Loading...
HomeMy WebLinkAboutItem 10 - Concrete Construction/D MEMO TO: HONORABLE MAYOR AND MEMBERS OI FROM: ROGER NELSON, CITY MANAGER MEETING DATE: SEPTEMBER 2, 2003 SUBJECT: APPROVAL OF BID 168-2003, ANNUAL CONTRACT FOR CONCRETE CONSTRUCTION RECOMMENDATION: City Council to consider approval of an annual contract for the lowest and best bid meeting City specifications to REC General Contractors as primary supplier, Manning Concrete Sawing as secondary supplier and Ed. A. Wilson as third supplier to perform concrete construction services on an as needed basis. A bid tabulation is attached for review. FUNDING SOURCE: 174-43301-090 Street Maint./Annual Maint. & Overlay/Transportation..$100,000.00 BACKGROUND: Bids were taken in accordance with Local Government Code Chapter 252, Subchapter B, Section 252.021 (a) and Section 252.041 (a). Bids were publicly read aloud per the attached tabulation sheet. Notice to bidders was published in the Fort Worth Star Telegram on July 24, 2003 and July 31, 2003. This contract establishes fixed pricing for concrete construction flat work, handicap ramps and vertical retaining walls. The services will be ordered on an as needed basis by the Street Division or other departments as required. Bids were issued to nine vendors with three vendors responding. Bids were taken based on various thickness and height configurations and on unit pricing of square feet for items 1 through 7 and linear feet for items 8 and 9. Of the three bids received, REC General Contractors was overall low bid on all items. Manning Concrete Sawing was apparent low bidder on items 8 and 9 but because of the difference in pricing between the bids received on these two items, staff called Manning and learned that their bid for these items was in error. They bid square feet instead of linear feet. Due to this their pricing could not be determined for these two items. August 27, 2003 (4:33PM) To insure the availability of this service it is recommended that REC General Contractors be awarded an annual contract as primary supplier for all items, that Manning Concrete Sawing be awarded an annual contract as secondary supplier for items 1 through 7 and that Ed A. Wilson be awarded an annual contract as third supplier for all items. Staff recommends approval. WX August 27, 2003 (4:33PM) kala- We:Md Owft Time: 0&8!0 032:00 P.M. Bid Tdle' Concrete Fiat Work -Amus{ Cortrad CrrY OF GRAPEVINE B{d TabuFatlon Form Vwdor RM. 1 VENDORS........... ........................... _.... . Mar"m Concrete Sawing Unk Price tar I Unit Price for Pub for S-2' Mee for 23 a for 4' Mus Mem I 14W S4 PL I SW+34 rL I HlghpwLF I Ngh Per LF I iii Por LF Furnish all materials, idwr Wand td pwfwm allGrading' Forcing. Pourkw, FWshbra. Ba.1,40 a. Landscaoino and Re - ....... ..... .. __..._ .. $85.90 $95.50 Bid Totals (Hems 1-7).......................................................................... $112.00 1 Per 0cckarence for 4" Thick $5.50 $5.25 WA WA FIA 2 Per Occurrence for 6" Thick $6.00 $5.75WA WA WA WA 3 Per Occkrrace for 8' 71dck $7.50 $7.00 WA WA WA Punish all -wwsl Forming, Pouring, Finishing, Backing, Landscaping and Its- soMno. To also Wncltde disloosai of existing concrete slab UdW 3% Ft. 5W+Sq. M. NOOw tF kkWn Por LF I Ifth Par LF Ram Descrioeon 4 L Occurrence for 4" Thick $6.75 58.25 WA WA WA 5 Per Occurrence for 8" TNck $8.25 58.00 WA WA WA 8 Per Occurrence for 8" Thick $9.75 $9.25 WA WA WA 7 Par occurrence for 4" Thick kandcao Ramos $5.15 $5.10 WA WA WA 8 Per oecurenea for ('Thick Vertical Reteirtino Wail WA WA $12.00 $15.00 $20.00 9 Par Occurrence for 1' Thick Verticai Retairine Wag WA WA $15.00 $20.00 $25.(0 c45 nn 5uoIota)'a'...................................................................--- Bid Totals (Hems 1-7).......................................................................... 395.50 Bid Totals (items ")........ ..._........ ......... ............ ....................... ............... ....... .......... ................ ........................... $107.00 Vendor Rat 2 VENDORS........... ........ ...... _.......... ....... REC General Conhadom {kik price for I Unit Price for Price fw 1"2' Price for 23' a for 4' Mus 'Item IDesdh. 1 14W 34 PL 500+S4 Ft. {kph per LF tin Mr LF I tkph Por LF � Furnish all materials, labor and services to Perform ONtira4ng, ....... ..... .. __..._ .. $85.90 $95.50 Bid Totals (Hems 1-7).......................................................................... $112.00 Fomino. Paiw . Firvetinc. Beck-fiMkm. Lends -aril Rs - ur $436.00 BidTotals(MemsB-9)........................_.__............................................................................................................. WA WA WA 2 Par Ocaarence for 8" Thick Vendor Not. 3 $6.50 WA VENDORS - ......................................... Ed A Wilson 1 Per occurrence for 4"Thick $3.70 $3.20 WA WA WA mat $gluon and services to perform a Forming, Pouring, FinishinZ BackAling, LwW&cWwV and R. aodno. To also include dsoosd of existrw concrete slab UdW 3% Ft. 5W+Sq. M. NOOw tF kkWn Por LF I Ifth Par LF Ram Descrioeon 2 Peroccarenceforlr*rWok $4.70 $4.50 WA WA WA 5 1 Par Occurence for 8" Thick $9.25 $8.00 WA WA WA 3 Per Ocourrence for8"Thick $5.30 $5.W WA WA WA rrroterlais, {door sarvnces to pertorm an g. $10.00 Woo WAI WA WA Forming, Pouring, Fntshiig, Back-HItng, Landscaping and Re- WA WA $25.00 S55.00 585.00 -&- To also include dnsoosal of exisikw --rat- sial, WA WA $40.00 ecc m $115.00 sun m $150.00 2235.00 4 Per Occurrence for 4* Thick $4.40 $3.90 WA WA WA 5 Per occurrence for 8" Thick $5.00 $4.40 WA WA WA 8 Ips, Occurrence for 8" Thick $6.10 {5.50 WA WA WA 7 Per Occurrence for 4" TN k W dicao Renes $5.20 55.00 WA WA WA 8 Par occ armee for go Thick Vertical R tairino We# WA WA {50.00 SB9.W 580.00 9 Par 0ecrrance for 1' Tuck Vertical Retainim Wap WA WA $82A0 $80.00 2140 m $95.00 5175.00 :iw Iotare............ ................. ...................._.. ....... ..... .. __..._ .. $85.90 $95.50 Bid Totals (Hems 1-7).......................................................................... $112.00 1 Per Occ acne* for 4" Thick $436.00 BidTotals(MemsB-9)........................_.__............................................................................................................. WA WA WA 2 Par Ocaarence for 8" Thick Vendor Not. 3 $6.50 WA VENDORS - ......................................... Ed A Wilson 3 Per Ocekarenoe for 8" Thick $10.00 $8.00 W* Price for tktdt Pries for Mee $or 1"2' Pfkx for 23' for4' Plus mat $gluon and services to perform a Forming, Pouring, FinishinZ BackAling, LwW&cWwV and R. aodno. To also include dsoosd of existrw concrete slab UdW 3% Ft. 5W+Sq. M. NOOw tF kkWn Por LF I Ifth Par LF Ram Descrioeon 4 L Occurrence for 4"Thick $7.50 58.50 WA WA WA Ftanish M materials, labor and services to perform d QnM*rg, Fomdno. Pow{ no . Fidddnm Bede-11111nw. Landsonotno and Re - $65.90 Manning Concrete Sawing $95.50 Ed E. Wilson $112.00 1 Per Occ acne* for 4" Thick Woo $5.25 WA WA WA 2 Par Ocaarence for 8" Thick $6.00 $6.50 WA WA WA 3 Per Ocekarenoe for 8" Thick $10.00 $8.00 WA WA WA mat $gluon and services to perform a Forming, Pouring, FinishinZ BackAling, LwW&cWwV and R. aodno. To also include dsoosd of existrw concrete slab 4 L Occurrence for 4"Thick $7.50 58.50 WA WA WA 5 1 Par Occurence for 8" Thick $9.25 $8.00 WA WA WA 6 Per Occurrence for 8"Thick $12.00 $10.00 WA WA WA 7 Per Occurrence for 4" Thick Fbndcao Ramos $10.00 Woo WAI WA WA 8 Per Occurrence for 8"TNck Vertical Reteirirw Well WA WA $25.00 S55.00 585.00 9 Per occurrence for 1' Thick Vertical Retairim WaN WA WA $40.00 ecc m $115.00 sun m $150.00 2235.00 . ngrans.......... ............................................. ....._...,' _ BidTotals (Nems 1-7).......................................................................... $112-00 BidTotals(Renis8-9)................. ..... .............. .......................... ......_................... ...... ...................................... ...... $470.00 81D SUMMARY: Low bids for unit pricing on Items 1-7 REC General Contractors $65.90 Manning Concrete Sawing $95.50 Ed E. Wilson $112.00 Low bids for unit pricing on items 8-9 REC General Contractors $436.00 Ed E. Wilson $470.00 Manning Concrete Sawing' $107.00 'Manning Concrete indicated they bid items M in error and that their pricing is for sq. feet and not linear feet Their actual pricing for these items could not be determined.