HomeMy WebLinkAboutItem 09 - Golf CourseMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: MARCH 19, 2024 SUBJECT: PURCHASE OF CONSTRUCTION REMODEL SERVICES TO PRACTICE AREA AND CHIPPING GREEN FOR THE GRAPEVINE MUNICIPAL GOLF COURSE RECOMMENDATION: City Council to consider purchase of construction remodel services for the practice area and chipping green at the Grapevine Golf Course from GreenScape Six. FUNDING SOURCE: Funds are available in the Lake Enterprise Fund (Golf) for an amount not to exceed $402,175. BACKGROUND: This purchase is for the expansion of the existing tee line and short game putting and chipping green to better accommodate the growing demands of golf course customers. This purchase will be made in accordance with an existing interlocal agreement with The Local Government Purchasing Cooperative (Buy Board) as allowed by Texas Local Government Code, Chapter 271 and Texas Government Code, Chapter 791. Bids were taken by the Cooperative and a contract was awarded to GreenScape Six. The Public Works and Purchasing staff reviewed the contract for departmental specification compliance and pricing and determined that the contract would best meet the needs of the City. Staff recommends approval. MT/TM DESCRIPTION OF IMPROVEMENTS SHORT GAME AREA01f #1 to • A completely new short game area will be constructed west of the existing chipping green • The 9,000 to 10,000 square foot green will be serpentine in shape allowing for multiple users and multiple types of shots to be practiced • Multiple bunkers of different sizes and depths will be located around the new chipping green • The chipping green surrounds will have a variety of mowing heights and contours that will allow for many different types of shots into the green • Two of the Wedge Course greens will be connected to the Short Game Area and could also be used as Short Game Greens GRAPEVINE G c PRACTiGE AREA CON CCFT A. 1, = Go' 5. 24 • 22 ' I GRAPEVINE GOLF COURSE PRACTICE AREA IMPROVEMENTS (D (DQ CO3 00 rr__r i-IT-1 ✓ Ne r a acticg�-- New Short �ame Pra•:Jce _Practice Te ng Arla 4uild & xpand Or New - New Puttingk" Tee Green 1 \\� New Short / 1 % Course ID I I General Contractor: GreenScape Six Buy Board #4582 #705-23 #706-23 Sub Contractor: Fleetwood Services LLC Grapevine Short game Green, Chipping Course and Tee Expansion Grapevine, Texas Unit Abbreviations Bid Date 3-4-24 sf square feet pg per green complex ac acre pt per tee complex ea each psb per sand bunker cy cubic yard pgb per grass bunker bu bushel ppp plastic perforated pipe t ton sdp sewer and drain pipe Is lump sum fv flush boxes/cleanouts # pound gi grate inlets hrs hours ph per hole If linear feet pf per fairway ct cart turnout ff facial foot bldg building ITEM DESCRIPTION 8, PRICE IN WORDS UNIT QUANTITY UNIT PRICE TOTAL I. MOBILIZATION/ SUPERVISON Is 11 1 $ 20,000.00 $20,000.00 II. Short -ame Green chio:;in,,. course and Tee Ex.:ansion A. Strip Sod (Bury Onsite) sf 145,000 $ 0.30 $13,500.00 B. Earthwork cy 12,000 $ 10.00 $20,000.00 C. Shaping Is 11 $ 60,000.00 $60,000.00 D. 4" Perforated Tile If 850 $ 8.50 $7,225.00 E. Carry Off Tile 6" If 1 500 $ 10.00 $5,000.00 F. Gravel Layer - 4" sf 110,000 $ 2.90 $29,000.00 G. Greensmix- 12" (Kosse) sf 110,000 $ 5.90 $59,000.00 H. Irrigation Heads EA 116 $ 1,500.00 $24,000.00 I. Driving range Tee Expansion LS 11 $ 20,000.00 $20,000.00 I J. Scaled Down Chipping Course - Turn Key LS 11 $ 100,000.00 $100,000.00 K. Finish Grading Greens sf 10,000 $ 0.25 $2,500.00 L. TifEagle 15bu/1000sf sf 10,000 �35,000 $ 0.80 $8,000.00 M. Finish Grading Surrounds and Tee Top sf $ 0.25 $8,750.00 N. Sodding Surrounds sf 112,000 $ 0.85 $10,200.00 O. Sprigging Tee Top sf 30,000 $ 0.50 $15,000.00 Subtotal $402,175.00 Note:Chipping Course will Cost more if done separtly ($250K) I Total $402,175.00 1 ITotai $402,175.001 All An Estimate based on Today's prices