HomeMy WebLinkAboutItem 03 - Texan Trail LandscapeMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER MEETING DATE: JUNE 7, 2005 SUBJECT: CONSIDER AWARD OF A LANDSCAPE DESIGN SERVICES CONTRACT FOR THE MEDIANS ON THE TEXAN TRAIL TO LA TERRA STUDIO, INC. RECOMMENDATION: City Council to consider approval of a landscape design services contract for the design of the medians on the Texan Trail with La Terra Studio, Inc. in the amount of $47,200.00. The contract is attached for Council review. FUNDING SOURCE: Funds for the design are available in account 178-78103-011, 00 GO Bonds Amount Basic Services $47,200.00 • Data Gathering/TxDOT Coordination • Schematic Design • Design Development • Construction Documents • Bid Phase Services • Construction Phase Services • Miscellaneous Expenses BACKGROUND: Construction will begin on the Texan Trail in September of 2005 and is estimated to be complete by December of 2006. Medians will be installed on the Texan Trail and staff will submit a cost-sharing grant to TxDOT for landscaping the medians. In this program, TxDOT would pay for all landscaping and irrigation materials and the City would be responsible for the cost of the installation. Staff is estimating that the cost of irrigation materials, landscaping and installation is approximately $400,000.00. June 1, 2005 (9:14AM) Staff sent Requests for Qualifications to a total of four engineering firms and two firms responded and were interviewed by staff on March 23, 2005 for the design of the landscaping on the medians on Texan Trail. Staff selected La Terra Studio, Inc. based upon their creativity and excellent presentation at the interview. The City Attorney reviewed the proposed contract with La Terra Studio, Inc. Staff recommends approval of the contract. EN June 1, 2005 (9:13AM) I�T•771f►•Z►•��rZrT•-� 'EIRr r FOR rSCAPE ARCHITECTURAL PROFESSIONAL SERVICES FO TEXAN TRAIL f ,I LANDSCAPE rAP This proposal/contract/agreement is for landscape architectural design and consulting services to be provided by la terra studio, inc. (the landscape architect) located at 2109 Commerce Street, Dallas, Texas 75201; for the City of Grapevine, Parks and Recreation Department (the client/owner/city) located at P.O. Box 95104, Grapevine, TX 76099 1. Project Scope 1.1 Area of Work The area of work consists of approximately 1.3 miles of TxDOT Right -of -Way that will be constructed on Business 114 (Texan Trail) from State Highway 114 (121) north to State Highway 26 (Northwest Highway). 1.2 Estimated Budget A construction budget for this project has not been determined. However, this proposal is based on a construction budget and the design associated with a project with a construction budget of $400,000. Any significant increase in budget may require additional time and effort by the consultant in order to adequately portray the increased design (see 4.2 Expanded Scope). 1.3 Basic Services Basic Services provided by the Landscape Architect shall consist of: A. Data Gathering/ Coordination with TxDOT (Ft. Worth office) B. Schematic Design C. Design Development D. Construction Documents E. Bid Phase Services F. Construction Phase Services 2. Basic Services 2.1 Data Gathering / initial Coordination with TxDOT A. The Landscape Architect shall meet with the Client in an initial kickoff meeting to establish the goals and milestones for the project. Texan Trail Median Landscape April 21, 2005 - 1 - B. The Landscape Architect will work with the City to obtain electronic base files from the Engineer who designed the road sections. The City is responsible for providing Landscape Architect with base data (i.e. digital line -work, topography, water -main, sewer, utility location, proposed R.O.W. improvements, etc.) necessary to create schematic, design development and construction documents. C. The Client will work with the Landscape Architect to obtain information pertaining to City requirements in reference to visibility triangles, standard irrigation specifications, and landscape requirements. D. The Landscape Architect will initialize contact with TxDOT to try and establish a clear and precise order for moving the project through the TOOT approval process. Throughout the project, la terra studio will work with the City in coordinating necessary elements of the project with TxDOT. 2.2 Schematic Desien A.The Landscape Architect shall visit the site to verify and inventory existing conditions, taking special note to vehicular circulation, adjacent landscapes, existing vegetation, views, and focal points. B. The Landscape Architect shall review the proposed road design to understand proposed road alignments and conditions, taking special note to vehicular circulation, curb cuts, turn lanes, and median widths. C. Based on previous discussions with City staff, the Landscape Architect will apply xeriscape landscape design principles during the schematic design of the project. D.The Landscape Architect will develop three (3) landscape concepts to present to City Staff. Upon City Staff selection of a concept, the Landscape Architect will proceed to finalize the selected concept into a final schematic design. E. The Landscape Architect will work with the City to develop a schematic irrigation plan to use during future phases of the project. la terra studio will acquire the services of a licensed irrigation designer to participate in the schematic design and cost estimating portion of the schematic phase. F. la terra studio will work with the City's current way -finding consultants to integrate way -finding into the project. G. The Landscape Architect shall prepare plans and sketches specifically addressing concepts for: - Earth forms - Hardscape Landscaping (with plant materials list) Landscape irrigation system (schematics) Architectural lighting -- Water Features Architectural elements H. The Landscape Architect will meet with city staff as needed throughout the schematic design phase of the project. la terra studio will also make presentations to City officials as need throughout this phase. (City Council, Park Board, etc....) 1. la terra studio will create a preliminary estimate of probable cost based on the selected schematic design concept broken-down into itemized materials per contract. Texan Trail Median Landscape April 21, 2005 -2- 2.3 Design Development Based on the approved Schematic Design and Preliminary Estimate of Probable Cost, the Consultant shall work in coordination with the Owner to provide Design Development documents consisting of drawings, sketch details, and other documents to fix and describe the size and character of the project as to the elements described above. A. Consultant shall submit to the Owner further Preliminary Estimates of Probable Cost. B. Consultant shall submit 60% Construction Documents to the City and to TxDOT for approval prior to complete final construction documents. 2.4 Construction Documents Services to be provided in this phase include the following construction drawings: A. Site plans at appropriate scale indicating all program elements in a legible manner. B. Layout plans dimensioning all proposed improvements. C. Demolition plan -- (if required) D. Drainage and grading plan E. Irrigation Plans and Specification (per City and TxDOT approved materials and method) F. Planting plans including all tree and turf selections for all locations. A plant list including plant names, sizes and character desired will be provided. G. Details for all landscape materials with specifications as required for proper construction, installation or finishing of all landscape components. H. Specifications in Standard CSI Format including Special Conditions. 1. Final construction cost estimate to include unit costs at current construction dollars. J. Erosion control plan, including preparation of storm water pollution prevention plan, in accordance with EPA requirements. 2.5 Bid Phase Services After completion and approval of the Construction Drawings the Consultant will provide the City assistance in bidding and awarding the construction contract for the project. This will include the following: A. Preparation of a "mark-up" of the standard City of Grapevine bid and contract forms including preparation of a contract bid schedule and bid quantities for the project. B. Furnishing plans and specifications for bidding. C. Plans & Specs. will be picked -up at the office of la terra studio (the cost of these will be recouped by a non-refundable fee paid for by prospective bidders). D. la terra studio will conduct a pre-bid meeting to be held at the City of Grapevine E. Answer contractor inquiries during the bid phase. F. Provide a bid tabulation of all bids received. G. Evaluate the lowest and second lowest bidders. Bid evaluation will include the following: Texan Trail Median Landscape April 21, 2005 -3- a. Past work history b. Financial resources C. Physical resources to produce the project d. A summary of the bid analysis will be provided to the City for use in selection and award of the construction contract 2.6 Construction Phase Services The Consultant will provide Construction Phase Services for the project. Services to be provided in this phase include: A. Periodic visits (a total of 3 visits to the site have been included as part of this phase) to the site to observe the progress and quality of construction and to insure the integrity of the design as indicated on the drawings. B. Provide support services to the City inspector. C. Consultation and advice to the City. D. Preparation of elementary and supplementary sketches required to resolve field conditions related to design. E. Approval of submittals and shop drawings submitted by contractors for conformance with the design concept. F. Approval or Denial of "approved equals" and/or substitutions. G. The consulting team shall not be responsible or liable for the Contractor's failure to perform the construction work in accordance with the contract documents. H. Coordinate and attend final site walk through with the City & TxDOT at the conclusion of the construction and provide a punch list to Contractor to complete the project. 1. Issuance of Final Acceptance Letter for final payment to contractor 3. Authorization of Services No professional services of any nature shall be undertaken by Landscape Architect pursuant to this contract until Landscape Architect has received written "notice to proceed" from the Owner. 4. Fees 4.1 For the Basic Services outlined above, the Landscape Architect shall be paid a total fee not to exceed Forty -Seven Thousand, Two Hundred Dollars without formal appeal by the city based on the following: 4.1.1 Data Gathering/ TxDOT Coordination $ 3,200 4.1.2 Schematic Design $ 9,000 4.1.3 Design Development $ 10,000 $35,200 4.1.4 Construction Documents $ 13,000 4.1.5 Bid Phase Services $ 3,000 $9,000 4.1.6 Construction Phase Services $ 6,000 4.1.7 Miscellaneous Expenses (printing, postage, courier etc.) $ 3,000 TOTAL $ 47,200 Texan Trail Median Landscape April 21, 2005 -4- 4.2 Expanded Scope In the event the Owner increases or decreases the budget of the project or the scope of services which is defined in this contract, the Landscape Architect will consider these elements as Adjusted Services and will charge or reduce the Owner on a time - basis per hourly rate listed below or at a fee mutually agreed upon by the Owner and Landscape Architect in writing prior to services being provided. 4.3 Billing la terra studio will bill the City of Grapevine for services performed each month. Billing will start on the 15`h day of the month in which this proposal becomes binding. la terra will send invoices on the 15`h of each month and will be due in 30 days from the date on the invoice. The last payment will not be due until la terra studio completes its contractual responsibilities contained here within. 5. Completion Schedule The work described in this proposal will be performed in accordance with the following schedule: Data Gathering / Coordination 3 weeks Schematic Design 3 weeks Design Development 4 weeks Construction Documents 6 weeks (Construction Documents will be submitted to the City for review at the 30°/x/60%/90% completion levels.) Note: The above schedule is for the design team's work effort only and does not include time required for internal review and approval by TxDOT or the City of Grapevine. Project Bidding Construction Phase Services 6. Project Deliverables Data Gathering/ TxDOT Coordination Schematic Design Construction Documents Bid Phase Services Construction Phase Services 2 months Per construction schedule Meeting Minutes (1 electronic copy to be e-mailed per meeting) Final Graphic R copy mounted on foam -core and a CD with image) 30/60/90% Plans and Specs (2 copies) Meeting Minutes R electronic copy to be e-mailed per meeting) Site Visit Reports U electronic copy to be e-mailed per meeting) Texan Trail Median Landscape April 21, 2005 -5- 7. Professional Liability Insurance Prior to the commencement of the design phase under this Contract, the Landscape Architect shall bind standard comprehensive & professional liability insurance coverage in an amount of at least $1,000,000.00 aggregate per year (max 3 years), covering the services provided under this Contract. Landscape Architect shall maintain such coverage during all phases of landscape architectural services under this Contract and for one (3) years from notice to proceed. The City shall be supplied with a certificate stating city coverage as "additional insured" of such coverage, which shall provide for a thirty (30) day notice to the City, by certified or registered mail, of cancellation, non -renewal, or material alteration. 8. Miscellaneous Provisions 8.1 Compliance with Laws The Landscape Architect shall comply with all published Federal, State, and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies in any matter affecting the performance of this Contract, including, without limitation, worker's compensation laws, minimum and maximum salary and wage statutes and regulations, and licensing laws and regulations. When required, the Landscape Architect shall furnish the City with satisfactory proof of compliance. 8.2 Status of Landscape Architect Landscape Architect acknowledges that Landscape Architect is an independent contractor } of the City and that Landscape Architect is not an employee, agent, official or representative of the City. Landscape Architect shall not represent, either expressly or through implication, that Landscape Architect is an employee, agent, official or representative of the City. Income taxes, self-employment taxes, social security taxes and the like are the sole responsibility of the Landscape Architect. 9. Additional Services 9.1 Additional Services A. The Landscape Architect will provide such Additional Services on an hourly basis with a mutually agreed "not to exceed" total or a mutually agreed upon flat fee in writing. Hourly rates for Additional Services are as follows: Principal $85.00/hour Intern Landscape Architect (CAD) $50.00/hour Administrative $40.00/hour 9.2 Additional services include the following: A. TDLR Review Process — This project, in its current state, does not have designated pedestrian access (median of a public street). B. Professional perspective sketches C. Utility design including storm sewer, sanitary sewer, water, etc. Texan Trail Median Landscape April 21, 2005 -6- D. As -built surveys/plans E. Applying for and obtaining construction permits that are usually completed by the construction contractor. F. Long distance trips to the field or nursery to individually select and approve plant materials (trips with -in the DFW Metroplex is included) G. Traffic Control Plans. la terra studio will designate in its construction package that the Construction Contractor is responsible for submitting a traffic control plan to TOOT and the City for approval prior to beginning construction. H. Geotechnical reports (meeting TMUTCD) used for structural engineering of potential architectural elements. I. Structural Engineered footings of potential architectural elements. J. Electrical Engineering for any proposed lighting components (landscape or architectural) 9.3 All fees are due and payable upon 30 Days receipt of invoice and are due at the office of la terra studio, inc., 2109 Commerce Street, Dallas, Texas, 75201. 9.4 Any major changes involved after Schematic Design drawings have been presented and approved will be charged on a time basis per hourly rates listed above. 10. Termination This Contract shall remain in full force and effect until the above referenced work has been completed. If either party defaults in the performance of this agreement or materially breaches any of its provisions, the non -defaulting or non -breaching party shall have the right to terminate this agreement by giving written notice of termination within fourteen (14) days of the default or breach. Upon receipt of said notice, the defaulting or breaching party shall have fourteen (14) days to cure such default or breach. If said default or breach is not cured, the agreement shall terminate automatically. All notices shall be mailed certified, return receipt requested, to the following: Doug Evens Kris Brown, ASLA, RLA City of Grapevine la terra studio, inc. Parks & Recreation Department 2109 Commerce Street 200 S. Main Street Dallas, TX 75201 Grapevine, TX 76051 Additionally, Client may terminate this agreement, without cause and at will, by giving Landscape Architect not less then 30 days written notice; provided that if this agreement is terminated, la terra studio, inc, shall be paid a lump sum equal to the unpaid portion of the fee for services performed prior to termination, together with reimbursement for miscellaneous expenses. 11. Project Maintenance It is not the responsibility of the Landscape Architect to ensure proper maintenance of plant material and irrigation system. Texan Trail Median Landscape April 21, 2005 _7_ Statement of Jurisdiction The Texas Board of Architectural Examiners (TBAE) has jurisdiction over complaints regarding the professional practices of persons registered as landscape architects in Texas. TBAE P.O. Box 12337 Austin, TX 78711-2337 (512) 305 — 9000 http://www.tbae.state.tx.us/active/home.html Authorization to Proceed: City of Grapevine, Texas Signature: Printed Name: Date: Texan Trail Median Landscape April 21, 2005 -8- la terra studio, inc. president Kris Browi, ASLA, RLA Date: 4-22-20003