Item 04 - Creek 23/17 Construction Project
ITEM 0 4 MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER/114/ MEETING DATE: MAY 4, 2004 SUBJECT: CHANGE ORDERS NO. 6 — CREEK 23/17 CONSTRUCTION PROJECT RECOMMENDATION: City Council consider approving Change Order No. 6 to the Creek 23/17 Construction Contract in the amount of $122,606.12 for concrete channel lining modifications to the interlocking pavers, authorize staff to execute said Change Order, and take any necessary action. FUNDING SOURCE: Funds are currently available and programmed as follows: Funding Source Account Amount Award Percent 94 GO Bonds 178-78324-007 $373,830.48 7.8% OOA CO 116-48930-536-1-000001 $4,203,129.00 $122,606.12 88.1% 96 GO Bonds 178-78355-009 $32,169.52 0.7% SDUS 116-48941-535-1 $160,710.00 3.3% Peripheral Fees 178-21407 $1,892.77 0.1% TOTAL $4,771,731.77 $122,606.12 100% Budget Amount Award Percent Engineering $549,671.95 11.5% Construction $3,892,139.45 $122,606.12 81.6% Testing $58,868.00 1.2% Misc. $26,117.86 0.6% Contingency $244,934.51 5.1% TOTAL $4,771,731.77 $122,606.12 100% N:{e&1*101a1!R Change Order # 1, approved by Council in the amount of $50,108.89 on May 21, 2002, addressed waterline adjustments, additional curb inlet & lateral line construction, and adjustments to modular block wall locations to rectify conflicts with field conditions. Change Order # 2, approved by Council in the amount of $178,373.94 on December 17, 2002, addressed additional height to the modular block walls, additional pipe rail safety fencing, and additional gabion baskets and gabion blankets to protect private property. Change Order #'s 3, 4 and 5, approved by Council in the amount of $66,173.50 on January 20, 2004, addressed field modifications to the channel to protect adjacent property from erosion and damage. Change Order # 6 addresses the placement of a concrete overlay on the interlocking concrete paver units on Creek 23, installed with this project between the Creekwood Drive culvert crossing and the oxbow on school property approximately 600 feet upstream. The original construction plans for Creek 23 included a concrete channel bottom upstream of the Creekwood Drive crossing. During the environmental permitting process for this project, the Corps of Engineers (COE) and other environmental regulatory agencies, required the concrete channel bottom be changed to interlocking concrete paver units. The intention was to allow ground water to percolate through the bottom of the improved channel, allow limited vegetation to grow in the channel bottom, and provide a wildlife habitat. The first significant rain event following the placement of the interlocking paver units resulted in uplifting and displacement damage to the channel bottom. This type of damage occurred on three different occasions with the contractor repairing the damage after each event. Due to the velocities and flow volumes through this channel, this type of channel bottom isnot a good choice for a stable channel bottom. The prospects for continued damage, excessive maintenance costs, and standing water due to displacement poses a health risk for the surrounding neighborhoods. City staff requested the COE allow a concrete slab to overlay the interlocking concrete paver units. The COE processed this request through the environmental regulatory agencies and approved the modifications. Staff recommends approval. N 'Z CHANGE ORDER PROJECT: Creek 23117 Channel Improvements OYMER: City of Grapevine ENGINEER: Freese and Nichols Gansu ting Engineers CONTRACTOR: Omega Contracting. In, - nc.2518 251 aChalk Hill Rd. Dallas, TX 75212 CHANGE ORDER: Six DATE. May 4, 2C -G4 UNIT CONTRACT' REVISED TO DATE THIS CHANGE ORDER REVISED REVISED " ITEM DESCRIPTION UNIT PRICE UNITS COST 1 MobilizaJon L.S. $135,545.00 1.00 S135,545.09 1.00 5135,545.00 50.00 1.00 $135,545.00 2 Care of Water L.S. $5,030.00 3.00 515,000.04 3.00 $15,000.00 50.00 3.OD $15,000.00 3 Clearing and Grubbing L.S. $16,750.00 3.00 S50,259.00 3.00 550,250.00 50.90 3.00 $50,250.00 4 StonriWtrPoll. Prev.Plan LS_ $6,01515.20 1.00 56,009.20 1.00 $6,000.20 50.00 1.00 40.00 $6,000.20 5185,000.00 5 UnclassifiiedChannnetExcavation L.S_ $4,625.00 40.00 S185,030.00 40.00 5185,000.00 &0.00 $0.00 40.00 5166,000.00 6 Compacted Fill, incl. 6" topsoil L.S. EA. $4,150.00 $67.00 40.00 120.00 $166,000.00 $1.0,440.00 40.00 134. DD 5166,000.00 511,658.00 $0.00 134.00 511,658.00 7 8 . Re-nove trees 0" to 6' dia. Remove trees 7" to 12' dia. EA. $206.00 140.00 $28,840.00 149.00 $30,694.00 $0.00 149.00 530,694.00 9 Remove trees 13" dia. EA. $343.00 42.00 $14,406.00 54.00 $16,522.00 $0-00 54.00 $18,522.00 t0 Remove & Relocate existing rence L.F. $t8.00 260.00 $4,684.00 260.00 54,689.00 $0.00 $0.00 20""0.00 1.00 S4,680.00 $2,500.00 I i 12 Rem. & Sarv. Exist, Bridge Rem. & Disp. LwT, Rail Tie L.S. L.S. S2,500AIJ 53,000.00 1.00 1.00 $2,500.00 $3,1)D0.00 1.00 1.00 52,500.00 $3,000.00 $0.00 1.00 $3,000.00 13 Rem. & Disp. Slone Retain. Wail L.S. $4,500.00 1.00 $4:500.00 1.00 $4,500.00 $+0.00 $0.00 1.00 1.00 $4,500.00 $3,400.00 14 Rem. & Olsp. Ang. Iron Fed. Bridge L.S. C.Y. S3,000.00 $250. DO 1.00 820.00 $3,ODO.00 $205.000.90 1.00 838.38 $3,000.00 $209,595.00 $0.00 838.38 $209,595.00 15 16 Reinf, Cone. Chann. bottom Slamp. Concr. Chann. Bo;tom S.Y_ $16.20 6,200.00 $100.440.00 8.661.80 $107,921.16 11289.90 $20,881.80 7,950.80 $128,802.96 17 Rein[ Cora. Chann. Wall >6' G.Y. $400.00 760.00 $304.00.00 751.10 $300,440.00 $0.00 751.19 $300,449.00 18 ReinF. Cane. Chann. Walls <6' C.Y. $400.00 1,680.00 $672,00D.00 1,291.59 $516,636.00 $0.00 1,291.59 $516,636.00 19 Modular 8: Walls S.F. $15.60 28,850.00 $450.060.00 34,568.48 $539,268.29 50.00 34.!568.48 $539,288.29 20 Interlocking Conc. Paving Urias S_Y. $24.50 3,450.00 $84.525.00 3,123.90 $76,535.55 $0.00 3,123.90 $76,535.55 21 1.91sapStor,9Weir L.S. S5,000.00 i.DO $5.000.00 1.00 $5,000.00 $0-00 1.00 $5,0150.00 22 Gone. Chann, Bottom Flood Oveftlor C.Y. $450.00 34.00 $15,300.00 27.90 $12,555.00 50.00 27.90 $12:555.00 23 Concrete Drop Structure C,Y. 5450.00 28.00 $12.600.90 28.00 $12,600.09 $0.00 28.00 $12:600.00 24 Concrete Drop Structure C.Y. 5450.00 22.00 $9,900.60 22.00 $9,900.07 $0.00 22.00 $9,900.00 25 Concrete Axes Ramp atHlghSchot C.Y. 5450.00 40.00 518.000.09 45.00 $18,000.00 MOO 40.00 $18,000.00 26 Welded Pipe Rail Sarety Fence L -F. $39.60 2,900.00 $114,840.00 3,480.00 $137.808.00 $0.00 3,480.00 $137,808.00 27 3' x3' PVC Gafvanfzed Box Gabfon G.Y. 5151.00 140.00 $21,140.00 312.42 $47,175.42 5DA4 312.42 $47,175,42 28 3' x3 PVC Coaled Gabion C.Y. S151.00 70.00 $10,570.00 100.00 $15,100.00 SO.00 100.00 $15,100.00 29 12" Thick galvanttedblanket ocbion S.Y. 5127.00 330.00 $41,910.00 45183 $57,640.22 SO.00 453.86 $57,646.22 30 12" PVC coated bra nket gabion S.Y. 5127.00 169.00 520,320.00 20D.O.3 525,400.03 50.00 200.00 $25,400.00 31 Cone. Slope Prot. C.Y. 5350.00 16-00 55,600.04 18.00 $5,600.00 50.50 16.00 $5,800.00 32 18" dia. Loose Rack Rip Rap S.Y. 5110.00 160.00 517,600.00 t60.03 517,600. co 50.60 160.00 $17,600.00 33 Dbl. 20'x8' cane. Arch culvert L.S_ $256,824.00 1.00 S256,824.00 1.00 5256,824.00 50.6'01 1.00 416.06 $256,824.00 $14,362.10 34 Savcut, rmv&d'spof6'asphaitpas S.Y. 535.00 325.00 S11,375.DD 416.03 $14.362.10 $3,015.C'D 50.50 50.90 402.00 $3,015.00 35 36 Sawcut, rem. & dispcurb& gu!!er Sawcul, rem. & dispsidewalk L.F. S.Y. $7.50 518.00 290.00 100.00 $2,175.150 51,800.00 402.00 138.97 $2,501.46 50.00 138.97 $2,501.46 37 6' asphalt Pavement S.Y. S18.00 325.00 S5,850.OD 437.89 $7,880.40, 50.00 $0.00 437.80 116-17 $7,880.40 $3,485.10 36 Sidewalk S.Y. L.F. S30.00 512.09 20.00 140.00 $600.00 S1,680.01) 116.17 287.03 $3,485.10 $3,444.06 $0.00 287.00 53,444.00 39 40 Concrete Curb & Guler 14' Thick Pilas!erfoundation S.Y. $100.00 80.00 $8,000.00 120.00 S12,000.00 $0.00 120.00 512,000.00 41 Stoneciad Pir3ster L.F. $100.00 48.00 54,830.00 48.40 54,800.00 $0.1515 so. OD 48.00 72.00 54,800.00 37,20200 42 43 Bicycle Rail TxDo( Metal Bean Guardrail L.F. L.F. $S0D.00 $25.00 72.00 73.09 $7,200"00 51,909.00 72.40 76.00 $7,200.D0 $1,9-00.00 $0.150 76.00 51,900.00 44 5'x3' reinf, Conc. Box Culvert L.F. $161.00 250.00 $40,250.00 250.00 S40,250.OD $0.04 $0.00 250.00 150.00 S40,250.00 514,100.00 45 48' Ota. Class III Re`nf. Cone. Pipe L.F. $94.00 150 AO 514,103.00 150.06 $14,100.00 46 Furn. & Install 42' Oia_ Cl III Reinf. P L.F. :80.00 270.00 521,6@30.00 45.00 S3,600.00 30.00 $0.60 45.00 510.00 $3,600.00 531,110.00 47 36' dia. Class 111 Reinr, Concrel Pipe L.F. $61.00 510.00 531,110.00 510.00 $31,110.00 $15,360.00 Moll, 320.00 S 15.360.00 48 30' Dia. Class III Re'nf. CA no. Pipe L.F. 548.00 320.00 $15,380.00 320.00 CL CD d' N O 4, a N L a - w 1. CHANGE ORDER PROJECT: Creek 23117 Channel rmprovements OWNER: City of Grapevine ENGINEER: Freese and Nichols Consu!ting Engineers CONTRACTOR: Omega Contracting, Inc - nc.2518 251 BChalk Hill Rd. Dallas, TX 75212 C14ANGE ORDER: Six DATE: May 4, 2004 UNIT ( CONTRACT REVISED TO DATE J THIS CHANGE ORDER REVISED REVISED ITEM DESCRIPTION UNIT PR9CE j WUAN I II T UU5 t Wil i 6 uy'iTI-UNWS TGqST-'� l3NIT3 COST 49 27' Dia. Class III Reinf. Conc. Pipe L.F. $42.00 280.00 $10,020.00 260.00 $10,920.00 $0.00 26D.00 $10,920.b0 50 24'0;9. Class 111 Reir_f. Concre'e Pig L.F. $38.00 260.00 $9.880.00 260.00 $9,880.00 $0.00 260.00 $9,660.00 51 18' Dia. Class III Relnf. Concrete PIg L.F. $31.00 80.00 $2,480.00 93.00 $2.883.00 $0.00 93.00 $2:883.00 52 15' Dia. Class 111 Reinf. Concrete Pir L.F. $29.00 20.00 $580.00 20.00 $580.00 $0.00 20.00 $580.00 53 Sawcui, Rem. & Rep. Asphalt Paven S.Y. 545.00 800.00 $36,000.00 11,114.50 $50,152.50 50.00 1,114.50 $50,152.50 54 Sawcut,. Rem & Recon. Drive S.Y. $45.00 70.00 $3,150.00 159.11 $7,159.95 SD.00 159.11 $71159.95 55 Trench Safety L.F. $1.20 2,120.00 $2,544.00 1,932.50 $2,3f9.00 50.00 1,932.50 $2,319.00 56 1 Y Curb Inlet EA- $0.00 OAO $0.00 0.43 $0.00 50.00 0.00 $0.00 57 11)' Curb Inlet EA_ $1,533.00 14.00 S21,462.DD f4.43 S21,462.13-1) $0.00 14.00 $21,462.00 56 Headwall & Cisp off-site EA. $1,ODO.00 3.00 53,000.00 3.00 $3,000.00 $O.Du 3.00 $3,000.00 59 Type A Headwalls EA. $1,25D.00 7.00 S8,750.00 7.00 56,750.00 $0.00 7.00 $8,750.00 60 Type 8 headwalls EA. $1,350.00 4.00 S5,400.00 4.00 S5,400,00 $O.DO 4.00 55,400.00 61 6'6q. Rehif. Conc. Strm Orn. MH EA. $5,052.00 3.00 $15,155.00 3.0.0 S15,156.OD $O.DO 3.00 515,156.00 62 8' Dia. SDR -35 Sanitary Sewer Pipe L.F. $19.00 43.00 S817.00 43.00 S817.00 $O -DD 43.00 5817.00 63 Sanitary Sewer Conc. Encasement L.F. $24.00 110.00 $2,640.00 110.00 $2,640.00 $0.00 110.00 S2,64000 64 Rem & Dis Ex. SS PAH EA. $2.400.00 1.013 $2,440.00 1-00 S2,400.00 $0.00 1.00 S2,400.00 65 4' Dia. Sanitary Sevier Manhole EA. $2,640.00 1.00 $2,640.00 1.D0 $2,640.00 $0.00 1.00 52,640.00 66 Rem. & Rept 8' SanllarySewer L.S. $4.860.00 1.00 $4,860.00 1.00 $4,860.00 $200 1.00 S4,&60.00 67 Rem & Rep.] 8' Water Line L.S. $4.921.00 1.00 $4,921.00 1-00 $4,921.00 $0 -OD 1.00 S4,92LDO 68 18' Dril'ed Shaft VCLF_ $50.00 32.03 31,8tYJ.00 32.00 $1,600.00 $0.00 32.00 511,600.00 69 Concre'e Support Beam C.Y. $500.00 2.00 $1,000.00 2.00 $1,000.00 $0.00 2.00 511,000.00 70 Rem& Rapt ID'steel SS Pipe L.F. $29.00 4800 $11,103.00 40.00 $1,160.00 $0.OD 40.00 $1,160.00 71 Tu4Re`nf. Mat S.Y. $4.78 4 X00.00 $21,510.00 4,500.00 $21,510.00 $0.00 4,500.00 $21,510.00 72 Bermuda or St. Augustine,Sod•JFng S.Y. $6.90 350.03 $2,415.00 350.00 $2,415.00 $0.00 350.00 $2,415.00 73 HydrnmuichSeeding S.Y. $1.03 15,000.00 $15,450.00 1S,000.00 $15.450.00 $DAO 15:000.00 $15,450.00 74 Brushmattress S.Y. $102.00 220.00 $22.440,00 220.00 $22,440.00 $0.00 220.00 $22,440.00 75 Live FasCha L.F. $30.00 195.00 $5,850.00 195.00 $5,850.00 $0.00 195.00 $5,850.00 76 CoirfSttavr Mett S_Y. $8.34 450.40 $3,753.00 450.00 $3.753.00 $0.00 450.40 $3,753.00 77 CentainerG[rnvnPlants EA. $45-80 420.00 $19,152.00 420.00 $19,452.00 $4.00 420.00 $19,152.00 78 Tree Planing MitigatlonI EA. $90.00 860.00 $77,400.00 860.00 $77,400.00 $0.00 860.01) $77,40809 79 Berry Prod Shrubs EA. $45.80 40.00 $1,824.0.0 40.00 $1,824.00 $0.00 40.00. $1,824.00 80 Nesting Boxes EA. $54.00 10.00 $540.00 16.00 $540.00 S9.00 fD.00 3540.00 81 5 -Gal Rets Tipped Pho:inia Shurbs EA. $45.60 113.00 $592.60 13.00 $592.80 $0.00 13.00 $592.80 CONTRACT SUBTOTAL $3,474,877.00 S3,503,783.15 $20,881.80 $3,524,664,95 1A Recons!ruct inlet at station 2+7.5 L.S. $2,389.16 0.00 $0.00 1.00 $2,389.16 50.00 1.00 $2,389.16 2A Waterline Service reloca ion EA. $202.33 0.00 $0.0.3 4.00 $809.40 SD.00 4.D0 $809.40 3A Repair 4" SS I' me EA. $1,742.40 0.00 $0.00 1.00 $1,742.40 $DAO 1.00 $1,742.40 4A Install 8' Wa ter Gate Valve EA. $1,409.93 000 $0.00 1.00 $1,409.93 50.00 1.00 $1,409.93 5A Crane Rental EA. $5,158.65 0.00 $0.00 1.00 $5,158.65 50.00 1.00 $5,158.65 SA RemoveIre-roUesprinkreT @ in..sts EA. $137.35 0.00 $0.00 9.00 $1.236.15 50.00 9.00 $1,236.15 N (L (D V- W W 0 0 tU L CL CC CHANGE ORDER PROJECT: Creek 231I7 Channel lmprovements OVVNER: City of Grapevine ENGINEER- Freese and Nichols Consulting Eng"neers CONTRACTOR: Omega Contracting, Inc. 2518 Cbalk Hi! I Pd. Dallas, TX 75212 CHANGE ORDER: Six DATE: May 4, 2004 UNIT I CONTRACT RE\nSED TO DATE THISCHANGE ORDER REVISED REVISED ITEM DESCRIPTION UNIT PRICE I WAN 1Y IT. I COST I lffqfrg---F W�S; UNITS I uuzj I UNITS COST ?A Emerg. tree removal & fence repair EA. $474.25 0.00 $0.00 1.00 $474.25 50.00 I DO $474,25 8A Asphalt patching for util"ty conflicts, EA. $7,631.33 0.00 $O.OD OX0 $0.00 $0.01) 0.00 $0.00 9A Ddveway replacement EA. $919,32 0.00 MOO 1.00 $919 32 $0.0() 1.00 $919-32 1111A Grate inlet EA. $840.44 0.00 $0.00 11.00 $940.44 MOD 1.00 $840.44 12A i, e-li'et and RCP EA. S2,879.25 0.00 $0.00 1,00 S2,87925 $0-00 1.00 S2,079.25 13A Tie-in of private drain pipes EA. $7,376-11 040 $0.00 1.00 $7,378.11 $0-00 1.00 $7,376.11 14A Nfodificaton to CSRW @ sta 8+00 EA. $7,324-65 0.00 MOO iM $7,324.65 $0.00 1.00 47,324M 16A Mod to CSRW @ Confluence EA. $5,597.65 0.03 $0.00 1-00 $5,597.85 $0.00 1.00 $5,597.85 18A CTB at Timberline EA. $30-00 0,00 SO.00 144.OD $4,320.00 144.00 $4,320.00 19B Reconstruct wall at sla t7#3010 55 L.S. $2,791Z0 0.0-a 50.00 1.00 $2.791.50 .$0.00 $0100 1.00 $2,791.50 20B Concrete Flume - TV. -n Creek Cove EA. $11'750.00 0.00 50.00 0-00 SI).00 $0.00 D.00 S9.00 21B Modify 42" RCP to 42" ADS pipe L.S. $17,715.00 0.00 50.00 1.00 $17,715.00 $0.00 1.00 $17,715.00 22B Electrical Conduit L.S. $2,686.00 0.00 $0.03 1.00 $2,866.00 SO.00 1.00 $2,866.00 24B Residentfal S prinkre r Repair L.S. $3,OOD.00 O.OD $0.00 0,00 S0,00 SO.00 0.00 S0.00 26B Replace 4" sanitary sewer L.S. $443.95 0.00 $0.00 1.00 $443.05 $0.00 1.00 $443.95 27B Channel Changes at Station 29+00 L.S. $9,556.00 0.00 $0.01) 1.00 $9,556.D9 $0.03 1.00 $9,1656.00 28B Add Excavation Creek 23 oxbow L.S. $2,320.00 000 $0. DD 1.00 52,320.1310 $0.00 1.00 $2,320.00 2913 Remove Cross Tie wall & Restore L.S. S15,290.0 0-00 M 00 1.e0 S 11 5,290ZO $0.00 1-00 $15,290.00 30B Addition work in Creek I? oxbow L.S. $1,400.00 0.00 $0.00 1.00 S1,400-00 $0.09 11-00 $1.400.00 31B Shoring up ex(sting wall L.S. $8100.CO 0-00 $0.00 ixo $800-00 MOD 11-00 $800,00 339 Custom pipe rail L.F. $47.30 0.00 $0.00 1,392.00 S65,841110 $0-00 1,392.00 S85,841.60 35B Stumpgrinding L.S. $933.C-0 0.00 $0.00 1. co $933-00 $0.00 1.00 $93300 36B Asphalt patch Creekw-d Cr Line B&C L.S. S 4,OX 52 0.00 $0.00 1.45 S5,825.00 $0. OD 1.45 $5,825.00 378 RemiRelay mod block various lac L.S. S5,990.01 0.00 $0.00 11,00 55,990.01 $0.00 1.00 55,990.011 38B Raise wa'I heicht at 2804 Creekwooi L.S. $ f 8,232. 00 OW $0.00 0.57 SID,448.01 $0.00 0.57 SID,448-01 39C Flume at 2836 Creekwcod Or L.S. $2,992.89 0.00 $0.00 0.33 5993.00 MOD 0.33 $993-00 40G Storm Drain Twin Creek Cove L.S. 215,337-Q 0.00 $9,00 11.00 $5,337.13 $000 1.00 S6,337-13 41C Rem & Repi Mod Brack 2804 CWD L.S. 622110 0103 SO.00 1,00 S221 A0 $0.00 1.00 5221.10 42D Repa'r rock wall 2416 Bria rwood L.S. $1,493-60 0.03 SO.00 1.00 $1,493.60 $0.00 1.00 51,493.60 14D rrrigallon system repa'r (T&rA) L.S. $2,400.00 0.00 SO.00 2-00 $4,6D0.00 MOO 2,00 $4.800.00 45E Creek 23 toe L.S. $7.590.60 0.00 $13-00 1.00 17.590.60 $0.00 1.00 $7,590.60 47E Stapled Sod S -Y. $6.73 0.03 SO.00 339.00 12,281.47 $0.00 339.04 $2,281,47 49E Rock wall Demo and rebuild L.S. $$458.50 D'OD SO.00 1.00 $1,05850 $0.00 1.00 $11'058.50 50E Re alignment of US 23 L.S. $7,878,15 D.00 $0.00 1,00 $7,679.15 $0.00 1.00 $7,678.15 51E Fill Dist behind 2909 Timberline L.S. 8621.00 O.Co $0.00 1.00 5621.00 $0.00 1.05 5621.00 52r= SR3 pe work beht-id 2836 CVVDN L.S. $1r8D0.41 0.00 50.00 1.00 $1,800.41 $0.00 1,0D $11,80.41 54E Import A!l & grade creekwood X&S, L.S. $4.321.59 0.00 40.03 1.00 $4,321.59 $0.00 1.030 $4,321.59 SSE Trimming Trees L.S. $226.00 0.00 30.00 1.00 $226,00 SO.00 I.03 $226.00 56E Additional wall at oxbow L.S. $828.80 0.00 30.00 1.00 $826.80 50.00 1.00 $826.80 57E Rip Rap S.Y. $19().00 0.00 $0.00 199.44 $37,703.60 50.00 198.44 $37,70160 58E Grading tear pasture at gabons L.S. $380.00 0.00 3D.00 1.00 3380.09 SO -00 1.00 $380.00 Original Contract Amount $3,474,877.00 Previous Change Orders $294,656.33 Change Order6 $122.BC6.12 Adjusted Contract Amount S3,892,139.45 The compensation agreed upon in this Charge Order Is for a'I costs the CONTRACTOR has incurred or may incur as a resu't of or relating to the changes in the scope orwork w!rether said costs are known, unknown, foreseen, or unforeseen at this time, fnr ud�'ng v: ithout limitation, any cast for deray, exteided Merbead, ripple or Impact costs, or any other effect on changed oru uncharged work as a result or this Change Order. The compensation is for fully compete and in-place construction. The actual quantities of items InstaCed or constructed have been measured and the quantities herein are adjusted aocordingiy. !Z t` Approved By. st' N O d- a Jerry L. Hadoe, Director of Publ-,c Woks ?.ppra ed By. ;_i� Cont to , CHANGE ORDER PROJECT: Cree<23117 Cbanrel Improvements OWNER: City of G rapevine ENGINEER: Freese and Nichols Consult':ng Engineers CONTRACTOR: Omega Contracting, Inc. 2518 Chalk Hill Rd. Dallas, TX 75212 CHANGE ORDER, Six DATE_ May 4, 2004 UNIT j CONTRACT REVFSEDTO DATE TH!S C14ANGEORDER REVISED REVISED ITEM DESCRIPTION UNIT PRICE [ UUANII1Y COSI f URITS I ZZ;OST UNITS �� UQzSI. UNITS COST 59E Grouting at outfall structures S.F. $2.60 0.01) SD.00 11,526.00 $3,967.60 S0.00 1,526.00 $3,967.60 61E Rock grouting in Creek 17 L.S. $278.00 0.D0 $0.00 2.00 $552.03 50.00 2.DD $552.00 62E Reimbursemer•.ttoCity L.S. 41,600.00 0.00 $0.00 1.00 v1,&00.00 50.00 1.D0 -$1,800.00 63F ICPU Derno;subgfade prep S.Y. S2.62 0.00 $0.00 0.00 MDO 2.400.00 $6,288.03 2,400.00 $6,288.00 64F 6'concreteoveday S.F. 58.32 0.00 $0.00 D.00 $0.00 11,601.00 $96,520.32 11,601.00 S'36,520.32 65F Delete LongitudinaIwaterstap L & $1.00 0.00 $0.01) 0.00 $0.01) -1,084.00 -$1,084.00 -1,084.00 41,084.00 ADD ITEMS SUBTOTAL $265,750.18 S101,724.32 3367,474.50 TOTAL VALUE OFVJORK PERFORMED $3,474,877.00 $3,769,533.33 5122,606.12 $3,892,139.45 ITEMS 1 THRU 81 & 1A THRU 65F TOTAL PREY CHANGE ORDERS $294,$56.33 $417,262.45 Original Contract Amount $3,474,877.00 Previous Change Orders $294,656.33 Change Order6 $122.BC6.12 Adjusted Contract Amount S3,892,139.45 The compensation agreed upon in this Charge Order Is for a'I costs the CONTRACTOR has incurred or may incur as a resu't of or relating to the changes in the scope orwork w!rether said costs are known, unknown, foreseen, or unforeseen at this time, fnr ud�'ng v: ithout limitation, any cast for deray, exteided Merbead, ripple or Impact costs, or any other effect on changed oru uncharged work as a result or this Change Order. The compensation is for fully compete and in-place construction. The actual quantities of items InstaCed or constructed have been measured and the quantities herein are adjusted aocordingiy. !Z t` Approved By. st' N O d- a Jerry L. Hadoe, Director of Publ-,c Woks ?.ppra ed By. ;_i� Cont