Loading...
HomeMy WebLinkAboutItem 06 - 31st Year CDBG ProgramMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: qpa rpya(+'r R a :� HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER FEBRUARY 15, 2005 CITY COUNCIL PUBLIC HEARING — 31sT YEAR COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM City Council conduct a Public Hearing to receive input relative to the proposed 31st Year Community Development Block Grant (CDBG) Program replacement of an existing eight inch cast iron pipe water line with an eight inch PVC line in Eckley Street between Wall Street and Walnut Street, authorize staff to proceed with the submittal to Tarrant County and take any necessary action. FUNDING SOURCE: The City of Grapevine is proposing a total contribution of funds not to exceed $26,640.00 for this project. By providing these funds, the City's CDBG application can potentially receive additional funding from the CDBG program. The City's current commitment to this project comprises 20% of the project budget. Funds are available as follows: Funding Source Account Amount Award Percent 31 st Yr. CDBG funds* N.A. $ 108,972.00 80.4% City FY 06 Water PCMF N.A. $ 26,640.00 19.6% TOTAL $ 135,612.00 N/A 100.0% Budget Amount Award Percent Engineering $ 12,108.00 8.9% Construction $ 100,900.00 74.4% Contingency $ 22,604.00 16.7% TOTAL $ 135,612.00 N/A 100.0% February 9, 2005 (11:19AM) The scope of the project is the replacement of an existing old water line in Eckley Street between Wall Street and Walnut Street. The estimated cost for this project is $135,612.00. We do not know the total funds that will be made available through this year's CDBG program. If CDBG funding plus City match funding does not meet the cost of construction after the bid opening, the City will be allowed to fund the remainder of the cost, or the project may be reduced in scope. This area is located in the Original Town of Grapevine, CDBG Target Area, designated as census tract 1137.052 in the 2000 Census. These improvements will contribute to the upgrade of the area by providing an improved water supply system and fire protection. We anticipate next year's CDBG project application will be the continuation of this waterline to connect with Sunshine Harbor addition. JLH/jsl/jdr 0:\AGENDA\2005\02-15-05\31st CDBG-public-hearing.doc February 8, 2005 (2:18PM) m 0 WWWWWO; TOR11 P7,71 17 _j "Y Lj 11 i A Fy- i ­2 WWWWWO; TOR11 P7,71 17 _j Lj WWWWWO; TOR11 P7,71 17 Lj Tl� illy Lj M11-OLEL, Lu CD LIQ < 0 D V A) C) LuIj ILA-, w CD LIJ