HomeMy WebLinkAboutItem 03 - Silver Lake CampgroundLw-=- MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, ACTING CITY MANAGER5�— MEETING DATE: SEPTEMBER 6, 2005 SUBJECT: APPROVAL TO REJECT ALL BIDS RECEIVED FOR CONSTRUCTION AND RENOVATION SERVICES AT SILVER LAKE CAMPGROUND RECOMMENDATION: City Council to consider rejection of all bids received for construction and renovation services at Silver Lake Campground. FUNDING SOURCE: Not Applicable BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid advertisement posted in the Fort Worth Star Telegram and the Grapevine Sun on July 3, 2005 and July 17, 2005. Staff issued bid documents to seven contractors. Two contractors responded to the invitation. Attached for review is the bid tabulation. The purpose of this solicitation was to obtain competitive offers for construction and renovation services at Silver Lake Campground. The services requested included two restrooms, new water & electric service to all sites, creation of 13 new RV sites, sewer service to 13 RV sites and five cabins, three wet wells, concrete walks, retaining walls and other miscellaneous features. Bids and plans were issued to five qualified contractors and two sub -contractors. A pre- bid conference was held on July 19th to answer all contractor questions regarding the project. Two of the qualified contractors returned bids. Both bids were higher than the amount budgeted for the project. Staff met with the design consultant to discuss why the bids were higher than their estimated cost of the project. The consultant explained that the installation of the lift stations and sewer lines to the depth designed in the lake area, caused the bidders to overestimate their bid price because of potential flooding that could occur during the winter construction months. The design consultant has agreed to redesign the sanitary sewer system in an effort to get the bids back in line with their original estimated costs. August 30, 2005 (4:44PM) In addition, the design consultant will break out the major elements of the bid package and bid them separately as buildings, electrical, and water and sewer packages. This should help in getting more competitive bids for the project. Staff will re -bid this project within the next week and will have the new bids on the October 16, 2005 City Council agenda for your review and approval. Our plan to close the campground in October, complete the renovation and open in April 2006 remains as previously discussed with Council. EN August 31, 2005 (9:19AM) Item Qt Unit B1410ro ect Number. 237-2005 Bid Q Kiri gate; 7/27/2005; 2:OOPM Tabulation of Bids V. Mobilization, complete in place Silverlake Bids Issued. 7 City of Grapevine $90,000.00 Bid/Pro ect Name;: Campground Bids Recd. 2 $158,344.00 $97,049.00 1st Ad: 7/3/2005 $200,000.00 $290,000.00 East Restroom Building Requesllng,DeLfz Parks 2nd Ad: 7/17/2005 Name of Bidder ........................................... $180,000.00 Modern Contractors Sanitary Sewer Lift Station #1 North Texas Contractors $110,480.00 Address .................................................... $178,193.00 131 E. Exchange, Ste 107 $130,000.00 4999 Keller -Haslet Sanitary Sewer Lift Station #2 City, State,Zi............................................. $137,173.00 Ft. Worth, TX 76106 817-624-5857/817-624-5967 Anil Jacob lZach Keller, TX 76244 817-430-9500/817-430-9207 Fusilier $160,000.00 Telephone/Fax.. ....... ....................... ....... Com an Re resentative ............................. Item Qt Unit Cost -Labor CostMaterial Total Cost Cast -labor Cost -Material Total Cast Mobilization, complete in place 1 LS $75,982.00 $46,570.00 $122,552.00 $90,000.00 $20,000.00 $110,000.00 West Restroom Building 1 EA $158,344.00 $97,049.00 $255,393.00 $90,000.00 $200,000.00 $290,000.00 East Restroom Building 1 EA $173,648.00 $106,429.00 $280,077.00 $70,000.00 $180,000.00 $250,000.00 Sanitary Sewer Lift Station #1 1 LS $110,480.00 $67,713.00 $178,193.00 $40,000.00 $130,000.00 $170,000.00 Sanitary Sewer Lift Station #2 1 LS $137,173.00 $84,074.00 $221,247.00 $50,000.00 $160,000.00 $210,000.00 Modular Stone Retaining Wali 115 FT $3,250.00 $1,992.00 $5,242.00 $2,000.00 $6,800.00 $8,800.00 Sanitary Sewer Lift Station #3 1 LS $133,837.00 $82,029.00 $215,866.00 $40,000.00 $160,000.00 $200,000.00 Sanitary Sewer System 1 LS $197,452.00 $121,019.00 $318,471.00 $75,000.00 $250,000.00 $325,000.00 Electrical System 1 LS $240,656.00 $147,499.00 $388,155.00 $90,000.00 $325,000.00 $415,000.00 Plumbing System 1 LS $120,231.00 $73,690.00 $193,921.00 $70,000.00 $255,000.00 $325,000.00 Trench Safety Plan 1 LS $7,192.00 $4,408.00 $11,600.00 $5,000.00 $5,000.00 $10,000.00 Wooden Risers at Cabins 5 EA $1,620.00 $993.00 $2,613.00 $1,500.00 $2,500.00 $4,000.00 Grass Establishment 1 LS $39,048.00 $23,932.00 $62,980.00 $4,000.00 $9,000.00 $13,000.00 Temporary Rye Grass Seed I Q.." r-4 6. 1 LS $15,619.00 $9,573.00 $25,192.00 $3,000.00 $7,000.00 $10,000.00 ..................................... ,,avc.vv .yvvU,V U.vU PQ,3U,Z)UU.UU yl,IIu,3Uu.UU BID GRAND TOTALS .................................... $2,281,502.00 $2,340,800.00 Bid Bond received, addenda acknowledged & bid was Bid Bond received, addenda acknowledged & bid was signed. Bidder did not write in "dollars & cents" on page signed. NOTES... ........ ............................... 11 SUMMARY OF BIDS Non Responsive Vendors: No Bid Vendors., BID SUMMARY: Low Bid Modern Contractors $2,281,502.00 AUI Contractors, L. P. None Dean Construction BH Worldwide Next Low North Texax Contractors $2,340,800.00