HomeMy WebLinkAboutItem 12 - Bass Pro Drive14;�- -. - MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, ACTING CITY MANAGER :E TL MEETING DATE: JUNE 21, 2005 SUBJECT: ENGINEERING SERVICES CONTRACT AMENDMENT — BASS PRO DRIVE RECOMMENDATION: City Council consider: • Ratifying a contract amendment to the existing consultant engineering services contract with TranSystems Corporation relative to the Bass Pro Drive project in an amount of $14,791.00 previously approved by staff, • Approving a second contract amendment in the amount of $1,200.00 for additional survey work, authorize staff to execute said amendment, and take any necessary action. FUNDING SOURCE: Funds for this contract are available in the 03 GO Bonds, Account No.: 178-78106-015 Funding Source Account Amount Award Percent 95 GO Bonds 178-78348-008 $88,255.80 5.5% 96 GO Interest 178-78348-009 $10,039.62 0.6% 99 GO Interest 178-78110-010 $23,771.94 1.5% 00 GO Interest 178-78106-011 $306,143.49 18.8% 02 GO Bonds 178-78104-014 $309,644.01 19.0% 03 GO Bonds 178-78106-015 $862,145,14 $15,991.00 53.0% Peripheral Street Fees 178-21543 $25,687.53 1.6% TOTAL $1,625,687.53 $15,991.00 100% Budget Amount Award Percent Engineering $158,591.00 $15,991.00 9.8% Surveying $14,985.00 0.9% Construction $1,252,111.53 77.0% Contingency $200,000.00 12.3% TOTAL $1,625,687.53 $15,991.00 100% 0:\agenda\6/21/05\Bass Pro Engineering Amendment June 16, 2005 (2:32PM) After the first review of the Bass Pro Drive plans, staff decided to modify the cross section of the roadway from a four lane undivided section to a four lane divided section with turn lanes. This modification would maintain a consistent pavement section through both Grapevine and Coppell. The cost for these plan modifications was $14,791.00. The contract amendment was approved by Public Works Staff on April 14, 2003. The second contract amendment is required for additional survey work for the property at the northeast corner of Bass Pro Drive and Enchanted Way. Staff has met with the owner of the property and has agreed to modifications to the right of way and easements requested of the owner. The property owner has agreed to dedicate the right of way and easements to the City and has committed to participate in the cost of the project in an amount not to exceed $55,000.00 via a voluntary lien on the tract. The project is comprised of approximately 1,800 LF of street reconstruction from SH 121 east to the Grapevine - Coppell City Limits. The existing asphalt two lane roadway with roadside ditches will be replaced with a four lane divided concrete section with underground drainage and an enlarged bridge crossing Cottonwood Branch. This pavement section will match the new pavement section currently being planned by the City of Coppell. The current plan is to bid the two projects in one package to establish a single contractor on the project and reduce the potential for conflicts. The project is currently scheduled for bidding in the first quarter of FY 06. Staff recommends approval. O:\agenda\6!21/050ass Pro Engineering Amendment June 16, 2005 (2:32PM) CC) N S U LT ANTS May 31, 2005 Mr. Stan Laster Public Works Director City of Grapevine 200 South Main Street Grapevine, TX 76051 RE: Bass Pro Drive (Bethel Road) Jitterbug Land Investment, L.P. Parcel Map and Field Note Description Revisions Dear Stan: The following is the proposed fee for Supplemental Agreement #2 for the above-mentioned project. This letter details the services to be performed by TranSystems under this supplemental. Jitterbug Land Investment, L.P. Parcel Map and Field Note Description Revisions The following tasks have been identified for additional surveying needs: • Office Calcs and Revise Master Drawing, • Revise subject Parcel Map and Field Note Description (three originals), • Provide three Right -of -Way sheets for the proposed ROW, • Set additional final corner or offset final corner in the field. TOTAL LUMP SUM $ 1,200.00 $ 1,200.00 We sincerely appreciate the opportunity to continue to work with the City of Grapevine. If you have any questions or require additional information please give me a call. Sincerely, TranSystems Corporation Consultants �� (��' -__ Joseph C. Masterson, P.E. Senior Associate 500 West Seventh Street, Suite 600 - Fort Worth, Texas 76102 • (817) 339-8950 • (817) 336-2247