Loading...
HomeMy WebLinkAboutItem 07 - Design Municipal Golf CourseITEM MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL I FROM: ROGER NELSON, CITY MANAGERke MEETING DATE: MARCH 18, 2003 SUBJECT: AWARD OF DESIGN/BUILD CONTRACT FOR GRAPEVINE MUNICIPAL GOLF COURSE MAINTENANCE FACILITY AND CHEMICAL STORAGE BUILDING RECOMMENDATION: City Council to consider award of Part II of the Design/Build agreement for the construction of the Grapevine Golf Course Maintenance Facility and Chemical Storage Facility in the amount of $344,968.26, authorize staff to execute said contract and take any necessary action. FUNDING SOURCE: Budget: Part II Design Construction Cost (GMP) D/B Overhead & Profit Additional Services Reimbursable Services TOTAL $ 17,866.75 5.2% 297,779.18 86.3% 23,822.33 6.9% 3,000.00 0.9% 2.500.00 0.7% $ 344,968.26 100.0% The funds for the construction of these two facilities are available in the Lake Enterprise Tax Note Series 2002 Fund, Account 210-48840-341-3. It should be noted that the contract for this project establishes a Guaranteed Maximum Price (GMP) for this project at $297,779.18. Should the Design/Builder find a means to construct the aforementioned facilities (with the concurrence of the City staff) in a more cost effective manner resulting in a lower actual construction cost than the Guaranteed Maximum Price (GMP), the savings will be allocated to the City and the Design/Builder based upon a 70-30 % split, respectively. March 11, 2003 (9:58AM) 0 BACKGROUND: As part of the ongoing improvements to the Grapevine Municipal Golf Course, the Master Plan calls for the construction of a Maintenance Facility as well as a chemical storage facility. The maintenance facility will be approximately 4,000 square feet and the chemical storage facility will be approximately 288 square feet. These facilities will be located just north of the existing maintenance facility at the course. Mr. Ken Foreman of Construction Management Services worked with the staff to develop a design criteria package, which will meet the needs of the Golf Course staff. Requests for Qualifications were advertised and Statements of Qualifications were received. Subsequently, interviews of 3 Design/Build firms were conducted. From those interviews, T.W. Foster Contractors, Inc. was chosen by the Selection Committee as the Design/Build Team with which we would undertake the negotiation process. T.W. Foster, Inc. is the same firm, which recently completed construction of the Grapevine Public Library. On December 26, 2002, the City Of Grapevine entered into Part 1 of a Design/Build Contract with T.W. Foster, Inc. for the construction of these aforementioned facilities. The work under the Part I agreement provided coordination between the Design/Builder and the staff to further develop the concept plan and to confirm that the project will meet all regulatory requirements. In addition, it provided the City with a project budget, which was needed in order to establish the Guaranteed Maximum Price. The work under the Part I agreement is complete and final design will commence pending approval of Part II of the agreement. Final design and construction is anticipated to be complete in 150 calendar days from the authorization of the Part II agreement. This is the first time the City Of Grapevine has used the AIA Design/Build Contract. This process is being utilized because staff believes that for this project a more cost-effective product can be obtained using this method over the traditional Design -Bid -Build method of construction. The City Attorney's Office has reviewed these contracts and recommends approval. Staff recommends award. March 12, 2003 (10:11 AM)