Loading...
HomeMy WebLinkAboutItem 09 - Traffic Signal System RetimingITN i MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER/W/ MEETING DATE: MAY 18, 2004 SUBJECT: TRAFFIC SIGNAL SYSTEM RETIMING-CONSULTANT SERVICES CONTRACT AMENDMENT RECOMMENDATION: City Council consider amending the current Traffic Signal System Retiming services contract with Kimley-Horn and Associates, Inc. for additional work in an amount not to exceed $ 21,500, authorize staff to execute said contract, and take any necessary action. FUNDING SOURCE The traffic signal system re -timing contract is part of the Citywide Traffic Signal Improvements project and is funded by a Congestion Mitigation and Air Quality (CMAQ) federal grant. Funds are available in "TXDOT Signal Improvements -Professional Services" account (113-44540-415-4). BACKGROUND: The original Traffic Signal System Re -timing contract involved developing new signal timings for peak periods on all of the City's major arterials including Ball Street, Main Street, Northwest Highway, State Highway 26, State Highway 121 and William D. Tate Avenue. The contract amendment involves developing three signal timing plans (AM, Midday and PM Peak) for the following locations. • Bass Pro Drive (three signals) • State Highway 26 adjacent to the Grapevine Mills Mall (two signals) In addition, two special timing plans (midday and PM peak) for the weekend will be developed for the four signals adjacent to the Grapevine Mills Mall. The consultant will also be responsible for all data collection. A copy of the agreement detailing the additional scope of services is attached. Staff recommends approval. RC/rc 0:\agenda\05182004\Agmemo.Traffic Signal Retiming Consultant Contract Amendment.doc May 12, 2004 (3:16PM) 0 Kimley-Horn and Associates, Inc. February 16, 2004 Via Mail and Facsimile # 817-410-3003 Mr. Ramana Chinnakotla, P.E. City Traffic Engineer Public Works Department City of Grapevine P.O. Box 95104 Grapevine, Texas 76033 Re: Additional Services for Grapevine Citywide Signal Timing Project KHA No.: 061094002 Dear Mr. Chinnakotla: Kimley-Horn and Associates, Inc. (Consultant) is submitting this Letter Agreement to provide Additional Services related to the preparation and aimplementation of new coordinated signal timing plans as part of the citywide signal timing project in Grapevine, Texas. This Letter Agreement is in accordance with our discussions, and when counter -signed and returned to us, it will constitute an Amendment to our current contract dated May 30, 2003, and authorized July 2, 2003. Additional Services The additional services included under this agreement include the development and implementation of three (3) new coordinated signal timing plans for the following five (5) intersections, as part of the new coordinated signal timing along SH 26: • SH 26/Gridiron • SH 26/Grapevine Mills South • Bass Pro/Embassy Suites Driveway • Bass Pro/SH 121 NBFR • Bass Pro/SH 121 SBFR These coordinated timing plans will be tied into the recent timing implemented at the intersection of SH 26 and Bass Pro during the weekday AM, Midday, and PM peak periods. New turning movement counts will be performed at each of the above listed intersections for 1.5 hours during each peak period. ■ TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 a Suite 1100 801 Cherry Street, Unit 11 Fort Worth, Texas 76102.6803 Ell Kimley-Horn Mr. Ramana Chinnakotla, P.E., February 16, 2004, Page 2 and Associates, Inc. This agreement also includes the development and implementation of two (2) new coordinated signal timing plans for each of the intersections listed below, adjacent to Grapevine Mills Mall, during the Saturday and Sunday peak periods. New turning movement counts will also be performed at each intersection on both Saturday and Sunday from 11:00 am to 1:00 pm and from 4:00 pm to 6:00 pm. • SH 26/Gridiron • SH 26/Grapevine Mills South • FM 2499/Grapevine Mills North • FM 2499/Stars and Stripes If services beyond those defined in this scope are required, the Consultant will confer with the Client to receive further authorization before such additional services are performed. Task 1 — Data Collection Turning Movement Counts — The Consultant will obtain weekday AM, Midday, and PM turning movement counts for the five (5) intersections identified above for weekday timing plans, plus Saturday and Sunday peak counts for the four (4) intersections identified with weekend timing. Assemble Controller Interval Timing - Minimum green, passage, yellow, all -red, MAX I, MAX II, etc. will be provided by the Client to the Consultant. Existing yellow, all -red, "walk" and pedestrian clearances will also be provided by the Client and used by the Consultant. Verification of Hardware and Geometry - The Consultant will perform an in- field inventory of the signal hardware and intersection geometry at the above mentioned intersections. Condaict Field Observations - Prior to the development of new signal timing, the Consultant will conduct field observations at the above mentioned intersections during each peak period. Task 2 — Generate Timing Plans Using Synchro 5.0, the Consultant will generate new signal timing plans for the time periods indicated above, and using the same methods and procedures identified in the "Signal Timing Optimization" portion of the original letter agreement. Kimley Horn Mr. Ramana Chinnakotla, P.E., February 16, 2004, Page 3 and Associates, Inc. Deliverables All documentation for these Additional Services will be consistent with the deliverables identified in our original Letter Agreement. No additional travel time runs will be included with these Additional Services. Schedule The Consultant will complete Tasks 1 and 2 within four (4) weeks following receipt of a signed copy of this Letter Agreement, and receipt of the timing data identified in this agreement, exclusive of Client review time. Additional services, if desired, will be performed in a timely manner upon authorization by the Client. Fee and Billing The Consultant will perform these Additional Services in accordance with the terms outlined in our original Letter Agreement dated May 30, 2003. These Additional Services will be performed for an additional lump sum fee of $21,500, increasing the total lump sum fee from $94,500 to $116,000. The lump sum fee includes labor costs and direct expenses identified in this contract, as well as items such as in-house duplicating, blueprinting, facsimile, local mileage, telephone, postage, and computer expenses. Kimley-Horn Mr. Ramana Chinnakotla, P.E., February 16, 2004, Page 4 IM F-1 and Associates, Inc. Closure This letter when signed by both parties constitutes an Amendment to our original Letter Agreement, the terms and conditions of which will remain in full force and effect unless specifically revised in this Amendment. Please return an executed copy of this letter at your earliest convenience. We appreciate the opportunity to continue to provide engineering services to you and the City of Grapevine. Please contact us if you have any questions or need any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC, C. Brian Shamburger, P.E. Project Engineer/Project Manager G. Brad Tribble, P.E. Vice President Agreed to this day of , 2004. THE CITY OF GRAPEVINE, TEXAS A Municipality By: Official Seal: (Print or Type Name) Title: , Witness (Print or Type Name) PA061094.002\ppp\Grapevine Citywide Signal Timing Additional Services. doc