Loading...
HomeMy WebLinkAboutWS Item 01 - The T6V X ITFM it I MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, ACTING CITY MANAGER MEETING DATE: DECEMBER 6, 2005 SUBJECT: WORKSHOP ITEM - PRESENTATION BY THE T PRESENTATION Dick Ruddell from the Fort Worth Transportation Authority (The T) and Michael Morris from the North Central Texas Council of Governments will be present to discuss the attached proposal regarding the expansion of the Trinity Rail Express to downtown Grapevine. Mr. Ruddell will be prepared to discuss project timing, funding issues, construction and operational logistics. December 2, 2005 (8:54AM) a lanniar • n'gfor the U Fort Worth Tnimporlotiv a Authority 0(toier 2005 Fort Worth Transportation Authority (The T) Grapevine City Council: Presentation by Dick Ruddell President/Executive Director December 6, 2005 What was our Planning Purpose? Creation of a vision of public transportation in the western half of the Metroplex for the next 25 years Growth and- MoreGrowth 4 Tarrant County population 1.5M in 2004 Of counties over IM population, 6th fastest growing 2030 county population projected to be 2.3M Aimm d W-sou"A -lvwfvf,4iiodCu-p%" mAm" Loy-v "MW4tiA Energy and- Environment 2004 EPA designates Tarrant County and eight adjoining counties as "non - attainment" 2008 Year in which some experts predict that world oil production will peak Mission '�6 4 -*W "We will provide quality public transportation to meet the mobility needs ofour region." Fiscal Year 2005 5,535,000 bus patrons 826,000 TRE passengers 443,000 vanpool participants 288,000 MITS users Input from the Public 417 telephone survey participants 300 comment forms received and processed 138 people attending at least one of ten public meetings 14 one-on-one interviews with government, transportation and community leaders 13 focus groups with customers, business/civic leaders and others Goal One. Enhance- Public Transit Objectives: Effectively improve coverage, frequency and service span Simplify and improve. information and fares, Increase security at stops, buses and trains Goal Two: Expand Transit Options for Regional Travelers —Now Objectives. • Build and operate new regional rail corridors Serve the greater regional area Compete more with the private: automobile:: Goal Three: Create a More Seamless Regional Transit System Objectives: Improve multi -modal regional planning Increase regional ' collaboration and coordination, including regional • g information • re Integrate ion -wide g g transit modes Goal Four: Provide Transit Options rext 19 Objectives: Reduce travel time on existing TRE regional rail service (such as express trains) Create new higher speed/capacity service, such as regional rail or Bus Rapid Transit (BRT) along priority corridors • Implement Intelligent Transportation System (ITS) technologies to speed bus travel Goal Five: -Support the Sustainable Developmentof the Region - Objectives: • Promote transit oriented development Improve air quality and energy efficiency Increase attractiveness and cleanliness of transportation ; dors At, corri Reduce cost of travel in the region through promoting employee travel incentive programs, etc. Goal Six: Improve the Public Transportation Perception of Objectives: Position public transit as an attractive and desirable mode Increase knowledge of the relationship between transit and economic development Enhance the professional image of The T i October 14, 20051 The T Board of Directors adopted the Strategic Plan New Starts Project Development FTA APPROVAL. Alternative Environmental Preliminary Final Design Construction Analysis Impact Study Engineering (I Year) (2 Years) OPERATION (1 Year) (I Year) (I Year) 'I V TRE Expansion to DFW Airport Estimated Construction and Rolling Stock Costs* Cost Categories: Total Site Work & Urban Design 187431 Track work 57,460 Structures 41322 Stations (4) & Service Facility 12,600 Signal. System 42,216 Utilities 6,864 Crossings / Roadways 20,450 Duncan Subdivision 5,000 New starts consulting 2,000 Contract administration 1,000 170,343 Contingency Components: Major Investment Study (design) contingency 25,551 Construction 171034 Engineering, construction 25,551 & program mgt Total Contingency 68,137 Airport Access 60,000 Total Construction 2981480 Rolling Stock (4 sets at $8M each) 32,000 Total Constr. And Rollg. Stk. 330,480 TRE Expansion to DFW Airport Estimated Construction and Rolling Stock Funding Schedule Funding Source- Amount Local Funds: The T $25.500(l) Grapevine 34,000 (2) Total Local Funds 59,500 County 20,000 GOG 55,740 New Starts Grant Funding 41 % 1357240 Texas Mobility Fund 60,000 Total Construction and Rolling_ Stock Costs (1) Represents approximately $5.1 M per year for five years plus administrative overhead of approximately $1 M. (2) Represents $6.8M per year for five years.