HomeMy WebLinkAboutItem 09 - Batch Plant Dove Road ImprovementsMEMO TO
FROM:
MEETING DATE:
SUBJECT:
RECOMMENDATION:
ITEM R _ q
HONORALBE MAYOR AND MEMBERS OF THE
CITY COUNCIL
ROGER NELSON, CITY MANAGER
FEBRUARY 17, 2004
BATCH PLANT — DOVE ROAD IMPROVEMENTS
Staff recommends Council approve a request to locate a temporary concrete
batch plant at 750 Shady Brook Drive, Block 3, and Grapevine Service Center
Addition.
BACKGROUND INFORMATION:
The applicant JLB Contracting, LP, is requesting a temporary concrete batch
plant to be located on the northeast of the wastewater treatment plant to operate
from March 1, 2004 through August 31, 2004. The applicant is requesting to
operate the batch plant Monday through Friday 7:00 a.m. to 7:00 p.m. and
Saturdays 9:00 a.m. to 5:00 p.m.
01/30/2004 03:15 8174103003 PW ENGINEERING PAGE 02
1. Applicant
CITY OF GRAPEVINE
Name j L- d c.oI c
Address too--p-V-
Phoneno.(2991 fax no. (8(-7) ZG t- 4¢--
2. Property owner
Name C , -,--y af- 6,2-I PC v.. �c
Address
Phone no. — fax no. —
3. Address of temporary use
4. Total nu tuber of off-street or highway parking space A P fo 2 4 r u.0 s
5. Description of temporary use,, e7,,, F-aQ,g,may co,,,C-R— -T-
—IOC_ e9 vI., G D0'-1 "' leo,4 0
6. Date or dates of proposed use - _ S 1 t 10'2 l . 1W _ �s, l � o lj
7. Time and hours of temporary use.tet c.•� t7.q �r 7o fie, brf > "1: oo Ate,
8. Please submit a detailed diagram of the proposed temporary use, site/plot plan or a plat showing
the proposed temporary use drawn to scale and dimensioned with other drawings as desired or
as requested by staff.
9. In the case of concrete mixing or batching plants for use during the construction of buildings or
public improvements for thirty (30) days or less may be approved by the Director of Development
Services. Concrete mixing or batching plants for use more than thirty (30) days shall require
approval by City Council.
CITY OF GRAPEVINE, DEVELOPMENT SERVICES, PC BOX 95104, GRAPEVINE, TEXAS 76099 (817)410-3154 FAX(817)410-3016
11
(property owner)
hereby authorize JC 8 Cs„ -lee,,1;;,P (applicant)
to request a temporary use on property 1 own at
(address)."
Owner (print) —J=e rrc�
Owner signature
The State of L'X Gt'
-____.---
County of ��1 i,i z-tj
Before me [ )C��-Yi4r7 �_ _ �c>ti �-- on this day personally appeare j
Hr3cjae known to me (or proved to me on the oath c
or through (description of
identity card or other document) to be the person whose name is subscribed to the foregoing instrument
and acknowledged to me that he executed the same for the purposes and consideration therein
expressed.
Given under my haR " a1,pf office this day of -C- h , a. d. Ebc-d
seal z
otary signature
r F Of
CITY OF GRAPEVINE, DEVELOPMENT SERVICES, P 0 BOX 95104, GRAPEVINE, TEXAS 76099 (817)410-3154 FAX (817)410-3018
TR 3
6 207 AC
TR 3B1
13.45 AC
582AiB
TR 5B
2
2A1
TR
5B2A9 2p
TR5 �"
12 _ 2A2
1� -XI-11,
TR 3 48
.465 tRI
EN
Jr TR 3A TR 4 M 47
y 3.889 AC 3.182 AC
5 6
x R=7 5 5
TR 5B2LA
12 Al `i
TR 5B 6.13 AC
9.392
TR 5B2A
E
;:.
17
TRS •^•
U
PRD -12
TR 5H3
5.13 AC
TR 5H2
3.0 AC
R -MF --2
TR 5H7
3.57 AC
16�Z AM
77
77 ACC
Z 2
n7.74 AC
TR 5J2
1.01 AC L Z
TR SK m
9,13R -MH
Al C
-i
G.�,AAC PRIVATE I R
Q�� P R /
9� TR 14A1
3 A_ 3.0 AC
0
1 inch equals 300 feet
671, R-7.5
61
-5.01-
4
44 6
AM?41
43 1 421 41
30 31 1 32 33 34
29 28 1 27 1 28 1 25
22 21
40 119
118
17 i6
l
1
3.32 AC
1
g �1 7
M S R=7.'5
5
CT -�
R-3.75. 6
GU TR 1 4
5 AC 2�4
6 2 3
6
1 2 R7'MF-1 FR
1TR
6
Batch Plant
750 Shady Brook Dr
1007 HARRISON AVENUE, ARLINGTON, TEXAS 76011
METRO (817) 261-2991 FAX (817) 261-3044
November 24, 2003
City of Grapevine
200 S. Main Street
Grapevine, Texas 76051
Re: Temporary Concrete Bach Plant Site and Process
Dove Road Construction Project, Grapevine, Texas
Our concrete batching plant is a potable unit that meets your requirements for a temporary concrete
plant site. The site usually occupies 1 to 2 acres. The site has 2 aggregate stockpiles, a radial stacker
conveyor, the batching plant itself including the air pollution equipment.
The material from the stockpiles is moved from the stockpile to the radial stacker by a front end loader.
The radial stacker dumps the aggregate into bins above the plant. The aggregate is then dropped into
a weight hopper and then fed onto a conveyor belt that feeds into the transit mix truck.
Cement is pumped into a storage silo for cement transport trucks. Cement is augured into a weight
hopper and then dropped into the transit mix truck. Water is metered into the truck during the loading
of the aggregate and cement.
There is a shroud around the loading area of the ready mix trucks where any dust is drawn into the bag
house.
For this plant site, the proposed hours of operation will be Monday — Friday 7:00 am to 7:00 pm, and
Saturday 9:00 am to 5:00 pm.
The facility will be located North of the Scribner Street and Shady Brook Drive intersection, along the
Dove Road construction project (approx. construction station 129+50). The site is contiguous to the
right of way for the construction project and is owned by the City of Grapevine. Upon your acceptance
of this site for the use of setting up our portable batch plant, we will submit and obtain all applicable
permits from the Texas Commission on Environmental Quality prior to performing any work.
As this construction project will comprise of numerous paving phases, we will only be utilizing this site
while paving. The portable plant shall be removed from the site between phases. We will coordinate
all of the move -ins and the paving schedule with the Public Works Department.
I have included a detailed plan view of the portable plant for your reference.
If you have any questions or concerns, please feel free to contact me at (817) 261-2991.
Thank you for your time and consideration in this matter.
Sincerely,
James Humphrey
JLB CONTRACTING, LP
1007 HARRISON AVENUE, ARLINGTON, TEXAS 76011
METRO (817) 261-2991 FAX (817) 261-3044
January 30, 2004
City of Grapevine
200 S. Main Street
Grapevine, Texas 76051
Dear Sir or Madam
Please find the attached Temporary Land Use Permit Application for the use of City of Grapevine land
for a portable concrete batch plant.
The proposed site and plant will be used solely for the purpose of supplying concrete for the paving of
Dove Road. The proposed site is immediately adjacent to the Dove Road construction project.
I have included detailed plots of the surrounding area, including dimensions to the adjacent properties.
I have also attached a letter presented to the Department of Public Works outlining our proposal for the
use of this property.
An application has been submitted and accepted by the Texas Commission on Environmental Quality
for the site. We should be receiving the approved permit any day. Upon receipt of the permit, I will
forward it to the City of Grapevine for your records.
If you have any questions or concerns, please feel free to contact me at (817) 261-2991.
Thank you for your time and consideration in this matter.
Sincerely,
Sam Davis
ss •. ® r
1.49.
1 1.70 1
w
♦ —3
�j ff-6.
5.0 5.21 I a,
IS" 7!
I° LOT "4
- I F-4
0.70 ,• i
- 5.07 —
"
VEGETATIOcr \ �""
(�1 ITS
O j C�ticetTt
STgckdk w r
AL
'.3\4
CIO
r
Er13r at
ry �7v.�p S'Ili d
( goo, F -6i
o.47
50 {o' 4.96 I
T \\
J r.
T( T FeoPE2 `r'uNE
I�' I
F-7
S
0.75
71 1 " E J T
INT 6.70 1 I