MEMO TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL,
AND THE PLANNING & ZONING COMMIS ION
FROM: ROGER NELSON, CITY MANAGER �Q
MEETING DATE: SEPTEMBER 21, 2004
SUBJECT: PRELIMINARY PLAT APPLICATION
LOTS 1-24, BLOCK 1, CRESTWOOD HOLLOW
PLAT APPLICATION FILING DATE ................................................. September 10, 2004
APPLICANT..............................................Mr. Bryan Holland, Realty Capital Corporation
REASON FOR APPLICATION ........................... Platting site for a residential subdivision
PROPERTY LOCATION .................................. Between Hall -Johnson and Hughes Road
approximately 1/3 mile east of SH 121
SITEACREAGE.........................................................................................................6.82
ZONING............................................................................................ R-5.0, Single Family
NUMBEROF LOTS.......................................................................................................24
PREVIOUSPLATTING................................................................................................. No
CONCEPTPLAN................................................................................................... Z04-03
SITEPLAN................................................................................................................... No
OPEN SPACE REQUIREMENT................................................................................. Yes
AVIGATIONRELEASE............................................................................................... Yes
PUBLIC HEARING REQUIRED.................................................................................... No
0:\AGENDA\2004\09-21-04\CrestwoodHollow P.doc
PLAT INFORMATION SHEET
PRELIMINARY PLAT OF
LOTS • • • ! HOLLOW
INNERMUM
• Mr. Bryan Holland, the applicant, is platting this site for a single family
subdivision. This 6.82 acre site is located between Hall -Johnson and Hughes
Roads west of Grapevine Elementary School.
11. STREET SYSTEM:
• This development has access to Hall -Johnson and Hughes Roads.
• The abutting roads: ® are on the City Thoroughfare Plan
❑ are not on the City Thoroughfare Plan
® Periphery Street Fees are due as follows: Hughes Road
Type of Roadway
❑ Major Arterial (A)
❑ Major Arterial (B)
❑ Minor Arterial (C)
❑ Minor Arterial (D)
® Collector (E)
❑ Collector (F)
❑Sidewalk
❑Curb & Gutter
TOTAL
Cost / LF Length Cost
$ 234.57 / LF
$ 178.35 / LF
$ 203.06 / LF
$ 170.33/LF
$ 170.33 / LF 220.42 ft $37,544.14
$ 150.98 / LF
$ 15.00 / LF
$ 10.00/LF
$37,544.14
® Periphery Street Fees are not required for: Hall -Johnson Road.
111. STORM DRAINAGE SYSTEM:
• The existing stormwater drains north towards Hall -Johnson Road and ultimately
into Creek 21.
The developer will be required to design for onsite as well as offsite drainage in
accordance with the requirements of the City of Grapevine's Code of
Ordinances.
0:WGENDA12004109-21-04\CrestwoodHollow P.doc
IV. WATER SYSTEM:
The existing water supply system bordering the subject site is adequate to
serve the development.
❑ The existing water supply system bordering the subject site is not adequate
to serve the development. Additional off site water system improvements will
be necessary to serve the site.
V. SANITARY SEWER SYSTEM:
❑ The existing sanitary sewer collection system bordering the subject site is
adequate to serve the development.
The existing sanitary sewer collection system bordering the subject site is not
adequate to serve the development. Additional off site sanitary sewer
improvements will be necessary to serve the site.
VI. MISCELLANEOUS:
❑ Water and Wastewater Impact Fees are not required for:
Z Water and Wastewater Impact Fees are due prior to the issuance of building
permit for: Lots 1-24, Block 1, Crestwood Hollow
Z Single Family Residential ( $ 2,778 / Lot)
❑
Multifamily ( $ 1,291 / Unit)
❑
Hotel ( $ 47,631 / Acre)
❑
Corporate Office ( $ 22,023 / Acre)
❑
Government ( $ 7,688 / Acre)
❑ Commercial / Industrial ( $ 6,352 / Acre)
❑ Open Space Fees are not required for:
Z Open Space Fees are required for: Lots 1-24, Block 1, Crestwood Hollow
Z R-5.0, Zero Lot District $ 1,416.00 / Lot)
❑ R-7.5, Single Family District $ 1,146.00 / Lot)
❑ R-12.5, Single Family District $ 1,071.00 / Lot)
❑ R-20.0, Single Family District $ 807.00 / Lot)
24 lots @ $1,416.00 = $ 33,984.00. Open Space Fees are
due prior to the release of construction plans.
❑ Public Hearing Only
City Council and Planning and Zoning Commission Action scheduled
for
0:\AGENDA\2004\09-21-04\CrestwoodHollow—P.doc
❑ Variances are required on the following items:
BZA hearing to be conducted on
® The following items associated with this plat are not in accordance with the
current subdivision standards:
❑ 50' ROW dedication not met: Developer is proposing to dedicate 40'
of ROW with 10' of sidewalk and access easements.
® Length of cul-de-sac street exceeds the 600 -foot limit: Timber Crest
Court
VII. STATEMENT OF FINDINGS:
A. The City has determined that the right-of-way and easements required to be
dedicated for streets, utilities, drainage, access, sidewalks and other
municipal needs and services are consistent with the City's ordinances and
master plan, are reasonable and are connected to the proposed project in
the following manner:
® The right-of-way provides for future widening of public streets that will
serve the development of this site.
® The onsite utility easements provide for a utility network to serve the
development of this site.
® The onsite drainage easements provide for a drainage network to
serve the development of this site.
® The onsite access easements provide cross access capabilities to this
site and surrounding property.
® The onsite sidewalk easements provide for a sidewalk network to
serve the development of this site.
B. The City further finds that the required dedication is related both in nature
and extent to the impact of the proposed development as follows:
® The right-of-way is necessary to provide for future widening of public
streets that will serve the development of this site.
0:\AGENDA\2004\09-21-04\CrestwoodHollow P.doc
a ❑
Front building line
❑
Rear building line
❑
Lot depth
❑
Other —
BZA hearing to be conducted on
® The following items associated with this plat are not in accordance with the
current subdivision standards:
❑ 50' ROW dedication not met: Developer is proposing to dedicate 40'
of ROW with 10' of sidewalk and access easements.
® Length of cul-de-sac street exceeds the 600 -foot limit: Timber Crest
Court
VII. STATEMENT OF FINDINGS:
A. The City has determined that the right-of-way and easements required to be
dedicated for streets, utilities, drainage, access, sidewalks and other
municipal needs and services are consistent with the City's ordinances and
master plan, are reasonable and are connected to the proposed project in
the following manner:
® The right-of-way provides for future widening of public streets that will
serve the development of this site.
® The onsite utility easements provide for a utility network to serve the
development of this site.
® The onsite drainage easements provide for a drainage network to
serve the development of this site.
® The onsite access easements provide cross access capabilities to this
site and surrounding property.
® The onsite sidewalk easements provide for a sidewalk network to
serve the development of this site.
B. The City further finds that the required dedication is related both in nature
and extent to the impact of the proposed development as follows:
® The right-of-way is necessary to provide for future widening of public
streets that will serve the development of this site.
0:\AGENDA\2004\09-21-04\CrestwoodHollow P.doc
The onsite utility easements are necessary to provide for a utility
system to serve this development and connect to existing utilities on
surrounding property.
The onsite drainage easements are necessary to provide for storm
drainage improvements to serve the development of the site.
The onsite access easements are necessary to provide cross access
capabilities to this site and surrounding property.
The onsite sidewalk easements are necessary to provide for a
sidewalk network to serve the development of this site.
All of the dedications benefit the development to at least the extent of
the impact of such on the development.
VIII. RECOMMENDATION:
"Move that the City Council (Planning and Zoning Commission) approve the
Statement of Findings and the Preliminary Plat Application of Lots 1-24,
Block 1, Crestwood Hollow."
0:1AGENDA�2004\09-21-04\CrestwoodHollow—P.doc
08/02/2004 15:11 8174103003 PW ENGINEERING PAGE 02
PLAT APPLICATION
CITY OF GRAPEVINE, TEXAS
TYPE OF PLAT: —Preliminary Final - —Replat —Amended
PROPERTY DESCRIPTION:
Name of Addition
Number of Lots*. 24
Oak Park Estates
Residential.;
Gross Acreage- 6-82 Proposed Zoning., R-50
Location of Addition: Between Hall -Johnson and Hughes, East of S.H. 121
PROPERTY OWNER:
Name: RCP Grapevine Residential, tAJ
Address: , 32 Village Lane, Ste. 200
City: Colleyville
State: TX Zip,, 76034
APPLICANT:
Name: Realty Capital Corporation--'
Address: 32 Village Lane, Ste. 200
Contact: Mr. Bryan Holland j_Lf44t,,&- a. i
Phone: 817-488-4200
Fax: 817-424-2448
Signature-.
e'VjIqV
Contact'. Mr. Bryan Holland
Phone: 817--488-4200
City: Colleyv -ille Fax: 817-424-2448
TX
State: Zip: 76034 Signature:
SURVEYOR:
Name: Baird, Hampton & Brown
Address: 6300 Ridglea Place, Ste. 700
City: Fort Worth
Konstantine Bakintas, P.E.
Contact. Paul Hubert, R.P.L.S.
Phone: 817-338-1277
Fax: 817-338-9245
State: TX Zip: 76116
FOR 0 FICE USE ONLY
14 '0q
Application Received: From:
Fee Amount: S Check Number.
Final 200+5/Lot = 320
Prelim..100+5/Lot = 220 ($540
g
Q 1.0 V
WO
a 8� a a g 8 8 a s
_ I � k � n
.'` ,a@ &0 �6 g^� �* •xg Edi aw w a° �*
s b•g�"' � ���q} �'•�g � 'g ��
10
r a g F Y
w �
8 � •s 8 � .� o �'
��. •dap �dgtog
N 4�,ffi •��b�°a' al ® �6 8'��"9W '� .�
0d� o ' 1� :z �° a x�ob8 ifIt '6v j�F�
�p �a. h .:, .'� z $'�•° r'Lffo p$' �PG��Rg � ���a.w�� ;g � 'g
•�'`^ � �� �agAn
��77 8 8$ p�" 99° qK g rs, 6 '69 a w ° F �$ �' z 6� y� •8 �° PPO
!a� �eH xB �j m'� 3 .o s'gx �gp 9 y@8� 'S.'S ° � w.a �i�.. �". o � �!' ��u. �4�°���� •55�8�g 'g �"° wp �°
�n0u°' �offi�o � ��� �rJ� ��� x�$,�9z @'���$� �� � � ��� �� z 5 � y � oy.S SCr a '� g iitl .$gi• � �p � �.a
:00'9L8
V
sc
E+
p N Q
S
o
z
m�
O
o U H
q A a
ae
o
a+ o
a 00
ao Qy, o 0
V N
0 •"
g�f
�C
=gypo_
iy
.O
�
a�
ay
w °0
Li-
m U2a a �
�
.6Dig
.6l Dig
,
:00'9L8
sc
E+
p N Q
S
:00'9L8
' m
f \
S t1
,0 s
xmrg"
sc
o
z
m�
O
o U H
q A a
ae
o
a+ o
a 00
ao Qy, o 0
V N
0 •"
g�f
�C
=gypo_
iy
.O
�
a�
ay
w °0
Li-
m U2a a �
�
.6Dig
.6l Dig
,
' m
f \
S t1
,0 s
xmrg"