Loading...
HomeMy WebLinkAboutItem 34 - Final PlatMEMO TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL, AND THE PLANNING & ZONING COMMISSION FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE APRIL 16, 2024 SUBJECT: FINAL PLAT APPLICATION LOT 1, BLOCK 1, FAITHFUL AND TRUE ADDITION PLAT APPLICATION FILING DATE..............................................................April 9, 2024 APPLICANT........................................................................................ Leland Pennington REASON FOR APPLICATION ..................................... Final platting property for a home PROPERTY LOCATION.......................................................................... 2910 Parr Lane ACREAGE................................................................................................................ 17.01 ZONING................................................................................................................. R-20.0 NUMBER OF LOTS .................................................. One (1) Single Family Resident Lot PREVIOUS PLATTING.................................................................................................No CONCEPTPLAN..........................................................................................................No SITEPLAN....................................................................................................................No OPEN SPACE REQUIREMENT.................................................................................. Yes AVIGATION RELEASE............................................................................................... Yes PUBLIC HEARING REQUIRED....................................................................................No C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc PLAT INFORMATION SHEET FINAL PLAT APPLICATION LOT 1, BLOCK 1, FAITHFUL AND TRUE ADDITION I. GENERAL: • The applicant, Leland Penington is platting 17.01 acres into one (1) single family residential lot. Property is located at 2910 Parr Lane. II. STREET SYSTEM: • The development has access to Parr Lane. • Abutting roads: ❑ is on the City Thoroughfare Plan: ® are not on the City Thoroughfare Plan: Parr Lane • Sidewalk & curb: ® Developer required to build sidewalk & curb along Parr Lane ❑ Curb, gutter and sidewalk exist across the frontage of this lot. ❑ Periphery Street Fees are due as follows: Type of Roadway Cost / LF Length Cost ❑ Major Arterial (A) $ 234.57 / LF ❑ Major Arterial (B) $ 178.35 / LF ❑ Minor Arterial (C) $ 203.06 / LF ❑ Minor Arterial (D) $ 170.33 / LF ❑ Collector (E) $ 170.33 / LF ❑ Collector (F) $ 150.98 / LF ❑ Sidewalk $ 25.00 / LF ❑ Curb & Gutter $ 15.00 / LF ❑ Periphery Street Fees are not due: C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc III. STORM DRAINAGE SYSTEM: • The site drains north to Big Bear Creek. • The developer will be required to design for onsite as well as offsite drainage in accordance with the requirements of the City of Grapevine's Code of Ordinances. IV. WATER SYSTEM: ® The existing water supply system bordering the subject site is adequate to serve the development. ❑ The existing water supply system bordering the subject site is not adequate to serve the development. Additional off site water system improvements will be necessary to loop water service to serve the site. V. SANITARY SEWER SYSTEM: ® The existing sanitary sewer collection system bordering the subject site is adequate to serve the development. ❑ The existing sanitary sewer collection system bordering the subject site is not adequate to serve the development. Owner has submitted construction plans to extend sanitary sewer to this property. VI. MISCELLANEOUS: ❑ Water and Wastewater Impact Fees are not required for: ® Water and Wastewater Impact Fees are due prior to the issuance of building permits for: Lot 1, Block 1, Faithful and True Addition ® Single Family Residential ( $ 2,388/ Lot) ❑ Multifamily ( $ 1,049/ Unit) ❑ Hotel ( $ 43,606/ Acre) ❑ Corporate Office ( $ 20,572/ Acre) ❑ Government ( $ 4,426/ Acre) ❑ Commercial / Industrial ( $ 5,670/ Acre) C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc ❑ Open Space Fees are not required for: ® Open Space Fees are due prior to the preconstruction meeting for public infrastructure improvements for: Lot 1, Block 1, Faithful and True Addition ❑ R-5.0, R-TH, Zero Lot District ( $ 1,416.00 / Lot) ❑ R-7.5, Single Family District ( $ 1,146.00 / Lot) ❑ R-12.5, Single Family District ( $ 1,071.00 / Lot) ® R-20.0, Single Family District ( $ 807.00 / Lot) ❑ Public Hearing Only ❑ Variances were required on the following items: ❑ Front & Rear building lines ❑ Allowing a setback of 3 feet for the rear property line for an accessory building ❑ Lot width & depth; ❑ Max. Impervious Area ❑ Landscaping Regulations, allowing no landscape buffer between the edge of the parking area and the adjacent property line. ❑ The following items associated with this plat are not in accordance with the current subdivision standards: ❑ 50' ROW dedication not met: ❑ Length of cul-de-sac street exceeds the 600-foot limit: ❑ Driveway Spacing not met. C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc VII. STATEMENT OF FINDINGS: A. The City has determined that the right-of-way and easements required to be dedicated for streets, utilities, drainage, access, sidewalks and other municipal needs and services are consistent with the City's ordinances and master plan, are reasonable and are connected to the proposed project in the following manner- ® The right-of-way provides for future widening of public streets that will serve the development of this site. ® The onsite utility easements provide for a utility network to serve the development of this site. ® The onsite drainage easements provide for a drainage network to serve the development of this site. ❑ The onsite access easements provide cross access capabilities to this site and surrounding property. ❑ The onsite sidewalk easements provide for a sidewalk network to serve the development of this site. B. The City further finds that the required dedication is related both in nature and extent to the impact of the proposed development as follows: ® The right-of-way is necessary to provide for future widening of public streets that will serve the development of this site. ® The onsite utility easements are necessary to provide for a utility system to serve this development and connect to existing utilities on surrounding property. ® The onsite drainage easements are necessary to provide for storm drainage improvements to serve the development of the site. ❑ The onsite access easements are necessary to provide cross access capabilities to this site and surrounding property. ❑ The onsite sidewalk easements are necessary to provide for a sidewalk network to serve the development of this site. C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc ® All of the dedications benefit the development to at least the extent of the impact of such on the development. VIII. RECOMMENDATION: The members of the City Council and The Planning & Zoning Commission consider the following motion: "Move that the City Council (Planning and Zoning Commission) approve the Statement of Findings and the Final Plat of Lot 1, Block 1, Faithful and True Addition" C:\Users\tbrooks\Downloads\Agenda Memo 273199.doc