HomeMy WebLinkAboutWS Item 01 - Lake GrapevineMEMO TO: HONORABLE MAYOR AND MEMBERS OF HE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER
MEETING DATE: MAY 18, 2004
SUBJECT: REVIEW OF THE PRELIMINARY FIVE-YEAR PLAN FOR THE
CORP OF ENGINEERS PROPERTY AT LAKE GRAPEVINE
Since March staff has been working to put together a plan for the Corps property that
incorporates the Council's directives for the development of the leased park lands. The
first issue is to make sure that the Corps lands will be self-sufficient and not require the
use of general tax revenues. The second directive was given on February 17th and that
was to go slowly in the development of the property with particular attention paid to the
existing revenue streams. The Feasibility Study completed by Carter -Burgess provided
us with a framework of what could be effective developments around the lake. The
proposed five-year plan incorporates several of the items outlined in the study.
There are three types of improvements in the proposed five-year plan. The first are City
owned and operated improvements that generate revenues for the support of the rest of
the system. The second are upgrades to amenities paid for, with one exception, from
the revenues from the City's operations on the Corps property. The final category is
concessionaire improvements with the City receiving a percentage of gross receipts from
the operation. The Feasibility Study broke the entire lease area into distinct park areas,
and the description of the five-year plan will also follow this model.
The proposed five-year plan also takes into account the longer term needs of the system
than just the operations over the next five years. The budgetary side of the plan
includes funding for capital replacements. There are currently more than 140 picnic
shelters in the newly leased area. Those shelters need repair and repainting and the
tables and elevated cookers need replacement from time to time. The replacement and
repair of these items, as well as fences, roads, signs and other amenities in the parks
are included in the budget presented with the five-year plan. The plan also includes a
longer term look than just the first five years of the City's lease. Years six through nine
are included for informational purposes as the lease with the Corps will be a long term
commitment for the City. No action is expected or warranted for years six through nine.
The next steps, once the Council approves the preliminary five-year plan, is to take the
plan to the public for comment. The Convention Center is already reserved in June for a
public meeting for comments and questions. A thirty -day written comment period will
remain open following that meeting. During this time the plan will also be provided to the
Corps of Engineers for any comments they might have. It is anticipated that there will be
at least one additional sub -committee meeting following the public comment period and
the final five-year plan will then be submitted to the Council in late August or early
May 13, 2004 (3:57PM)
September for approval as well as approval of the permanent lease with the Corps.
It is worth noting that even if the Corps approves the general plan as presented, the
Corps will also have to approve the development plan for each park individually when
the time comes to actually build the improvements. None of the improvements
proposed in the five-year plan impact areas classified as environmentally sensitive,
which should make the process much simpler.
The Council Corps Sub -Committee has reviewed the plan and its budget and
recommends taking the plan as presented forward through the public comment process.
May 13, 2004 (3:57PM)
Five Year',i-
Budget
YEAR ONE
Capital
New
Debt
Current
New
Operations
Maintenance
Construction
Service
Revenues
Revenues
Net
Meadowmere
32,044
6,244
26,130
(12,158)
Meadowmere Addition
2,143
-
140,800
12,278
10,135
Lakeview
21,028
3,257
6,971
(17,314)
McPherson Slough
13,451
3,546
7,384
(9,614)
Oak Grove
28,423
5,434
43,887
10,029
Acorn Woods
8,379
3,034
-
(11,412)
Silver Lake
184,933
6,244
197,435
6,258
Silver Lake Addition
15,885
502
757,162
-
47,483
31,096
Katies Wood
13,039
3,557
100,000
30,924
14,327
Fairway Drive
-
-
TOTALS
319,325
31,820
997,962
-
312,730
59,761
21,346
YEAR TWO
Capital
New
Debt
Current
New
Operations
Maintenance
Construction
Service
Revenues
Revenues
Meadowmere
32,685
6,244
26,130
(12,799)
Meadowmere Addition
2,063
80
38,385
36,242
Lakeview
21,448
3,257
6,971
(17,735)
McPherson Slough
13,720
3,546
7,384
(9,883)
Oak Grove
28,992
5,434
75,000
43,887
9,461
Acorn Woods
8,546
3,034
-
(11,580)
Silver Lake
188,632
6,244
197,435
2,559
Silver Lake Addition
64,543
1,004
-
189,931
124,385
Katies Wood
13,300
3,557
30,924
14,066
Fairway Drive
-
-
TOTALS
373,929
32,401
75,000
-
312,730
228,316
134,715
Five Yeari - Budget
YEAR THREE
Capital
New
Debt
Current
New
Operations
Maintenance
Construction
Service
Revenues
Revenues
Meadowmere
33,338
6,244
26,130
(13,453)
Meadowmere Addition
2,104
80
12,656
-
38,385
23,544
Lakeview
21,877
3,257
6,971
(18,164)
McPherson Slough
13,995
3,546
7,384
(10,157)
Oak Grove
29,571
5,434
43,887
8,881
Acorn Woods
8,717
3,034
-
(11,751)
Silver Lake
192,404
6,244
197,435
(1,214)
Silver Lake Addition
65,834
1,004
68,337
-
189,931
54,757
Katies Wood
13,566
3,557
8,989
30,924
4,811
Fairway Drive
TOTALS
381,408
32,401
-
89,982
312,730
228,316
37,255
YEAR FOUR
Capital
New
Debt
Current
New
Operations
Maintenance
Construction
Service
Revenues
Revenues
Meadowmere
34,005
6,244
26,130
(14,120)
Meadowmere Addition
2,147
80
12,656
-
38,385
23,502
Lakeview
22,315
3,257
6,971
(18,601)
McPherson Slough
14,274
3,546
7,384
(10,437)
Oak Grove
30,163
5,434
43,887
8,290
Acorn Woods
8,891
3,034
-
(11,925)
Silver Lake
196,253
6,244
197,435
(5,062)
Silver Lake Addition
67,151
1,004
68,337
-
189,931
53,440
Katies Wood
13,838
3,557
8,989
30,924
4,540
Fairway Drive
TOTALS
389,036
32,401
-
89,982
312,730
228,316
29,627
Assumptions:
Operational expenditures grow at 2% per year.
Capital maintenance rates remain contant as these are capital replacement costs that are their own fund.
Revenues are static with the exception of 5% rate increases in Year Five and Year Eight.
Fund Balance Requirement modeled after the requirements placed on all other funds of two months' expenditures.
Oak Grove restroom is not a vault toilet, significant savings expected with existing plumbing.
Years Six through Nine simply extend the model on through the next four years.
Anticipate a new restroom at McPherson Slough in Year Seven and at Acorn Woods in Year Nine.
Five YeaBudget
r
YEAR FIVE
Capital
New
Debt
Current
New
Operations
Maintenance
Construction
Service
Revenues
Revenues
Meadowmere
34,685
6,244
27,436
(13,493)
Meadowmere Addition
2,189
80
12,656
-
40,304
25,378
Lakeview
22,761
3,257
100,000
7,319
(18,699)
McPherson Slough
14,560
3,546
7,753
(10,354)
Oak Grove
30,766
5,434
46,081
9,881
Acorn Woods
9,069
3,034
-
(12,103)
Silver Lake
200,178
6,244
207,307
885
Silver Lake Addition
68,494
1,004
68,337
-
199,428
61,594
Katies Wood
14,114
3,557
8,989
32,470
5,809
Fairway Drive
TOTAL
396,817
32,401
100,000
89,982
328,366
239,732
48,898
Fund Balance
Operations and
New
Debt
Revenues-
Beginning
Ending
Requirement
Over (Under)
Maintenance
Construction
Service
Revenues
Expenditures
Fund Balance
Fund Balance
16% of Exp
Requirement
Year One
351,145
997,962
-
372,490
21,346
-
21,346
56,183
(34,838)
Year Two
406,331
75,000
-
541,046
59,715
21,346
81,061
65,013
16,048
Year Three
413,809
-
89,982
541,046
37,255
81,061
118,316
80,607
37,709
Year Four
421,437
-
89,982
541,046
29,627
118,316
147,942
81,827
66,115
Year Five
429,218
100,000
89,982
568,098
(51,102)
147,942
96,840
83,072
13,768
Year Six
437,802
-
89,982
568,098
40,314
96,840
137,154
84,446
52,709
Year Seven
446,558
100,000
89,982
568,098
(68,442)
137,154
68,712
85,847
(17,135)
Year Eight
455,490
-
89,982
596,503
51,031
68,712
119,743
87,276
32,468
Year Nine
464,599
100,000
89,982
596,503
(58,078)
119,743
61,665
88,733
(27,068)
Assumptions:
Operational expenditures grow at 2% per year.
Capital maintenance rates remain contant as these are capital replacement costs that are their own fund.
Revenues are static with the exception of 5% rate increases in Year Five and Year Eight.
Fund Balance Requirement modeled after the requirements placed on all other funds of two months' expenditures.
Oak Grove restroom is not a vault toilet, significant savings expected with existing plumbing.
Years Six through Nine simply extend the model on through the next four years.
Anticipate a new restroom at McPherson Slough in Year Seven and at Acorn Woods in Year Nine.
Paved Roadway (miles) 10.6
Picnic Tables (steel)
30
Picnic Tables (concrete)
116
Picnic Table Shelters
142
Drinking Fountains
13
Elevated Cookers
133
Security Lights
16
Playgrounds w/Equipment
5
Restrooms
8
Volleyball Courts (sand)
2
Basketball Goals
1
Group Pavilion
2
Pavilion Tables (steel)
29
Horseshoe Pit
1
Boat Ramps
10
Courtesy Docks
9
Pipe Rail Fencing (mile)
7.9
Guard Post/Cable (mile)
1.8
Signs (traffic)
112
Signs (parks)
98
Fishing Dock
1
Sanitary Dump Stations
2
Laundry Building
1
Electricity (less DD Light)
-
Honor vault (pay station)
10
Lantern Hangers
54
Fire Rings
64
Total Acres
122.8
Facility Acres
39.7
Open Field Acres
83.1
Cabins
0
Paved Trail (miles)
3.6
Small Pavilion
1
RV Pad
53
Chemicals
122.8
Litter Pick-up
122.8
Fish Cleaning Station
1
Trails (miles)
0
Gate Attendants
TOTAL FOR PARK
Expen�:-��` Totals
Regular
94
Regular
41
25.00 per cleaning
0
Maintenace Unit
Annual
Operating Unit
Annual Minor Unit
Major Unit
Replacement Unit
Cost Type
Frequency
Costs Type
Frequency Repair Type
Repair Type
Cost Type
1,500 per mile
8
40,092.00 Annual cost
5.50 linearfoot
5.50 If
w/shelter
w/shelter
5.00 per cleaning
710
50.00
3,550.00
w/shelter
75.00
10.50 monthly
12
150.00 each
1,000.00 each
15.00 per cleaning
658
250.00 per pumping
12 100.00 each
500.00 each
75,000.00 each
50.00 annual
8
20.00 annual
8
50.00 per cleaning
250.00 each
500.00 each
75,000.00 each
w/shelter
50.00 per pit
8
6
250.00 per pumping 4
10.00 per cleaning 364 100.00 monthly
29.00 per mow/acre
94
26.00 per mow/acre
41
25.00 per cleaning
0
130.00 per mile
2
20.00 per cleaning
104
5.00 per cleaning
60
90.00 per app/acre
14
2.00 per acre
747
5.00 per cleaning
96
0
40,092.00 Annual cost
65.00 section 350.00 section
100.00 each 4.70 sq foot
2.50 per foot
2.50 per foot
40.00
40.00
200.00 each
40.00
60.00
4.70 sq foot
Cost
18,732.00
2,970.00
86,810.00
600.00
900.75
2,016.00
2,150.00
29,840.00
100.00
20.00
652.50
50.00
542.08
1,188.00
440.00
380.00
3,600.00
2,110.00
50,250.60
200.00
108.00
192.00
15,201.80
14,999.40
338.00
2,080.00
4,531.50
22,104.00
29,296.20
120.00
40,092.00
332,614.83
Meadowmere Park — The Feasibility Study called for RV camping, boat rentals, a
swimming beach, fishing pier, meeting facility, concession building and a tower swing.
One of the keys to the uses in the Carter -Burgess plan was the ability to rent boats to
individuals on a hourly basis. That portion of the plan is still unresolved due to the Corps
of Engineers' study on the lake's capacity. Adding more boats from a rental facility may
be tied back to eliminating parking spaces at existing boat ramps and/or leasing docks
from Marina's International. While recreational uses such as boat rentals are great
amenities for the lake properties, the cost of mitigation through acquiring existing slips
from Marinas International or closing parking spaces at boat ramps is not justified.
The proposed plan is an immediate use of the existing facilities with minimal capital
expenditures. The proposal is to allow dry RV camping in the open area on the existing
parking lot as well as primitive camping north of the restroom/shower facility. Additional
signs, a sanitary dump station and a new restroom/shower facility are programmed. The
total capital costs are $140,800. Annual revenues are projected at $41,850 with annual
operating costs of $2,143. For revenues, we project a 180 day season for both the 20
dry RV sites and 25 tent camping sites. The RV charge is $13 per night with occupancy
rates of 45%. The tent camping site model anticipates an $11 per night fee and 35%
occupancy.
The current operations at Meadowmere Park are not self-sustaining. Operations and
maintenance costs project out to $38,288 annually against revenues of $26,130. When
debt service and operation and maintenance costs are put into the model, as well the
revenues from the new camping sites in the park, Meadowmere becomes self-
sustaining.
The balance of Meadowmere Park was already under the City's operating budget and is
not included in the larger budget for the lake parks for that reason.
May 14, 2004 (8:OOAM)
}
Meado ere
0
Regular
Regular
Maintenace
Unit
Annual
Operating
Unit
Annual Minor
Unit
Major
Unit
Replacement
Unit
Meadowmere
Count
Cost
Type
Frequency
Costs
Type
Frequency Repair
Type
Repair
Type
Cost
Type
Cost
Paved Roadway (miles)
1.3
1,500
per mile
1
-
5.50
linear foot
5.50
If
2,676.00
Picnic Tables (steel)
0
w/shelter
450.00
each
29250
Picnic Tables (concrete)
13
w/shelter
Picnic Table Shelters
13
5.00
per cleaning
57
50.00
3,705.00
Drinking Fountains
1
1,500.00
150.00
Elevated Cookers
13
w/shelter
75.00
97.50
Security Lights
7
10.50
monthly
12
882.00
Playgrounds w/Equipment
1
150.00
each
1,000.00
each
350.00
Vault Toilets (Restrooms)
1
15.00
per cleaning
57
250.00
per pumping
12 100.00
each
500.00
each
75,000.00
each
3,965.00
Volleyball Courts (sand)
0
50.00
annual
1
-
Basketball Goals
0
20.00
annual
1
-
Group Pavilion
0
50.00
per cleaning
250.00
each
500.00
each
75,000.00
each
Pavilion Tables (steel)
0
w/shelter
450.00
each
-
Horseshoe Pit
0
50.00
per pit
1
Boat Ramps
1
cleaning Witter
Courtesy Docks
1
cleaning w/litter
Pipe Rail Fencing (mile)
2.3
65.00
section
350.00
section
2.50
per foot
161.92
Guard Post/Cable (mile)
0.5
2.50
per foot
330.00
Signs (traffic)
16
40.00
64.00
Signs (parks)
12
40.00
48.00
Fishing Dock
0
Sanitary Dump Stations
0
Laundry Building
0
10.00
per cleaning
91
100.00
monthly
Electricity (less DD Ught)
3,841.08
Honor vault (pay station)
1
200.00
each
20.00
Lantern Hangers
0
40.00
-
Fire Rings
0
60.00
-
Totai Acres
19.5
Facility Acres
7.9
29.00
per mow/acre
10
2,291.00
Open Field Acres
11.6
26.00
per mow/acre
7
2,111.20
Cabins
0
25.00
per cleaning
-
Paved Trail (miles)
1
130.00
per mile
130.00
Small Pavilion
0
20.00
per cleaning
-
RV Pad
0
5.00
per cleaning
12
100.00
each
4.70
sq foot
4.70
sq foot
-
Chemicals
19.5
90.00
per app/acre
2
3,510.00
Utter Pick-up
19.5
2.00
per acre
57
2,223.00
Fish Cleaning Station
0
5.00
per cleaning
-
Gate Attendants
11,440.00
Annual cost
11,440.00
TOTAL FOR PARK
38.28820
0
Meadowr amping
Regular Regular
Maintenace Unit Annual Operating Unit Annual Minor Unit Major
Unit Replacement Unit
Maintenance
Capital
Meadowmere Camping
Count
Cost Type Frequency Costs Type Frequency Repair Type Repair
Type Cost Type
Cost
Cost
Paved Roadway (miles)
0
-
Picnic Tables (steel)
0
Picnic Tables (concrete)
0
Picnic Table Shelters
0
Drinking Fountains
0
Elevated Cookers
0
Security Lights
0
Playgrounds w/Equipment
0
Restroom (new)
0
130,000.00
Volleyball Courts (sand)
0
Basketball Goals
0
Group Pavilion
0
Pavilion Tables (steel)
0
-
Horseshoe Pit
0
Boat Ramps
0
Courtesy Docks
0
Pipe Rail Fencing (mile)
0
Guard Post/Cable (mile)
0
-
Signs (traffic)
10
40.00
40.00
400.00
Signs (parks)
10
40.00
40.00
400.00
Fishing Dock
0
Sanitary Dump Stations
1
450.00 per pumping 4
1,800.00
10,000.00
Laundry Building
0
-
Electricity (less DD Light)
Honor vault (pay station)
0
-
Lantern Hangers
0
-
Fire Rings
0
-
-
Total Acres (existing)
0
Facility Acres
0
-
Open Field Acres
0
-
Cabins
0
-
Paved Trail (miles)
0
-
Small Pavilion
0
-
_
Primitive Camping
25
RV Sites (existing parking)
25
Chemicals
0
_
Litter Pick-up
0
_
Police Impact (SL calls mo)
0.59
37.17 cost of one hr 12 months
263.16
Electrical Service
Gate Attendants
TOTAL FOR PARK
2,143.16
140,800
Camping Revenues
25 dry RV camping sites, 180 day season, 45% occupancy, $13 a day
38,385.00
30 primitive camping sites, 180 day season, 35% occupancy, $11 a day
Debt Service
11,686.40
Net before Debt Svc
36,241.84
Net after Debt Svc
24,555.44
Lakeview Park — The Feasibility Study for this site included an exhibition pavilion, art trail
and view sheds for bird watching. Furthermore, the study recommended that the facility
be a joint partnership with a non-profit entity. The budget for the site included $340,000
in capital costs and anticipated $75,800 in concession revenues above the current
revenues generated by the day use facility and boat ramps.
Because of the long lead time and complexity involved in the development of the facility
as well as the tenuous nature of the concession revenues, the proposal for Lakeview
Park does not include the development of the components in the Feasibility Study. The
five-year plan does anticipate the construction of a sewered restroom in year five. The
operating revenues from Lakeview Park are not self-sustaining, however, there are
revenues of $6,971 from the boat ramp which equals 28.7% of the operations and
maintenance costs of the park.
May 13, 2004 (3:57PM)
- C
CY)
0 co
t, co (D v
CL G� to R, n phj
C14 C14
L) LY L) u
8 8
m m m m
a) 4) (1)
4) (D
cx CL
ca
(1)
vCD
0
o0 (D000 0 C) CD
)no 0 a 0o
0000
in tq q q
000
E
Q) 0
too ui 6 00
In fl- C. CD to
CN C14 0 a
v v
000
C> q
er
u 0
Ct C� v
m L)
LO W
5
0
m tu m
L)
C, cc a
U� q R q
C)
1-
0 cz
CL
a)
LO C) C. 0
C, C> C�
C>
U')
ct U.) U')
5
(D
m
C) O C, a
R R q q
0
q
0
q
r 0.
(D
.
C> 0 C.
in LO to
-
LO
C>
C14 cli
ca
=3 CD
C
<
LL
cm
CL
E
CL
0
�E C.
E
cm
CD C,
U� q
0
0
C) C)
r V)
a)
CC 0C�L 0
CN
:"
U
co CO —
-W
r- AC14 N 04
0
N
rcr
< P
U -
0)c
tm cn
0-
C
0 1p ca CU c m
G G
c 0 c C a
E = u 0 M :3 U CL
.2
EEZEZZ ca cu u E
0 W U)
m 3 CL 3
caro m CL C.
C.
C.M.C.C.Q. m 0. CL 0. CL
u
m
0 C> C> 0 a 0 0
C) R q R R q q
Lq
0
0 0 0 0 0 0 Cl 0 0 O.
0000000000
U') LOU0 0 C)
oi (6 L6 C5 6 ANN C� ui C;
O
U'j CN LO LO
CN N N C13 N C) m
r r r
ci
6
of
ui of
E
.2L m 40)
E E
c
c
cm
Lu 0)
41 -b ,
0C.0
(D
- W to
0 cn a 0 0 0
'O m0 "R 7. o
J4 2M
8 u -,3' -,,�
0 Z,-,
C -C 0 m
- E :2 c
CL CM
CL
m U. :n,s2== >g
M M E
IE i�
>, o
:3 m
C) M x
c
m
'a)
0
C2
0
m CD
> E C
�i
U. #A CL
-8
LL
v 7E
c -- CL E C
> 9
ro.'c road
CL CL. CL Of
-M
'i
k
CLOO(n
L ti) -9 -9 _
L ou 0 c5e.
Horseshoe Trails Park — While this park was included in the Feasibility Study, it was
already a part of our park system as we held a license for the trail. The Study did not
recommend any changes to the park and none are anticipated in the five-year plan.
Because it was already existent as a part of our parks system, it is not included in our
budget considerations.
May 13, 2004 (3:57PM)
McPherson Slouqh — The final Feasibility Study for this property included a fishing pier
and boat ramp courtesy dock with a total capital cost of $75,000. The improvements are
not included in the five-year plan, however, upgrading the restrooms is anticipated in the
second year of the longer term look beyond the five-year plan. McPherson Slough is not
self-supporting, but the revenues from the park do offset 43% of the operations and
maintenance costs.
May 13, 2004 (3:57PM)
88 888888
0) c;
'9
. (q 9
Cq eq IV C4 (d
0
E
0
O
C,
O
T CO
't r- 04 m
rl
�
b
M rn E E
u U, STc Or, Im
.c
co 'm tm 0)
"a -6
c
va
3. M CU CL M 0
.2 R S S
u = = ar- C
0
0 - S? --p 2 R a. S? •
E E u a u u m m u E
a a u= , m m
I - I I L- I I �
c c w (D 4) .(D
no
CL
(D
-
0 0 0 0 0 0 0 0 0 0
m w CL CL
CL
a CL CL CL a C6 m CL a CL
08 0 C) 0
q q q C� q
C)
q
0 0 a 0 0 C) 0 0 C) C�
C!qRqqqqqqq
ai cr
0
—
0 C)
0 CD
0
a a
0 C, 0 0
w
Ui 9
00
00
to Iq 00
000 r
Eto
0
a to
CO a
04 N C) 0
c, o o
v
U0 0
in
c, t--
a Lo
ct -T
to
U
to
to
—8
5
0
u
a
CD cn,
CD
CD
O.
to
R q
R
rl�
m
0.
ui
0 CD
a
v
CD
c, 0
CL to
C)
U)
tCDo
M'.
D
ca m
m
cu
C)
O
cCL
0
C> a
C.
LO
C>
U')
LO
to
cq
to
cq
N
ca
=1
C
C CT<
U-.
0
E
0
O
C,
O
T CO
't r- 04 m
rl
�
b
M rn E E
u U, STc Or, Im
.c
co 'm tm 0)
"a -6
c
va
3. M CU CL M 0
.2 R S S
u = = ar- C
0
0 - S? --p 2 R a. S? •
E E u a u u m m u E
a a u= , m m
I - I I L- I I �
c c w (D 4) .(D
no
CL
-
0 0 0 0 0 0 0 0 0 0
m w CL CL
CL
a CL CL CL a C6 m CL a CL
08 0 C) 0
q q q C� q
C)
q
0 0 a 0 0 C) 0 0 C) C�
C!qRqqqqqqq
LO 0 0 C. 0
LO N LO U')
0
—
0) to to C� CD V) CD N W) CD
N 04 CN Cl C14 C) m
Na 0 to IT N (D to
E E
8 am E E .2 :n
E ru o
cri L, L.0 0 0
U) tA OQ)
0 o 0 S o .0 =
C -X le L, M m 'o
us -, (D Z:3 c co
.9 - U ,4 E (OD - <
O OE- LL 0 M s? o
.0 LL :3 W
c � , :2
M m m m 0 m LL
03 9 OL
ca E�
U
CL� Cc CL (D 0) (n 01 3 -9 P- 2 0 0- t L U)
CL a. � OL R
Oak Grove Park (Sand Bass Point) — The Feasibility Study recommended upgrading the
Trawick Pavilion and building another large pavilion on the site. Also recommended was
a restroom/concession building. The capital improvement costs totaled $400,000 with
additional City and concession revenues of $49,750.
The proposed five-year plan calls for upgrading the existing restroom in year two, paid
for out of operating revenues from the entire lake parks system. The current restroom is
between the baseball fields and Trawick Pavilion. While it is not a vault toilet, it is also
not up to the standards we try to maintain in our parks nor does it meet ADA
requirements. The existence of plumbing to the site reduces the capital costs to
approximately $75,000.
The Sand Bass portion of Oak Grove Park is self-sustaining with revenues over
expenditures even after the debt service for the restroom renovation is taken into
account. The multiple boat ramps and Trawick Pavilion are the revenue sources for the
park.
The balance of Oak Grove Park has been under lease to the City for many years and is
an integral part of our parks system. Since it is already included in our annual budget for
the Parks Department, it is not included in the budget for the lake parks system.
May 13, 2004 (3:57PM)
O O O 0 0 0 0 0 0 O O
OO O 000000 LC)O
N O O O N O
1--000 r0
OO O O
OO 00
O
;gym.,..,•
O
(0,2O OW O'0OO NO
N(D 6) t- O O Id) N R LO
cD <L•(Og V O
N (D r co <t 7
64ON
co N (D O r
ty
r
U
hM n co ND V
rNr N
0 0 (C) 1-t
W
Cl) It N
N LD tD to
M
Cl)
c 1
~
C L L L
—0-0
0
_ ca a`6) ami ami
a a t4
N
N
NO
O O O O O
LOO O O 00
O O O O O O O
Ln Ln 00 000
0
Ems,
Loo) LO O Otj
C C
NCV 00 000
V' �Y V• (D
U O V
d•
N
.90
LO Lf)
cx
N r
v
ry
O
•� n
C
U
O
w
LO .ro
tM O O O
p
O
h
LO
O O O
LL
Q
C Ln Ln
M
N
'C
L L L
C
O
>,
�-
@ co (U6
U
U
N N N
(U!)
O
p•co
00 O
p
O
O
'`
tM Ln O LO
LO
O
O
N
—V
r r
(0 C
O N
C O
O
Q N
LL
c
w
O
rr U
i
N
E 3
E
rn
O o
C
�cN
Ln o
0
0 0
0
0 o
o
U
r
O
Vr
co Mrr
CO ^ r
O
NM
t6 C
:3Q)
n N
C=$C
O'
d
LL
O O) 01
G)
0 m
m
CL
- C
(D(UO
co
C
U C)
C
Ncu cc
0: u='a
v
E E v v rom
N d C C N
a 3 3 n 3 n m m a 3 Q
tU
E E
N N N N N d N N N N
n
n. n n. a. n. n n n n. n
NO
N
O OC) O O 0
0 O O O O O O
O
O
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
LO C)
M
NNLO
NSU
r NM
NMCli a) co
C
NCD 'IT MN CO Or r r—Nr NN
WQh NN000 NOOr-
tnN r.n
r r r
r 0
Cl) co
U
C
? d N p• C
:EZUN y w
LM.O
°
EE -)ro
o
c0 e
rn
>, w W to N
O p T`
R a _q-N (a
rn R
to
d
0
100 m CD m :03°o �N 0(D °—°'ao (D
o v� �_ N � E ° a) o �)
�Q E o nm
d
OO L .a .fl U J C > O N 0-0
N (0 (If -O E@ t6 III N O E
L L N O p CO V O N N
>, O (` L4 p
N U (t6 > N C N
N
0
O
OO
�. O O
E- F-•' i•- C N O O .O .� CL C N t4
.- .�' N= O
N t6 d ..«.. �' aT >`, �. • V >
d N c0 U LO
U LL I- d 'O U ' N E
Y
O O) 0 Y O N
C C C �'
_C
'D Of 'a N N C .LQ. 'O v p d
d C .0
¢ C C a U N
d
N
> C> U N— N O> q1
O D U U •C N N N O t0 > O O
7 N C L U C C N
O fl• O� ✓T N N N� O f4 2
R U LU d> LO N tU L=
O o LZ t4 > E> v_) f`
F-
0
6. d n. dp W (n a.w co (D d S co
CO) d(D()(n U-U)J Lu To- Il
F- LL 0Ua cr)x (J ---)-j 'LL
0
Acorn Woods — The Feasibility Study called for the rehabilitation of the restrooms at this
site. The proposed five-year plan does not include this project in the first five years, but
the restroom is included in the fourth year in the look at the four years following the five-
year plan. The site will need to be watched closely following the opening of Dove Loop
to determine the traffic and use patterns. While seldom used before the extension of
Dove Loop, this pattern may change with Acorn Woods enjoying closer access to the
new road. There are no revenues associated with the operations of Acorn Woods.
May 13, 2004 (3:57PM)
8s 0 ry , og g 8888 twp 'r 8 8-,
.p h 7 K O O � rte• U7 N N ,(J fry. � � to .N•
fJ M N t CCCVVV r r i� t"i N sY
LV M M
r
r
<tr NNcco
Y Y
N m
ro C C C 0 CI
33mmmmaEm0
0 o d o u m:-
E E.2 E 2ro ? ro ro U E
dQ%mOmQim
naaaanaanfl.
0000000000
00o000o0oo
N NNcoNNNN�c+O>
r Y
rOrYrrO0Y0000000 Nrc010000 0004MCDO c0 CD CD
r r Y O O r r O r Y
y w E t:E10a°� c rn0
N^� ` 0 m � •� O a C
E (D o• aa :? E D H 0 Y
8s'S n�i ��C H H y E --o N 0� �^� m I'
�caee; y.. Uro a._ymny L
'" tiy�y gcy� O sp=y yjua Ev i..crn �� Ep CL N a
Q�a nU'� arc s ro au y4c Qmy� ro y c :_ y �•E y O
3 a tro ►1° F% 0 $ . flro o F- E 'h - 00 u° g 4�,; `d� �E ro 'c_f m u
ro am Wit` m .' 0 E� c mea
>•�•�,� �; Lcc1-
aaan u� »c�n�xg acv kMto� x�tit°�i cin cn v tip
2 2
C
R
C T
L
E
L
L L
cco
O.
O
y O
a a
a
a E
w
O
aroi
aroi af°i
CD
cn
O O
O
O
O
O O
0 0 0 0
c o o
p
y
4i
O
O
0
LO IO 00
opo
(,
E
Ln �O
C =3
G a
n
b
OIOO
NNvvO
0 C5 C5
O
d•
C
C v
0 v to
N
C
mto
C
Ci
C
cc •c4 v •C
ro
LO
_ _
d�
ti
ti
o.33a
IU
aroron3a a
m„
a
o0aa 0 0
C y
to LO
�
NtOO N Or
Q
r
.-IOO
U
CD
O
C T
O
O
~
cu
�.-
C
cUV co
/U9
0
CT
=
0 O
Q
(n
y
LQ
o
a .m
W
0
Ln0
0CR
LLO
0
0
O
OO
0
Qui
O IO
IO
M
a
r
• y
C
C1
=
_O
U
U
H
cu m
N
y
to
d 0
d
O
CD
0
O
O
C
O
o
O
CLO
a0
O
O
CD
Lc
N
co
p
Y
(D C
7 tU
C �
c a
Q
U-
<tr NNcco
Y Y
N m
ro C C C 0 CI
33mmmmaEm0
0 o d o u m:-
E E.2 E 2ro ? ro ro U E
dQ%mOmQim
naaaanaanfl.
0000000000
00o000o0oo
N NNcoNNNN�c+O>
r Y
rOrYrrO0Y0000000 Nrc010000 0004MCDO c0 CD CD
r r Y O O r r O r Y
y w E t:E10a°� c rn0
N^� ` 0 m � •� O a C
E (D o• aa :? E D H 0 Y
8s'S n�i ��C H H y E --o N 0� �^� m I'
�caee; y.. Uro a._ymny L
'" tiy�y gcy� O sp=y yjua Ev i..crn �� Ep CL N a
Q�a nU'� arc s ro au y4c Qmy� ro y c :_ y �•E y O
3 a tro ►1° F% 0 $ . flro o F- E 'h - 00 u° g 4�,; `d� �E ro 'c_f m u
ro am Wit` m .' 0 E� c mea
>•�•�,� �; Lcc1-
aaan u� »c�n�xg acv kMto� x�tit°�i cin cn v tip
C
C
C CL
E
T
O.
O
y O
E
a E
O
O
O p
t4 w y
UO
O O
O
0 O
O� p
N
CLO
O
Y
cD
m
� 0
C =3
G a
Q
LL
C
C Tco
C
Ci
C
cc •c4 v •C
ro
_ _
N y
o.33a
3
aroron3a a
m„
a
o0aa 0 0
C y
to LO
�
NtOO N Or
Q7
r
.-IOO
U
� m
<tr NNcco
Y Y
N m
ro C C C 0 CI
33mmmmaEm0
0 o d o u m:-
E E.2 E 2ro ? ro ro U E
dQ%mOmQim
naaaanaanfl.
0000000000
00o000o0oo
N NNcoNNNN�c+O>
r Y
rOrYrrO0Y0000000 Nrc010000 0004MCDO c0 CD CD
r r Y O O r r O r Y
y w E t:E10a°� c rn0
N^� ` 0 m � •� O a C
E (D o• aa :? E D H 0 Y
8s'S n�i ��C H H y E --o N 0� �^� m I'
�caee; y.. Uro a._ymny L
'" tiy�y gcy� O sp=y yjua Ev i..crn �� Ep CL N a
Q�a nU'� arc s ro au y4c Qmy� ro y c :_ y �•E y O
3 a tro ►1° F% 0 $ . flro o F- E 'h - 00 u° g 4�,; `d� �E ro 'c_f m u
ro am Wit` m .' 0 E� c mea
>•�•�,� �; Lcc1-
aaan u� »c�n�xg acv kMto� x�tit°�i cin cn v tip
., Silver Lake Campground — The Feasibility Study called for ten cabin sites, ten combo
RWcourtesy dock sites, upgrading the electrical service, new restrooms, a camp store,
swimming beach, playground upgrades, new pavilion and other improvements totaling
$1,350,000. Many of these recommendations are included in the proposed five-year.
The most pressing need is the upgrade from 30 amp to 50 amp electrical service and is
in the plan. The proposed plan also includes the addition of the five cabins, a net
addition of 13 RV pads with the conversion of ten to combo RV sites, a small pavilion
and new restrooms. The proposed capital cost is $757,162 with additional operating
costs of $65,547. These costs are offset by $189,931 in new revenues. The net
revenues, after debt service and operating costs are taken out, are $124,384.
The revenue calculations for the cabins assume each cabin will rent for $80 a night with
an annual occupancy rate of 40%. The season for the cabins is assumed to be year
round. The ten combo RV pads are expected to rent for $30 a night with a year round
occupancy rate of 63%. Because the combo sites are part of an existing recreational
use at the lake, we expect the ability to secure permission for these courtesy docks to be
greatly improved in comparison to the boat rental issues at Meadowmere. For the rest
of the park, the upgraded electrical service is projected to allow a $4 a night increase in
rates to $20 a night. No anticipated changes are expected to the current occupancy rate
of 63% for the balance of the park.
Silver Lake is self sufficient and its revenues in excess of expenses provide the City with
the majority of the funds necessary to subsidize the rest of the parks in the lake system.
Because of the size of the return on this investment, the improvements at Silver Lake
are the top priority in the five-year plan.
May 13, 2004 (3:57PM)
_ l8�i 88�N388p8O8 p$ f�$88 88Hp8c8p8 �� S�i$�8 8�
� yj {.�.�- B8tu. WN'f to �A � t0 to U�fD� 8�a�ONO� �p}c.�gy � � �pj �•r'}�eyh .l'�}�N} �., CV
Ili
vOOOOQQOQO 00 QOcoMQooQo QQ�••e0e}• -,:fa QOcoco0
r MNONMNrNr r -LO NNQOIN�rNr x117 fDMMtO 1:
C'ir
C N
a E C Q1 N t C
D s a Y
t 4) c o d o N m0 n d m m N r a
cn c a m
o m0. �_� ro� g n ti oar �s y�yi >o� H �'c O
in
(L (L >>mo m acain14l 9 -ii�6- U. oci �a Luz) c��
m
c ro m
v
o d m
N
o SS
S SSS$
S$8
E
`li gn
COD
NNvCD
N
v
ti
a
a�
0.
C
o
S
C
cuco m
y
C7
N
Ui
O O O
p
N
to
O O O
Lo
Q
c to Ui
co
D>
C T
L L
C
_
_
F
m m com
c
d 0 d
a)
cc
p cc
O
O
O O O
00 O •O
O
p
p
CL
tOA
Up70 N
00
m C
7 N
C 7
C tT
d �
m
d
C
a
N
p
J
m
c
m
E Q.
E
y do
m
N
t
O o
O
o
o#
c
O
_C
E o
O O
o
p
o
c �
m
a U
NN
( c
D9
y N
U
r NO
O r r r
V m
n ON O N
N
M
r N
C
C C:
d m
U.
3 3
3
EE
Emm
m
m m 3 3
c`oico`i�, 0cm m
c
d
C
c
°> ci °"° ai
c c
`° °i, c c
3 •.
•�
E ni
m ai . v
3 3 m m m fl m
= F-
N d C N
E,=n��
N ai N Q7
m 3 ai
ca d
O O ai N 0 a V )
EE0EvTiromu
0 3 3 a 3
�cc`�Larcacm�n'U
o �5 3'a v
v a.n.
man°'n
cco cca
no o o an
0 0
ooSS o
00
0 00000 0
o$00000Nm
7 C N
•-� LO
�U')N U) LO[)
pp
to Or
NNNMN�0)
gi c U
v
'R
m
vOOOOQQOQO 00 QOcoMQooQo QQ�••e0e}• -,:fa QOcoco0
r MNONMNrNr r -LO NNQOIN�rNr x117 fDMMtO 1:
C'ir
C N
a E C Q1 N t C
D s a Y
t 4) c o d o N m0 n d m m N r a
cn c a m
o m0. �_� ro� g n ti oar �s y�yi >o� H �'c O
in
(L (L >>mo m acain14l 9 -ii�6- U. oci �a Luz) c��
00 0 0
0 0 O o
0 0o 00
O 0
o O o 0 0
LO
o.0
o0 0 0
0 00 cNvm
0 om 0 N
CO
v
a
ca o
U U
o O
o ro L6 oO
tD o0 � o
C oro C
0 o ri
N
M N
O O O 0 0 0
00 O 000 r r
N00 O 00
Ci 00 "l:00
O O O 0000 co co
Oc00 000 N-7 (0
0
N
N
OED O C1400
(D r 00 co r (O -It
r W0 00'IT 'M r M r (O
O
U
r "OV O N N h
UO V <7• -t CO (U
ON O ca 0 00 m(0 O
N (ry
m
It 0
M
r W d•
c- .- N .- eF
<2 (0
O
N (
N
C a
L LL L
O O
+a0 �O
O
p T
U U U U
L
`m p
O
U
@ @ ca
@ m aI
a`I
a a a@i
y
o
00 0 0 00
UOO O O oo
0000 0 0 0
Ino O o00
0 0 0
o or
(>
(00 O O 00
OO Up
o
O O dt
OOU
m
aI p
OUC0
Iq C OV
O O
O N
U
CL
@
(0 o (n
o r�
Cl)C0
a m
Z z
6
aI
o
c
o
p
U
-
C a) Q1 m
N
O -
N
cc
(O O O O
O
N
• Q
(O O OO
O
t`
O (00 (NO
Cl)
N
a
C
p
Z) F
cUD m N
U
L
U
N N a)
N
N
C.n
O 00 O
O 0 0 O
O
o
O
0
0
U
0 O O O
4) T O l0
to
(0
0
O
N
V
r
c
C
O
N C
C Q)
C �
�
Q N
LL
J
N;Q
>
L
_
p
@
O
C
O
m
0 C
O
T
C CTI
f6
tN
uuaau
n
OUO
O
oO
oE M o
o O O
Ua-
ca
NO O_��-
Thi V'NNN V' T
O O- N
co TV'
t0'O
m
N M
N
9
C O
(9 m O
Q
M
LL
O O
�I CO
N Vi H}
O) O O)
C C C
m
U U Q) m N p) •C
N 'N
@
'C •C •C
G C C C a)
@ @ .CC •C N C
r0
_
O N
=F-
a � aI o m m@ aI
Ln ti v c c
° o 0 0 o a p �: o
E E v E v@@ SIE
o E E
p
N
3 0. 3 am m a3
N
a) Q)a3 a) @ a) a) m @ a)
a 0
aaaaanaaaacNl
0
O
00�
U
O 0 0000
0000000oaot-
OONO000Noo.-•
r(NU
LO
NNN �N(O0N(O �M
N CU
(n.o 0 0 0 o
w o 0 0 o
m (n m o N o m N m
N r cV , , , r , r
r 0 O O
ro ro
0 v D n o o o
_ C
o E
aI c m o
O
N
N
o
r. a m aI
Ea�o� n 5
.E o •-
m°
c
° `�
c
>
cr
L7J
'
L @ O
U) -0 Cc:CL
-101,5° c
d3
N N f�N N
o Ep oCU
w
@ 0-0
0
_u°
a
mmmmmaO�
m
a a nC @
w .
>2
LL
vo
p ( E BD
•QUp`csm-08Q
@- p°
G C C C_
d O
Cl)
U •C
@ (D @ O
�@ oCa
@
'LL
a@F
O p>7U) O
.6 d
CEFn. pw(na�>maxm
9
UO. Unn0 W SJil.
LL0Ua0 In
CL -
d Qa>
„ Katies Woods Park — The Feasibility Study called for upgrading the existing facilities at
Katies Woods and expanding the parking. The cost of the improvements was $375,000
against no new revenues.
The proposed five-year plan calls for replacing the existing vault restrooms with flush
toilets in year one. The restrooms at Katies Woods represent the single most frequent
complaint that staff has received for all of the parks in the newly leased areas. The cost
of the restroom is estimated at $100,000 and it is recommended that this improvement
be included in the package that includes Silver Lake Campground and Meadowmere.
Overall, Katies Woods is self sufficient based upon the strength of boat ramp fees. The
fees are sufficient to support the initial debt service for the restroom improvements.
May 13, 2004 (3:57PM)
AV
$888 CO
CO LO
O
Lo r
N C4
r -
L)
O C) 0
E E 'U E -6 -0 ca ca u E
0. CL CL CL M CL CL M M CL
0000000000 ,
Oqq0qqQOQO
M 6 6 6 6 6 6 N6 6
C-4 N N Cl) CN (n M
NCONCO'lt r NN
6 C5 N 6 vi cli (6 td
E E
W IM c 0
0 :D = c
M
cu 's 0 t 0, 12 (D U) CD a) C4
a) t! r 0 - W q.
r- M 0 0 CD :t� CO M -E 6 CL
ol 2 w g 8 (9 :E c 0 — — E 0-0 < C� C'M
25 o :5 z 25 = >g§ d! I'E � � = 0 — c 't;� w
M M a M
E o
g's; ) '120) LL
CL �.L —
CL L)
cr c E
(D c C
m M C
OL 0 CL 0)
> c To C
�2 C'L rL C, a. a CaL >-d mm (D am I U)
2 2
cc
m m
0) cu
tSto
4)
a) a)
M CL
CD
C�
C)
0 0
C) s C) C)
C�
0 .
U') C� q
0
q q R
C)
cNi C� c, a
C� 0 0
C)
C) In
0 IT to
O
Cv
CN
to
It')
r-
.0
0 0
ca ca
L)
m
L)
a)
0 4)
4)
CD CD
a
C)
CR
rl-�
CD C)
C) 0
Ul
CL LO
LO
Cl)
O
m to
4) a)
tu
03
a)
U)
0cu
CD 0
0
CD c
CD
CR R
q
. q
q
C� 0
C)
40
C)
Lo
U')
to
0
CN
O
Lo r
N C4
r -
L)
O C) 0
E E 'U E -6 -0 ca ca u E
0. CL CL CL M CL CL M M CL
0000000000 ,
Oqq0qqQOQO
M 6 6 6 6 6 6 N6 6
C-4 N N Cl) CN (n M
NCONCO'lt r NN
6 C5 N 6 vi cli (6 td
E E
W IM c 0
0 :D = c
M
cu 's 0 t 0, 12 (D U) CD a) C4
a) t! r 0 - W q.
r- M 0 0 CD :t� CO M -E 6 CL
ol 2 w g 8 (9 :E c 0 — — E 0-0 < C� C'M
25 o :5 z 25 = >g§ d! I'E � � = 0 — c 't;� w
M M a M
E o
g's; ) '120) LL
CL �.L —
CL L)
cr c E
(D c C
m M C
OL 0 CL 0)
> c To C
�2 C'L rL C, a. a CaL >-d mm (D am I U)
Fairway Drive — The property on either side of Fairway Drive, fronting Highway 26, is
strategically located between the Gaylord Texan and Grapevine Mills Mall. While the
budget does not anticipate any revenues at this time from the property, there are several
sub -lease possibilities that the City can pursue. In the last year two individuals
interested in building indoor soccer facilities surrounded by additional soccer fields have
approached us about this site. Another group has approached us about the use of the
site for a similar facility, only the sport involved is basketball. There has also been
interest from a groups that would like to build a white water rafting facility on the site.
Staff has also visited with the operators of a putting facility, not miniature golf, but a
putting school type of development that could potentially locate on this site. In short,
there are many recreational uses that could be developed on this site that could further
support the lake parks system through sub -lease revenues. The proposed five-year
plan includes this site as a potential recreational use built by others. It is staff's
recommendation that this area be considered for recreational development through an
RFP process.
May 13, 2004 (3.57PM)
. Rockledge Park — Rockledge is included in the Feasibility Study as a site not leased
from the Corps of Engineers. There is no change in that status to report and the site is
not included in the five-year plan.
May 13, 2004 (3:57PM)
Five -Year Development Plan
Lake Grapevine Corps of Engineers Property
City of Grapevine Lease
2004-2005
PRELIMINARY
Meadowmere Park
• Replace existing restroom and shower facility adjacent to recreation area with
upgraded facility. The current facility is a vault toilet, the plan would call for a
restroom and shower facility that is tied in to the sanitary sewer system. The
new facility would comply with the Americans with Disabilities Act.
• Designate 25 sites to the north and east of the current restroom and shower
facility as primitive camping sites.
• Designate 20 sites in the parking lot for dry RV camping.
• Installation of a sanitary dump station for the dry RV camping sites. The
sanitary dump station would be tied in to the sanitary sewer system.
Lakeview Park
No changes planned for this area.
Horseshoe Trail
No changes planned for this area.
McPherson Slough
No changes planned for this area.
Sand Bass Point (Oak Grove)
No changes planned for this area.
Acorn Woods
No changes planned for this area.
... 011P2004-2005 Five -Year Development Plan PRELIMINARY
Page 2
Silver Lake Camp rgound
• Upgrade existing 30 amp electrical service to 50 amp electrical service.
• Create five sites in the existing park for self-contained cabin units. Any
cabins in areas susceptible to high water disruptions will be capable of
moving from that site to a holding site out of the high water area within the
park. A picnic shelter, with table and elevated cooker, will accompany each
cabin site.
• Replace existing restroom and shower facility with one tied in to the sanitary
sewer system and in compliance with the Americans with Disabilities Act.
• Convert 10 RV sites to combination RV/courtesy dock sites.
• Create 13 new RV pad sites in the existing park. A picnic shelter, with table
and elevated cooker, will accompany each new pad site.
• Construct small reservation pavilion on the west side of the park.
Katies Woods Park
• Replace existing restroom facility with a facility that complies with the
Americans with Disabilities Act and ties into the sanitary sewer system.
Fairway Drive Area
• No specific plans have been developed for this site at this time, however, the
City is reserving the right to sub -lease the property to a private enterprise that
would construct a recreational use on the site.
, Five -Year Development Plan
Lake Grapevine Corps of Engineers Property
City of Grapevine Lease
2005-2006
PRELIMINARY
Meadowmere Park
No changes planned for this area.
Lakeview Park
No changes planned for this area.
Horseshoe Trail
No changes planned for this area.
McPherson Slough
No changes planned for this area.
Sand Bass Point (Oak Grove)
• Replace existing restroom facility south of Trawick Pavilion with a restroom
that complies with the Americans with Disabilities Act. The restroom may be
moved further north or east for better access from the pavilion. The ability to
tie the restroom into the sanitary sewer system with a gravity flow connection
will determine the final location.
Acorn Woods
No changes planned for this area.
Silver Lake Campground
No changes planned for this area.
2005-2006 Five -Year Development Plan PRELIMINARY
Page 2
Katies Woods Park
No changes planned for this area.
Fairwav Drive Area
• No specific plans have been developed for this site at this time, however, the
City is reserving the right to sub -lease the property to a private enterprise that
would construct a recreational use on the site.
Five -Year Development Plan
Lake Grapevine Corps of Engineers Property
City of Grapevine Lease
2006-2007
PRELIMINARY
Meadowmere Park
No changes planned for this area.
Lakeview Park
No changes planned for this area.
Horseshoe Trail
No changes planned for this area.
McPherson Slough
No changes planned for this area.
Sand Bass Point (Oak Grove)
No changes planned for this area.
Acorn Woods
No changes planned for this area.
Silver Lake Campqround
No changes planned for this area.
Katies Woods Park
No changes planned for this area.
2006-2007 Five -Year Development Plan PRELIMINARY
Page 2
Fairway Drive Area
No specific plans have been developed for this site at this time, however, the
City is reserving the right to sub -lease the property to a private enterprise that
would construct a recreational use on the site.
Five -Year Development Plan
Lake Grapevine Corps of Engineers Property
City of Grapevine Lease
2007-2008
PRELIMINARY
Meadowmere Park
No changes planned for this area.
Lakeview Park
No changes planned for this area.
Horseshoe Trail
No changes planned for this area.
McPherson Slough
No changes planned for this area.
Sand Bass Point (Oak Grove)
No changes planned for this area.
Acorn Woods
No changes planned for this area.
Silver Lake Campground
No changes planned for this area.
Katies Woods Park
No changes planned for this area.
2007-2008 Five -Year Development Plan PRELIMINARY
gar Page 2
Fairwav Drive Area
• No specific plans have been developed for this site at this time, however, the
City is reserving the right to sub -lease the property to a private enterprise that
would construct a recreational use on the site.
Five -Year Development Plan
Lake Grapevine Corps of Engineers Property
City of Grapevine Lease
2008-2009
PRELIMINARY
Meadowmere Park
No changes planned for this area.
Lakeview Park
• Replace existing restroom with one that complies with the Americans with
Disabilities Act and ties in to the sanitary sewer system.
Horseshoe Trail
No changes planned for this area.
McPherson Slough
No changes planned for this area.
Sand Bass Point (Oak Grove)
No changes planned for this area.
Acorn Woods
No changes planned for this area.
Silver Lake Camp qround
No changes planned for this area.
Katies Woods Park
No changes planned for this area.
2008-2009 Five -Year Development Plan PRELIMINARY
Page 2
Fairway Drive Area
• No specific plans have been developed for this site at this time, however, the
City is reserving the right to sub -lease the property to a private enterprise that
would construct a recreational use on the site.