Loading...
HomeMy WebLinkAboutItem 16 - Material Disposal ServicesFROM: MEETING DATE SUBJECT: RECOMMENDATION: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BRUNO RUMBELOW, ACTING CITY MANAGER JULY 5, 2005 RENEWAL OF BID 121-2002, ANNUAL CONTRACT FOR MATERIAL DISPOSAL SERVICES City Council to consider renewal of annual contracts to Airport Sand and Gravel as primary contractor and Shred -Tech d.b.a. Sego, Inc. as secondary contractor for material disposal services. Annual Contract expenditures will be limited to the budget amount approved for this service. The bid tabulation is attached for review. FUNDING SOURCE: 174-43301-090-000 St. Maint./Cap. Replacement/Trans. Infrast. Maint.....$80,000 BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). Notice to bidders was published in the Grapevine Sun and the Fort Worth Star Telegram on February 14, 2002 and February 21, 2002. Bids were publicly read aloud per the attached tabulation sheet. This contract established fixed pricing for disposal services of excavated material to be used on an as needed basis by the Street Department. The bid was sent to thirteen vendors with four vendors responding. The bid requested pricing on various truckload configuration disposal of asphalt, concrete, dirt, brush and building debris. Council first awarded this contract on March 19, 2002. Originally, Shred -Tech, d.b.a. Sego, Inc. was overall low bid and awarded a contract as primary vendor. Airport Sand and Gravel was second low bid on items 1, 2, and 3 and awarded a contract as secondary vendor. A stipulation of the contract allows for a price re -determination at each contract renewal. The contract also stipulates that should the low bid vendor raise their price during any contract renewal above the secondary vendor that the contract can then be awarded to the secondary vendor. June 24, 2005 (9:32AM) Shred -Tech, d.b.a. Sego, Inc. has indicated they will renew their price but have requested an increase in pricing and have declined to bid on items 4 and 5. The increase for items 1, 2, and 3 is now higher than Airport Sand and Gravel as shown on the revised section of the bid tabulation. Because both vendors have performed the contract satisfactorily and the availability of areas for disposal are limited, it is recommend that the primary award be made to Airport Sand and Gravel and the secondary award be made to Shred -Tech, d.b.a. Sego, Inc. Staff Recommends approval. CD June 24, 2005 (9:32AM) ORIGINAL PRICING Todays Date: CITY OF GRAPEVINE Bid 121-2002 Material Disposal - Annual Contract VENDORS............................................. EA ruc oa u isposa o sp a t, oncrete, EA Truckload 22 Cu Yd Disposal of Asphalt, Concrete EA Truckload 7 Cu Yd Disposal of Brush or Building D EA TrucKload (16 Gu Yd) Disposal of Brushor Building Total......................................................................... Bid Summary: Sego, Inc Airport Sand and Gravel (Items 1, 2 & 3 Only) Waste Management BFI Waste Systems REVISED PRICING 06/24/05 Bid Tabulation Form BFI Waste Systems as _ Management of No. TX Sego, Inc. Airport Sand and Gravel Tatai,Price ;' Total.Price Total Price '. Total Price $105.00 $240.00 $35.00 $80.00 $7.00 $16.00 $15.00 $20.00 $330.00 $110.00 $22.00 $40.00 $35.00 $35.00 $35.00 No Bid $80.00 $80.00 $80.00 No Bid $790.00 $340.00 $160.00 $75.00 Total Bid $160.00 $75.00 $340.00 $790.00 Todays Date: 06/24/05 CITY OF GRAPEVINE Bid Tabulation Form Bid 121-2002 Material Disposal - Annual Contract Ref 11' Fief 2 VENDORS ............................................. Sego, Inc. Airport an an Gravel Item, Qty,, Unit Item Description - Totall'Price , 7 Total Price 1 1 EA TrucRlo9d (7 Cu isposal of Asphalt, Concrete, DF, etc. $12.60 $15.00 2 1 EA Truckload (16 CuDisposal of Asphalt, Concrete, Dirt, etc. $28.80 $20.00 3 1 EA Truckload (22 Z' uDisposal of Asphalt, Concrete, r5irt, etc. $39.601 $40.00 Total......................................................................... $81.001 $75.00 .,,...,umillaly. Total Bid Airport Sand and Gravel* $75.00 Sego, Inc $81.00