HomeMy WebLinkAboutItem 09 - Glade RoadMEMO TO: FROM: MEETING DATE: SUBJECT RECOMMENDATION: ITEM 0 --••� HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER//I,,/ JANUARY 18, 2005 ENGINEERING SERVICES CONTRACT AMENDMENT — GLADE ROAD City Council consider approving an amendment to the Engineering Services Contract with Turner Collie & Braden, Incorporated for the design of the Glade Road Reconstruction Project in an amount not to exceed $ 30,982.00, authorize staff to execute said contract amendment, and take any necessary action. FUNDING SOURCE: Funds are available as follows: Funding Source 02 GO Bonds Periphery St Fees Future Bonds TOTAL Budget Engineering Right -of -Way Construction Contingency TOTAL BACKGROUND: Account Amount Award Percent 178-78103-014 $580,000.00 $30,982.00 10.5% 178-21515 $68,844.86 1.2% $4,874,000.00 88.3% $5,522,844.86 $30,982.00 100% Amount Award Percent $580,000.00 $30,982.00 10.5% $288,250.00 5.2% $4,127,175.00 74.7% $527,419.86 9.6% $5,522,844.86 $30,982.00 100% Glade Road is the last major street reconstruction project approved by the voters in the 1998 GO Bond Election. The original design contract of $548,990.00 was awarded in April of 2003 to modify the existing two-lane asphalt rural roadway section with narrow shoulders and roadside ditches to a four -lane divided section with sidewalks on both sides of the roadway. The Grapevine / Euless City Limits Line runs down the center of the roadway. January 12, 2005 (3:24PM) The revised engineering services in the amendment reflect: • preparation of an additional nineteen right of way parcels, $16,720 • preparation of an additional nine temporary construction easements, $ 4,950 • landscaping design to match the existing Glade Road medians with the new landscaped medians, $ 2,342 • video detection traffic signals, $ 2,700 • additional survey for the Meritage Addition, the existing Baze Road drainage, and existing medians in Glade Road west of Champagne Blvd. $ 3,300 • plan modifications for construction phase details $ 970 TOTAL $ 30,982 Staff recommends approval. JSL 0:\AGENDA\2004\1-18-05\REVISED ENGR CONTRACT Glade Road January 12, 2005 (3:24PM) 01-12-2005 18:13 FROM -TURNER COLLIE AND BRADEN INC +817 698 6701 TurnerCollieOlBraden Inc. Engineers - Planners - Project Managers November 4, 2004 Mr. Mike Brownlee, P.E. City of Grapevine Public Works Department P.O. Box 95104 Grapevine, TX 76099 T-048 P.002/003 F-576 1200 SummitAvenue Suite 600 FortWorth, Tcxas 76102.4409 Tei: (017)698.6700 Fax: (817) 698-6701 TCS Job Number 052141580.0001 Re: Glade Road Reconstruction Supplemental Authorization Request (Rev. 1) Mr. Brownlee: This letter is a request for supplemental authorization to perform additional engineering services for the referenced project. Upon your approval, TCB will perform the following tasks. 1. Baze Road Median Opening. This item was requested by the City to provide for design of modifications to the median on Daze Road at Wildflower Trail. These modifications will result in improved access and circulation at the Wildflower Trail intersection during construction. Plans will be prepared to provide for a temporary median opening at the Wildflower Trail intersection, and to close the temporary, opening and return the median to its original condition. The requested fee provides compensation for preparation of additional plan details, notes, and bid items. 2. Video Detection. This item represents a change in scope requested by the City to provide video vehicle detection at the Baze Road and Euless -Grapevine intersections. The scope of the current contract calls for use of loop detectors. The requested fee provides compensation for revisions to plan sheets, details, notes, and bid items. Additional iandscapir . This item was requested by the City to provide for the preparation of landscaping plans and details for the Glade Road median between SII 121 and Champagne Blvd. TC$ effort includes additional topographic survey of the existing median and preparation of the base plan sheets which will be used by NJB for their landscaping design. NJB effort includes an additional site visit, and preparation of landscaping plans, details, notes, and bid items. 4. Additional ROW Acquisition and Easement Documents. This item provides for the preparation of 19 additional ROW acquisition documents and 9 additional temporary construction easements. The scope of the current contract provides for a total of 10 ROW documents and no easements. During the course of design it was determined that a total of 29 ROW documents (21 for Euless and 8 for Grapevine), and 9 temporary construction easements will be needed. The requested fee provides compensation for preparation of the additional documents and staking the parcel corners in the field. 01-12-2005 18:13 FROM -TURNER COLLIE AND BRADEN INC +817 698 6701 T-048 P-003/003 F-576 Turner Collie OBraden Inc Mr. Mike Brownlee, P.E. November 4, 2004 Page 2 5. Ad4jg2agLlgRggrPlic Surve . This item provides for additional topographic survey in the following 3 areas. 1) Meritage Street at Glade Road. Additional survey is needed at Meritage Street to confirm the elevation and location of the new pavement which was constructed subsequent to our initial survey. 2) Baze Road, from Glade to Wildflower Trail. Survey along Baze Road at Wildflower Trail is needed to prepare plans for the proposed median opening (Task 1). 3) Glade Road median from SH121 to Champagne Blvd. Survey of the Glade Road median is needed to provide topographic information for base drawings for the additional landscaping design (Task 3). Our estimated fee to provide these services is $30,982. A breakdown of the labor and non -labor costs for these services is provided on the attached sheet. If you have any questions, please contact me at (817) 698-6719. Sincerely, Stephen James, P.E. Principal City of Grapevine Glade Road Reconstruction SUPPLEMENTAL AUTHORIZATION NO.1 TCB LABOR 11/30/04 TASK LISTING Project Project Director Man a er Staff En ineer Senior Technician Technician Clerical TOTAL (SH 121 to Champagne Blvd. Survcon 4. ROW Acquisition Documents 15,200 1,520 $16,720 19 @ $800 each 1. Baze Street Median Opening Survcon 4. Temporary Construction Esmts 4,500 450 Add'I details, and bid items 1 6 6 $970 Survcon 5. Additional topo survey 3,000 300 $3,300 at Merita e, Baze, and Glade . Video Detection Modify plans, quantities, specs, and bid items 2 12 16 24,020 $2,700 0 $26,422 3. Landscaping SH 121 to Champ, Prep. of base sheets 1 4 8 $890 OTAL HOURS LABOR EXPENSE TOTALS 0 4 $0 $520 1$1,980 22 16 $1,360 14 0 $700 $0 56 $4,560 YI�I 7;L�7;Ilt J3�]:� SUBCONSULTANTS Subconsultants Newman Jackson Bieberstein Task 3. Landscaping Labor &Exp. 1,320 Admin. 10.00% 132 Subtler Subcontract Contracts Expensa $1,452 (SH 121 to Champagne Blvd. Survcon 4. ROW Acquisition Documents 15,200 1,520 $16,720 19 @ $800 each Survcon 4. Temporary Construction Esmts 4,500 450 $4,950 9 @ $500 each Survcon 5. Additional topo survey 3,000 300 $3,300 at Merita e, Baze, and Glade TOTALS 24,020 2,402 0 $26,422 TOTAL ESTIMATE $30,982