HomeMy WebLinkAboutItem 06 - Citizen Commentsr�
LOT IJ
HARVITAL ADDITION
VOL. 388-156, PG, 19
LOT 1. BLOCK 2
115898 SO. Ft T>.,, PLAT
2MOS ACRES
ZONING:
k—A PROFESSIONAL OFFICE h —F- HARIelt2l1''l il 11i,�
C)4 DISTRICT LOT 14 "QL illtl
8860 M FT,
0,2034 ACRE
e2
1 61 4
aapl A10
ul
-lb
41
ik,
BLOCK I
lse 0
ve 8, 116,
P, A'
zz LOT 11
8135 Sot FT.
OA887 ACRE
I x
LOT 10
0
40449 SO, FT.
1& tb 0,2399 ACRE
LOT 20X
DIEN SPACE LOT
0"
'0 ,
0
rya r
2865 DSO. FT. LOT 9
0.0655 ACRE J 60.1496 ACRE 515 SO. FT.
r. LOr 10
k'C1SS COURT
16,;41 SO, Fl_ G,834j ACRES
0 W. JS--j)jCA ntjtll
,, t. I
1 1,%T Ito
SOT— M
OA
p LOT 8
ThIG 40OWrAWA dwM not be r4oarded hr
any puqwm Thle dm*bo shcl be umd fbr BLOCK 1
9
REMEW PURPOSES ONLY 09p�gsLOT I �Xll
W
10
owm amto" Looft
P. M Mcv, W47
Oaft AUMW 294 2023
LOT 6
Ile' .1 C,Nrt
S 89*16'05' W JOO"0O' -�)r LOT 5
SG LOT I LOT 2 LOT -1 4 'tt, I'VE & uf-
c,,9
SEMI=
Dove Station. We are currently installing the infrastructure and will be building homes in Dove
Station and desire to be good neighbors.
We will soon be installing an underground storm drainage system in the rear 10of our
property. We will be removing the screen fence prior to installing the storm d1
rainage a
installing a masonry fence at our expense at our rear property line. �
Our desire is to install the fence as soon as possible so you are screened from the construction
activity.
This will be a multi -step process and will be done as efficiently and as quickly as possible as
outlined below.
Surveyor will locate property pins and stake the property line. (Note: The new all will
be fully located on Dove Station property)
Wall prep will take approximately two weeks.
Contractor will build the wall. The construction of the wall will take approximately one
month.
Eason Maykus
Cell : (817) 991-8781
+1 (817) 991-8781
cl
4
R,
Owl p A W- Vlk- vmaal! 460,
U;
Ot Of a
Nag0-
Mgt
•_
t��
Cln