'RECEIVED'ALL PAGES OR IT IS ILLEGIBLE.
(972) 5645133