Loading...
HomeMy WebLinkAboutItem 10 - Vineyards Campgroundrrm 1P ...l.�r. MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, ACTING CITY MANAGER MEETING DATE: OCTOBER 18, 2005 SUBJECT: APPROVAL OF CONTRACT AWARDS FOR ELECTRICAL, WATER & SEWER AND BUILDING CONSTRUCTION AT THE VINEYARDS CAMPGROUND, AKA / SILVER LAKE CAMPGROUND RECOMMENDATION: City Council to consider award of contracts to Gifford Electric, Cooper General, and Reeves Construction to provide electrical, water & sewer, and building construction services at The Vineyards Campground / aka Silver Lake Campground. The total of all contracts will not exceed $1,196,921.32. Bid tabulations for each bid and the combined totals are attached for review. FUNDING SOURCE: Funding for this project is made available through the issuance of Certificates of Obligation authorized at the September 20, 2005 City Council meeting in the amount of $2,070,000 and proposed to be sold October 18, 2005. • Project Bids $1,196,921.32 • 2 Years Capitalized interest $ 174,500.00 • Bond Issuance Cost $ 50,000.00 • Engineering & Design $ 165,148.00 • City Forces ** $ 338,206.00 • Cabins $ 145,224.68 $2,070,000.00 "Materials and supplies to be used by City forces (Parks and Public Works) for our work on this project. BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). The bid advertisement posted in the Fort Worth Star Telegram and the Grapevine Sun on September 10, 2005 and September 24, 2005. October 13, 2005 (1:28PM) The purpose of this solicitation was to obtain competitive offers for electrical, water & sewer, and buildings at The Vineyards Campground/ aka Silver Lake Campground. The services requested included two restrooms, new water & electric service to all sites, creation of 13 new RV sites, sewer service to 13 RV sites and 5 cabins, three wet wells, concrete walks, retaining walls and other miscellaneous features. Staff created three bid documents and issued letters of interest to over forty prospective bidders. Five electrical contractors purchased plans with two contractors responding. Eight water & sewer contractors purchased plans with four contractors responding and six building contractors purchased plans with two contractors responding. Follow up contact with all prospective bidders was made prior to the bid opening date to insure a good bid response. Staff met with the Facilities Committee to discuss the three bid packages for The Vineyards Campground. During the discussion, the demolition and rebuilding of the west restroom was not accepted as an alternate bid. The Facility Committee's recommendation is for us to operate the west restroom "as is" until funding becomes available to replace it. The electrical package was deemed as the critical element to upgrading the campground and should be accepted. The water & sewer package will provide more reliable service and allow for increased revenues for the campground. Their findings supported the recommendation to accept the low bid of the water & sewer package, electrical package, and the buildings package. Staff recommends approval of contract awards to: • Gifford Electric for electrical services to the entire campground in the amount of $389,643.32 • Reeves Construction for the east restroom/laundromat only in the amount of $278,560.00. The west restroom will not be demolished at this time. • Cooper General Contractors for the water & sewer elements of the project in the amount of $528,718.00. Cooper General Contractors bid amount reflects acceptance of line items 1 — 41 and refusal of line items 42 (Grass Establishment) and 43 (Temporary Rye Grass Seed) per the attached letter from Cooper General Contractors. The campgrounds will close down upon approval of these bids and re -open in April 2006. 009 October 13, 2005 (4:OOPM) y r224b rJ re 10/05/2005 14:46 9722457970 COOPER GEN CON PAGE 01/01 Ca6NEFRAL CoNYRACTR]F38 F11 I I October 5, 2005 City of Grapevine P.O. Box 95104 Grapevine, TX. 76009 Attention.: Joseph.Moore (Assistant Dircetor) (Via fax 817.410.3005) Reference: Silver Lake Campground and RV (lark Water and Sewer Gentlemen: The purpose of this letter is to verify and acknowledge the it:c'ms discussed itt our meeting today. The general scope of work for this project is defined in Section 0 10 10 I.I.E. Further clarification was made on areas of scope to be by otbers, The items bcl<<w'will be performed by Elie Owner: 1., Demolition 2. .Asphalt roadway including the areas of trench excavat.iop under the new or existing areas. 3. Grading of the park outside of the arc<i.s disturbed by the Contractor. 4. General tree cutting. Cooper will work with the City in l.ayinp, out pipelines. No tree will be cut without the City's approval. Also, Pay Ttem 442 and #43 can be rernoved ('rorty the contract in ful 1. Che base Bid or the Additive Alternate would then be reduced. by $68,000. The a(ijwo.ed price without these i wo bid items is as follows: • The Base Bid is Five Hundred Twenty Thousand Eight Seven Hundred E=ighteen Dollars and No Cents ($528,7)8) a The Additive Alternate Bid is Six Hundred Tri ght 7 housand N in ety }tight Dollars and No Certs ($608,098) Please acknowledge the items above are per your understanding. Cooper looks forward to another fine project witil the City 0FGrapevine, Sincerely, Michael G. Daigre Project Manager Acknowledgement: JosQph 17_ Moore Assistant Director 972-245.7960 1225 E. Crosby -Al - Carrollton, Texas 76006 972-245-7970 Fax Tabulation of Bids _ *^ City of Grapevine Name of Bidder ........................................... Address..... ............... ......... ..................... City, State,Zip............................................. Telephone/Fax Number ............................... Company Representative.. .................... ...... RARF Rin 10/04/20 2:OOPM NOTES......... i p �o�,vro.o�i l �4Ub,L3b.UUl Bid Signed Bid Signed Addenda Acknowledged Addenda Acknowledged Bid Bond Included Bid Bond Included SUMMARY OF BIDS a 1 Mobilization, complete in lace 1 LS $6,012.00 $13,753.00 $19,765.00 $2,500.00 $0.00 $2,500.00 2 Switch ear 1 LS $6,054.00 $26,691.49 $32,745.49 $11,392.00 $39,396.00 $50,788.00 3 Electrical Pedestal, Purchased - Installed 25 Ea $4,423.00 $5,235.16 $9,658.16 $2,187.00 $1,740.00 $3,927.00 4 Electrical Pedestal, Installed only53 Ea $11,879.00 $6,877.17 $18,756.17 $4,636.00 $1,590.00 $6,226.00 512 1/2" PVC Conduit 5800 LF 1 $16,519.00 $11,553.00 $28,072.00 $57,516.00 $26,870.00 $84,386.00 612" PVC Conduit 9800 LF 1 $18,087.00 $13,763.00 $31,850.00 $18,043.00 $5,922.00 $23,965.00 711 1/2" PVC Conduit 3850 LF $5,959.00 $4,898.00 $10,857.00 $3,775.00 $1,340.00 $5,115.00 811 !/4" PVC Conduit 590 LF $746.32 $563.48 $1,309.80 $9,074.00 $2,638.00 $11,712.00 911" PVC Conduit 670 LF $815.00 $571.90 $1,386.90 $3,487.00 $1,514.00 $5,001.00 1013/4" PVC Conduit 1530 LF $1,860.00 $1,154.10 $3,014.10 $3,833.00 $1,311.001 $5,144.00 11 350 MCM Wire 14600 LF $29,075.00 $58,525.00 $87,600.00 $18,780.00 $63,200.001 $81,980.00 12 300 MCM Wire 9600 LF $15,595.00 $32,885.00 $48,480.00 $6,794.00 $25,867.00 $32,661.00 13 250 MCM Wire 700011-F $10,721.00 $20,149.00 $30,870.00 $6,036.00 $22,254.00 $28,290.00 14 4/0 Wire 5200 LF $7,464.00 $14,324.00 $21,788.00 $4,403.00 $14,929.00 $19,332.00 15 3/0 Wire 6700 LF $8,448.00 $14,868.00 $23,316.00 $4,374.00 $13,596.00 $17,970.00 16 2/0 Wire 2200 LF $2,261.00 $3,613.00 $5,874.00 $1,021.00 $2,924.00 $3,945.00 17 1/0 Wire 500 LF $486.00 $639.00 $1,125.00 $350.00 $986.00 $1,336.00 181#1 Wire 730 LF $549.60 $911.00 $1,460.60 $583.00 $1,397.00 $1,980.00 19 #2 Wire 1250 LF $1,064.00 $1,123.50 $2,187.50 $262.00 $530.00 $792.00 20 #3 Wire 940 LF $818.00 $868.00 $1,686.00 $2,741.00 $5,210.00 $7,951.00 21 #4 Wire 3850 LF $2,009.00 $2,226.00 $4,235.00 $2,187.00 $3,443.00 $5,630.00 22 #6 Wire 590 LF $360.39 $276.81 $637.20 $1,487.00 $1,850.00 $3,337.00 23 #8 Wire 3470 LF $1,375.00 $880.50 $2,255.50 $962.00 $835.001 $1,797.00 241#12 Wire DIM !-C A A111 TATA 1 1790 LF $489.851 $224.051 $713.901 $350.00 $120.001 $470.00 NOTES......... i p �o�,vro.o�i l �4Ub,L3b.UUl Bid Signed Bid Signed Addenda Acknowledged Addenda Acknowledged Bid Bond Included Bid Bond Included SUMMARY OF BIDS Tabulation of Bids City of Grapevine t Lake Campgi & Recreation 8 BidwRecd . 4 9/10/2005 2ndlON 9/2, Name of Bidder...........................................Cooper 1 LS General Contractors Wright Construction North Texas Contracting Joe Bland Construction Address...... -- ......................................... $27,600.00 1225 E.Crosby, Suite Al 601 W. Wall 4999 Keller Haslet Rd. 13111 Dessau Rd City,State,Zip............................................. 1 LS Carrollton, TX 75006 Grapevine, TX 76051 Keller, TX Austin, TX 78754 Telephone/Fax Number... ..... ....................... $4,500.00 $15,000.00 817-481-2594/817-481-2369 817-430-9500/817-430-9207 512-821-2808/512-821-2805 Comoanv Representative ............................. 100 LF Gene Conner I amnina Wrinht I.„ I .,, - I^- 01--a BASE BID # '. item: ._.ae^ ' . r1}v f friit t ahnr' :-,. . kAnfori�lc ,.- Tnf�l .,.K ,. , ��...r•' �e..a,:.;.,i.. Y..J1' rc� t: ,-t tea_ GF .. sc s ',.t . _r 1 Sanitary Sewer Lift Station #3 1 LS $10,000,00 $35,000.00 $45,000.00 $61,600.00 $64,400.00 $27,600.00 $92,000.00 $18,000.00 $45,000.00 $63,000.00 2 SCADA Monitoring System -Area A 1 LS $9,000.00 $8,400,00 $17,400.00 $19,000.00 $10,500.00 $4,500.00 $15,000.00 $9,000.00 $11,000.00 $20,000.00 3 6' Chainlink Fence w/PVC Slats -#3 100 LF $1,000.00 $2,500.00 $3,500.00 $4,400.00 $2,100.00 $900.00 $3,000.00 $1,700.00 $2,600.00 $4,300.00 4 6" SDR 35 PVC Sanitary Sewer Pie 500 LF $20,000.00 $9,280.00 $29,280.00 $11,100.00 $12,250.00 $5,250.00 $17,500.00 $22,080.00 $5,760.00 $27,840.00 5 4' Diameter Standard WW Manhole 3 EA $7,000.00 $5,000.00 $12,000.00 $5,400.00 $5,250.00 $2,250.00 $7,500.00 $2,700.00 $5,100.00 $7,800.00 6 4" PVC Lateral Line -Area A 810 LF $25,500.00 $15,000.00 $40,500.00 $16,605.00 $17,010.00 $7,290.00 $24,300.00 $29,160.00 $8,910.00 $38,070.00 7 Sewer Dump Connection 6 EA $300,001 $300.00 $600.00 $6,900.00 $1,260.00 $540.00 $1,800.00 $1,200.001 $3,600.00 $4,800.00 8 1 Sewer Main Trench Safety 1290 LF $645.001 $645.00 $1,290.00 $1,419.00 $1,806.00 $774.00 $2,580.00 $2,580.00 $0.00 $2,580.00 9 Sanitary Sewer Lift Station #2 1 LS $10,000,001 $35,000.00 $45,000.00 $56,400.00 $63,000.00 $27,000.00 $90,000.00 $18,000.00 $44,000.00 $62,000.00 10 SCADA Monitoring System -Area B 1 LS $9,000.00 $8,400.00 $17,400.00 $19,000.00 $10,500.00 $4,500.00 $15,000.00 $9,000.00 $11,000.00 $20,000.00 11 6' Chainlink Fencew/PVC Slats -#2 100 LF $1,000.00 $2,500.00 $3,500.00 $4,400.00 $2,100.00 $900.00 $3,000.00 $1,700.00 $2,600.00 $4,300.00 12 6" SDR 35 PVC Sanitary Sewer Pie 650 LF $26,000.00 $10,000.00 $36,000.00 $14,430.00 $15,925.00 $6,825.00 $22,750.00 $27,600.00 $7,200.00 $34,800.00 13 4' Diameter Standard WW Manhole 4 EA $7,600.00 $10,000.00 $17,600.00 $6,800,00 $7,000.00 $3,000.00 $10,000.00 $3,600.00 $6,800.00 $10,400.00 14 4" PVC Lateral Line -Area B 350 LF $10,000.00 $7,600.001 $17,600.00 $7,175.00 $7,350.00 $3,150.00 $10,500.00 $14,960.00 $4,840.00 $19,800.00 15 Sewer Dump Connection 5 EA $250.00 $250.001 $500.00 $5,750.00 $1,050.00 $450.00 $1,500.00 $1,000.00 $3,000.00 $4,000.00 16 Modular Stone Retaining Wall 176 FF $1,760.00 $4,400.00 $6,160.00 $15,312.00 $3,080.00 $1,320.00 $4,400.00 $2,992.00 $6,160.00 $9,152.00 17 Sewer Main Trench Safety 1000 LF $520.00 $520.00 $1,040,00 $1,100.00 $1,400.00 $600.00 $2,000.00 $2,080.00 $0.00 $2,080.00 18 Sanitary Swere Lift Station #1 1 LS $10,000.00 $35,000.00 $45,000.00 $56,400.00 $70,000.00 $30,000.00 $100,000.00 $18,000.00 $49,000.00 $67,000.00 19 SCADA Monitoring System -Area C 1 LS $9,000.00 $8,400.00 $17,400.00 $19,000.00 $10,500.00 $450.00 $10,950.00 $9,000.00 $11,000.00 $20,000.00 20 6' Chainlink Fence w/ PVC Dura Slats 100 LF $1,000.00 $2,500.00 $3,500.00 $4,400.00 $2,100.00 $900.00 $3,000.00 $1,700.00 $2,600.00 $4,300.00 21 6" SDR 35 PVC Sanitary Sewer Pie 208 LF $6,480.00 $6,000.00 $12,480.00 $4,617.00 $5,096.00 $2,184.00 $7,280.00 $9,776.00 $2,496.00 $12,272.00 22 4" PVC Lateral Line -Area C 100 LF $1,500.00 $500.00 $2,000.00 $2,050.00 $2,100.00 $900.00 $3,000.00 $3,600.00 $1,100.00 $4,700.00 23 4' Diameter Standard 'AW Manhole 1 EA 1 $1,500.00 $1,500.001 $3,000.00 $1,800.00 $1,750.00 $750.00 $2,500.00 $900.00 $1,700.00 $2,600.00 24 Sewer Dump Connection -Area C 2 EA $100.00 $100.00 $200.00 $1,150.00 $420.00 $180.00 $600.00 $400.00 $1,200.00 $1,600.00 25 Sewer Main Trench Safety -Area C 280 LF $154.00 $154.00 $308.00 $308.00 $392.00 $168.00 $560.00 $616.00 $0.00 $616.00 26 3" PVC Water Main 3170 LF $17,360.00 $8,000.00 $25,360.00 $41,210.00 $22,190.00 $9,510.00 $31,700.001 $63,400.00 $25,360.00 $88,760.00 27 2 1/2" AVC Water Main 120 LF $660.00 $300.00 $960.00 $1,500.00 $756.00 $324.00 $1,080.00 $2,400.001 $840.00 $3,240.00 28 2" PVC Water Main 2200 LF $8,200.00 $2,800.00 $11,000.00 $24,200.00 $13,860.00 $5,940.00 $19,800.00 $44,000.001 $13,200.00 $57,200.00 29 1 1/2" PVC Water Main 50 LF $200.00 $100.00 $300.00 $525.00 $280.00 $120.00 $400.00 st000.00l $250.00 $1,250.00 30 1" PVC Waer Main 1450 LF $5,525.00 $1,000.00 $6,525.00 $14,500.00 $8,120.00 $3,480.00 $11,600.00 $29,000.001 $5,800.00 $34,800.00 31 3/4" PVC Water Main 2550 LF $7,725.00 $1,200.00 $8,925.00 $24,607.50 $14,280.00 $6,120.00 $20,400.00 $51,000.001 $7,650.00 $58,650.00 32 Freeze Proof Hose Bib 89 EA $4,050.00 $36,000.00 $40,050.00 $133,500.00 $56,070.00 $24,030.00 $80,100.00 $8,900.00 $44,500.00 $53,400.00 3313" Water Cut Off Valve 7 EA $450.00 $2,000.00 $2,450.00 $3,640.00 $2,450.00 $1,050.00 $3,500.00 $840.00 $2,800.00 $3,640.00 3412 1/2" Water Cut Off Valve 2 EA $200.00 $600.00 $800.00 $1,020.00 $560.00 $240.00 $800.00 $200.00 $600.00 $800.00 35 2" Water Cut Off Valve 10 EA $700.00 $2,300.00 $3,000.00 $4,600.00 $2,100.00 $900.00 $3,000.00 $1,000.00 $2,500.00 $3,500.00 36 3/4" Water Cut Off Valve 91 EA $910.00 $3,640.00 $4,550.00 $26,390.00 $6,370.00 $2,730.00 $9,100.00 $9,100.00 $13,650.00 $22,750.00 37 2 1/2" Backflow Preventer and Vault 2 EA $1,000.00 $3,000.00 $4,000.00 $6,900.00 $2,800.00 $1,200.00 $4,000.00 $600.00 $1,800.00 $2,400.00 38 Water Main Trench Safety 9540 LF $4,770.00 $4,770.00 $9,540.00 $10,494.00 $13,356.00 $5,724.00 $19,080.00 $9,540.00 $0.00 $9,540.00 39 Movilization 1 LS $30,000.00 $0.00 $30,000.00 $2,560.00 $35,000.00 $15,000.00 $50,000.00 $45,000.00 $0.00 $45,000.00 40 Trench Safety Plan 1 LS $500.00 $0.00 $500.00 $550.00 $5,600.00 $2,400.00 $8,000.00 $600.00 $0.00 $600.00 41 Wooden Risers at Cabins 5 EA $1,000.00 $1,500.00 $2,500.00 $24,750.00 $3,150.00 $1,350.00 $4,500.00 $5,000.00 $5,000.00 $10,000.00 42 Grass Establishment 1 LS $15,000.00 $46,480.00 $61,480.00 $65,800.00 $28,000.00 $12,000.00 $40,000.00 $32,000.00 $8,000.00 $40,000.00 43ITemporary Rye Grass Seed 163000 SF $2,520.00 $4,000.00 $6,520.00 $6,520.00 $11,410.00 $4,890.00 $16,300.00 $4,890.00 $1,630.00 $6,520.00 BASE BID GRAND TOTAL........... $596,718.00 $739,782.501 1 $774,080.00 1 $890,060.00 BID ALTERNATIVES # items"- ' ," '`' 11 Q ' Unit ILabor jlylaterials '" Total - Labor IMaterials Total :.' Labor," :" Matenais Total-, I'-,'.-',,",'. Labor'"' s Materials'- Total ,- . A91 Sanitary Sewer Lift Station #2 -Area B I 1 LS 1 $10,500.001 $37,500.001 $48,00U01 1 1 $59,000.001 $73,500.001 $31,500.001 $105,000.001 $18,000.001 $50,000.001 $68,000.00 RAAF Rin Al SCADA Monitoring System -Area B 1 LS $9,000.00 $8,400.00 Bid Opening Date: 10/0412005; 3:OOPM Bid/Pro ect Number; 242-2005` Tabulation of Bids . N ,, <1-1 $11,000.00 $20,000.00 1 111 11 100 LF City of Grapevine T .. BtdiPro ect Name: Silver Lake Campground - Water/Sewer :Bids#ssued" 8 Bids Recd 4 $3,000.00 `-' Re uestin be t �'�' " Parks & Recreation ��sAd.� 9/10/2005 2ndAd 9/24/2005 Name of Bidder..... ... ............... ................. Cooper General Contractors Wright Construction North Texas Contracting Joe Bland Construction Address .................................................... $33,845.00 1225 E.Crosby, Suite Al 601 W. Wali 4999 Keller Haslet Rd. 13111 Dessau Rd City,State,Zip............................................. $10,000.00 Carrollton, TX 75006 Grapevine, TX 76051 Keller, TX Austin, TX 78754 7 Telephone/Fax Number ............................... $10,000.00 $4,000.00 817-481-2594/817-481-2369 817-430-95001817-430-9207 512-821-2808/512-821-2805 Company Representative ............................. $35,200.00 Gene Cooper Lamoine Wright Jav Louv Joe Bland RAAF Rin Al SCADA Monitoring System -Area B 1 LS $9,000.00 $8,400.00 $17,400.00 $19,000.00 $10,500.00 $4,500.00 $15,000.00 $9,000.00 $11,000.00 $20,000.00 A11 6' Chainlink Fence w1PVC Slats#2-Area 100 LF $1,000.00 $2,500.00 $3,500.00 $4,400.00 $2,100.00 $900.00 $3,000.00 $1,700.00 $2,600.00 $4,300.00 Al2 6" SDR 35 PVC Sanitary Sewer Pie 967 LF $41,020.00 $17,000.00 $58,020.00 $21.467.40 $23,691.50 $10,153.50 $33,845.00 $47,383.00 $11,604.00 $58,987.00 At 4' Diameter Standard WW Manhole 4 EA $10,000.00 $12,000.00 $22,000.00 $6,400.00 $7,000.00 $3,000.00 $10,000.00 $4,000.00 $8,000.00 $12,000.00 A14 4" PVC Lateral Line 1630 LF $35,200.00 $30,000.00 $65,200.00 $33,415.00 $34,230.00 $14,670.00 $48,900.00 $61,940.00 $17,930.00 $79,870.00 Aly Sewer Dump Connection 13 EA $650.00 $650.00 $1,300.00 $14,950.00 $2,730.00 $1,170.00 $3,900.00 $2,600.00 $7,800.00 $10,400.00 A16 Modular Stone Retaining Wali 176 FF$1,760.00 $4,400.00 $6,160.00 $3,872.00 $3,080.00 $1,320.00 $4,400.00 $2,992.00 $6,160.00 $9,152.00 All? Sewer Main Trench Safe 2600 LF $1,300.00 $1,300.00 $2,600.001 $2,860.00 $3,640.001 $1,560.001 $5,200.001 $7,800.001 wool $7,800.00 ALTERNATIVES GRAND TOTAL....... NOTES............................................................... Bid Signed Addenda Acknowledged Bid Bond Included $224,180.00 1 $165,364.401 Bidder did not separate labor & materials Bid Signed Addenda Acknowledged Bid Bond Included Bid Signed Addenda Acknowledged Bid Bond Included $229,245.00 1 Bid Signed Addenda Acknowledged Bid Bond Included $270,509.00 Contractors None SUMMARY OF BIDS LoWgidd6r, Vendor BASF RID Low Bid Cooper General $596,718.00 Next Low Wright Construction $739,782.50 Next Low North Texas Contracting $774,080.00 Next Low Joe Bland Construction $890,060.00 AL I tKNA 1 t 511.) Low Bid Wright Construction $165,364.40 Next Low Cooper General $224,180.00 Next Low North Texas Contracting $229,245.00 Next Low Joe Bland Construction $270,509.00 3-2005 Bid O erun ;Da ✓er Lake Campground -• t' - ilding Construction71 Bidst sued;^' rks & Recreations Modern Contractors, Inc. 131 E. Exchange Ave., Ste 107 Fort Worth, TX 76106 817-624-5857/817-624-5967 Anil Jacob 10/04/2005 4:OOPM �i 6 Bid Recd 2 9/10/2005 3iztdr�\d"., 9/2. 4 Unit..: Bid/Project Number Tabulation of Bids ' ; � ^" r�"' City of Grapevine - . ; d t Bidlfra ecNatnex $2,500.00 $0.00 Rs;st.` Name of Bidder ............... ............................ Reeves Construction Address.,... ...... ..................... 4111 U.S. Hwy 80 East City,State,Zip............................................. Mesgauite, TX 75150 Telephone/Fax Number ............................... 972-279-8300/972-279- Compan Representative ............................. jDavid Reeves BASE BID 3-2005 Bid O erun ;Da ✓er Lake Campground -• t' - ilding Construction71 Bidst sued;^' rks & Recreations Modern Contractors, Inc. 131 E. Exchange Ave., Ste 107 Fort Worth, TX 76106 817-624-5857/817-624-5967 Anil Jacob 10/04/2005 4:OOPM �i 6 Bid Recd 2 9/10/2005 3iztdr�\d"., 9/2. 4 Unit..: Labor Materials T tat - "x �aksir .- atei ialsM t' ` Tofa t ..fir. .» ;° Jnit� i:ce 1 Mobilization 1 LS $2,500.00 $0.00 $2,500.00 $37,038.00$24,692.00 $61,730.00 2 East Restroom Building 1 EA $120,273.00 $155,787.00 $276,060.00 $149,496.00 $99,664.00 $249,160.00 BASE BID GRAND TOTAL ............................................ $278,560.00 $310,890.00 Alt 1 J West Restroom Building I 1 1 EA BID ALTERNATIVE GRAND TOTAL ........................... NOTES.......................................... . 112,750.00 $197 $197 Bid Signed Addenda Acknowledged Bid Bond Included SUMMARY OF BIDS $146,265.001 $97,51 Bid Signed Addenda Acknowledged Bid Bond Included 775. Nines, c►rtsire-Vendors ttr Br`drF►d"ois x n, .x.:, - >� .: ` REC General Contractors Green Sca inFALTERNATEBID Bronson Construction Structures & Interiors Reeves Construction $278,560.00 Modern Contractors $310,890.00 Low Bid Reeves Construction TT197,000.00 Next Low Modern Contractors 1 $243,775.00 Rid/P�o -ot-Mg er �: . �, 241,242,443-2005 Tabulation of Bids �,,._ City of Grapevine sid)w6 Silver Lake Campground - Combined Bid Totals R Parks & Recreation 241-2005 jElectrical Gifford Electric $389,643.321 No Alternatives 242-2005 Water/Sewer Cooper General $596,718.00 1 Wright Construction** $165,364.40 243-2005 IBuildings Reeves Construction $278,560. 001 Reeves Construction $197,000.00 GRAND TOTALS................................................................ x$1,264,921.321 $362,364.40 *"Alternative low bidder not the same as base low bidder. Alternative low bidder did not separate labor and material costs. Tabulation of Bids fr City of Grapevine Aw� 241.242.243-2005 Silver Lake Campground - Combined Bid Totals Parks & Recreation 241-2005 Electrical Gifford Electric $389,643.32 No Alternatives 242-2005 Water/Sewer Cooper General $596,718.00 Wright Construction" $165,364.40 Less Item 42 Cooper General -$61,480.00 Less Item 43 EAReeves Cooper General -$6,520.00 243-2005 IBuildings Construction $278,560.001 Reeves Construction $197,000.00 GRAND TOTALS................................................................ 1 $1,196,921.32 "Alternative low bidder not the same as base low bidder. Alternative low bidder did not separate labor and material costs. $362,364.40