HomeMy WebLinkAboutItem 08 - 2003 Utilities ProjectMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER _ '
MEETING DATE: MAY 6, 2003
SUBJECT: ENGINEERING SERVICES CONTRACT — 2003 UTILITIES
PROJECT
RECOMMENDATION:
City Council consider awarding an Engineering Services Contract to Pacheco Koch
Consulting Engineers for the design of the 2003 Utilities Project in an amount not to
exceed $147,000.00, authorize staff to execute said contract, and take any necessary
action.
FUNDING SOURCE:
Funds are available as follows:
Funding Source
Account
Amount
Award
Percent
95 Utility Bonds
200-48930-534-1-000012WA
$123,834.65
11.3%
96 Utility Bonds
200-48930-534-2-000003WA
$354,458.35
32.2%
99 Utility Bonds
200-48930-534-5-000003WA
$120,000.00
10.9%
W Impact Fees
200-48930-534-6-000007WA
$188,000.00
$147,000.00
17.1%
WW Impact Fees
200-48940-536-6-000006SW
$313,707.00
28.5%
TOTAL
$1,100,000.00
$147,000.00
100%
Budget
Amount
Award
Percent
Engineering
$150,000.00
$147,000.00
13.6%
Right -of -Way
$50,000.00
4.6%
Construction
$750,000.00
68.2%
Contingency
$150,000.00
13.6%
TOTAL
$1,100,000.00
$147,000.00
100%
BACKGROUND:
The project includes the construction of water and wastewater lines at six locations
across the City. We have combined these six locations into one project to provide a
more cost efficient design package and a more attractive bid package for contractors.
April 30, 2003 (1:34PM)
The individual project locations are:
• Glade Road Wastewater Extension — From Euless Grapevine Road east to an
existing line connecting to the Big Bear TRA Trunk Line on the east side of SH 360.
• O'Dell Court Wastewater Extension — Construction of a wastewater collection system
in the O'Dell court area to enable the residents to discontinue use of septic tanks.
• Hughes Road Wastewater Collector — From the Hughes Road @ Euless Grapevine
Road intersection extending east across SH 360 to the Big Bear TRA Trunk Line.
• Heritage Avenue Water Distribution Line — From Mustang Drive north to SH 26
• Parr Lane Distribution Line — Connecting four waterlines in the area of Heritage Ave
and Big Bear Creek to complete the system in the southern part of the City.
• Ruth Wall / Bushong Distribution Line — Extending a waterline parallel to Bushong
Drive from Ruth Wall Road to Dooley Street.
With the exception of O'Dell Court, the individual projects are listed on the latest Water
and Wastewater Impact Fee program and are scheduled for construction in the 2004
time frame. O'Dell Court represents an opportunity to improve the City Wastewater
system and meet the continued demand for wastewater service to undeveloped lots in
the subdivision.
Staff recommends approval.
JSL
0:\AGENDA\5-6-03\ ENGR CONTRACT 2003 Utilities
April 30, 2003 (1:33PM)
7 IN I ME I I NA EN
1mi
Mr. Stan Laster, P.E. `----
AaSisbant Director ofPublic Works
CITY OF GRAPEVINE
P.O. Box 95104
Guapevine, Texas 70051
.2O03(Revised)
2377{3D94 � )
Re: Professional Civil Engineering & Land Surveying SanviCgS
FY 2004 UTILITY BOND PROJECTS
J4 Grapevine, Tarrant County, Texas
Dear Mr. Laster:
Pacheco Koch Consulting Engineers, Inc. is pleased to submit this proposal to
provide professional engineering and land surveying services relating tothe referenced
project. The project consists Of new water or wastewater main construction at six (0)
separate locations inGrapevine, Texas. Those locations are generally described as:
Glade Road SewerExtension— 2000 Lf. Of10-inch wastewateGi from Euless
Grapevine Road north of Glade Roud, across private property, toanexisting
main located along the west side ofState Highway 3OO.
Herita.ge Avenue Distribution Line — 4OO|f.of12-|nChwater main from the aO
existing main onthe north side of Mustang Drive atHeritage Avenue, aorOae
private property, tOanexisting stub -out Onthe south side OfState Highway 268t
Kimball Street.
Hughes Road TRA Wastewater Collector— 150Uif.Of12-iDChwastewater main
from Hughes Road, west OfEuless Grapevine Road, along existing public right-
of-way to the existing TRA Big Bear Wastewater Trunk Line east Of State
Highway 360.
Parr Lane —16OO|.f.Of12'inChvv8t8rDlaiDg8nar8Uyalong the
future ---- alignment ofHeritage Drive toconnect existing mains located north and
south ofBear Creek along with 2G0O|.f.of12-inohwater main from the existing
main located in Parr Lane, oC[OaS private property to an existing main on the
west side of State Highway 121 at Stone Meyers Parkway.
Ruth Wall / Bushong Distribution Line — 2400 |f f 8 -inch water main in the
—Bushong ------�Road right'Of'w8yfrom anexisting main 0nthe east side OfN.Dooley
Street tOaDexisting main Onthe west side OfRuth Wall Street.
Sewer Extension — 1680 |.f. Of 6 -inch wastewater main in [}'[}a||
-----�i ti i located tth �h8aS�:Orn8rofth�8ddidOn
(�nu�t0�neXG Dgrn�n�the .
TOdate vvehave received Bkey map indicating the locations Dfthe referenced projects,
construction and engineering cost estimates and copies of City of Grapevine Water and
Sanitary Sewer hey maps. The estimated construction OOS\ provided by the City is
$954.544. Utilizing curves ofmedian compensation published bythe Texas Society of
Professional Engineers and bythe American Society OfCivil Engineers, the fee for basic
design aen/ioeS should be 7.60% or $ 72.545. Our prOpOSo| is consistent with that
amount. Please note that Pacheco Koch has not prepared anindependent opinion of
probable construction cost for this project.
Mr. Stan Laster, P.E.
April 22, 2003
Page 2
It is our understanding that a Storm Water Pollution Prevention Plan that will satisfy all applicable
requirements of the Environmental Protection Agency will be prepared by others. Based on that
information, those items have not been included in this proposal and Pacheco Koch assumes no
liability related to same.
SCOPE OF SERVICES
Based on our preliminary discussions and review of the information received to date, the following is
our perception of the services to be provided by Pacheco Koch for the referenced project:
Basic Services:
DESIGN PHASE
WATER PLANS: Pacheco Koch will prepare construction plans and details for proposed
water mains, fire hydrants, valves and other appurtenances. it is anticipated that these
plans will be prepared at a scale of 1"=40' unless greater detail is required due to site
features. This item includes coordination of City review and approval of these plans.
This item also includes coordination with D/FW International Airport to obtain their
approval of the Heritage Avenue project.
■ WATER PROFILES: Pacheco Koch will prepare profile sheets for proposed water mains
that will be 12 -inches in diameter or larger. These sheets will provide vertical design
information for the mains described above. It is anticipated that these sheets will be
prepared at a horizontal scale of 1 "=40' and a vertical scale of 1 "=5'. This item includes
coordination of review and approval of these plans.
• SANITARY SEWER PLAN& PROFILES: Pacheco Koch will prepare construction plans
and details for proposed sanitary sewer mains, manholes, cleanouts and other
appurtenances. The connection points will be as directed by the City. It is anticipated
that these sheets will be prepared at a horizontal scale of 1 "=40' and a vertical scale of
1 "=5'. This item includes coordination of City review and approval of these plans.
• BID PHASE SERVICES: Pacheco Koch will assist the City in solicitation of bids from
contractors to complete the work included in the project. During the Bid Phase, Pacheco
Koch will be available to attend a Pre -Bid Conference and to provide coordination as
required with prospective bidders. After the bid opening, a Bid Tabulation of the bids
received will be provided to the City. A written recommendation regarding award of the
construction contract will be provided to the City after a review of the apparent low
bidder's qualifications and references.
CONSTRUCTION PHASE
CONSTRUCTION PHASE SERVICES: Pacheco Koch will be available to attend project
coordination meetings during construction as requested by the City. Those meetings
could include: Pre -Construction Conference, Substantial Completion Walk -Through,
Final Completion Walk -Through, and periodic visits to the construction site to monitor
progress of the construction and to check for general compliance with the construction
documents. This shall not be construed as performing continuous construction
inspection. Pacheco Koch will also be available to review submittals from the contractor
that are required for this project and related to the civil site improvements. Those
submittals could include Contractor's Application for Partial Payment and Final Payment,
shop drawings, product data, mix design, etc. Submittals not required by the contract
documents will not be reviewed.
Mr. Stan Laster, P.E.
April 22`28O3
Page
RECORD DRAWINGS: Based on project construction records, maintained and provided
by the Contractor (or by the City), Pacheco Koch will prepare final Record Drawings for
the project. These drawings will rely solely on the information provided to Pacheco Koch
by others, Field verification of actual construction is not included in this item.
Special Services
DESIGN SURVEY: Pacheco Koch will perform an on the ground survey for each Cf the
project sites under the direct supervision of a Registered Professional Land Surveyor. The
survey will include location of permanent improvements, spot elevations on 50 -foot intervals,
contours on one foot intervals, top of curb and gutter elevations for paving, locations of trees
over 6 -inches in caliper, location of visible utilities and appurtenances, and the location and
sizes of underground utilities based on available record information. Horizontal and vertical
control monuments shall be provided at both ends of each project segment, and, if feasible,
will bebased Onthe established City coordinate system.
EASEMENT DOCUMENTS: Pacheco Koch will prepare separate instrument dedication
documents for water and sanitary sewer easements as required. These documents will
include dedication statements, survey exhibits and metes and bounds descriptions for each
permanent easement. These easements will also include anadditional area for construction
operations that will expire upon completion of the project.
TxDOT P�Ch8C� Koch vvi|| coordinate the |OC@| district Ofth8TgX8S
.
Department of Transportation (TxDOT) to obtain approval of proposed construction in their ~ �
right-of-way. It is assumed that this item shall only apply to the Hughes Road project.
WETLAND DELINEATION: Pacheco Koch will provide 8nidentification Ofwetland areas in
proximity to the proposed construction based on review of existing technical resources (i.e.,
soil survey, National VV8t|8Od Inventory maps, topographic nnepS, and available digital
orthophotography\ and field verification of maps prior to delineation field efforts. Field
surveys will be conducted to identify all jurisdictional waters of the United States, including
wetlands, in accordance with the USACE 1987 Wetland Delineation Manual. All potential
jurisdictional sites identified will be accurately mapped on field nl8pS.
design iU work with the City to avoid and
minimize impact to waters of the United States. This will occur through a coordination
meeting to interpret the wetland delineation map as it relates to required permits. This
coordination task is important because the results will determine the type of Section 404
permit the project will qualify for or will be applying for — Nationwide Permit (NWP) 12 —
Utility Line Activities or Regional General Permit (RGP) 2 — Utility Lines and Outfall and
Intake Structures.
SECTION 404 PEPMIT APPLICATION: If the project is eligible for NVVP 12 without
notification, Pacheco Koch will provide aletter report documenting the wetland delineation,
avoidance and nninirniZaUOne�n�Sused, and irnp8otanalysis dernonS1n3tinQthat the pn�8Ct
is qualified under the terms and conditions of the NVVP 12. If the City requests that the
USACE is notified and desires to have the USACE verify the project's eligibility under the
CVVA.the RGP2isrecommended for efficiency. Through professional experience, when
there is a requirement to notify the USACE, the USACE requires compensatory mitigation for
unavoidable impacts to waters Of the United StDteG, which would require developing a
conceptual mitigation design and approval from the USA[|E
Mr. Stan Laster, P.E.
April 22, 2003
Page 4
CONCEPTUAL MITIGATION DESIGN: If it is decided to proceed with the RGP 2, a
conceptual mitigation design will be required. After all coordination with the client and a
conceptual idea is developed, Pacheco Koch will provide a conceptual mitigation plan. This
mitigation plan will include an assessment of the resources impacted to ensure that these
functions and values are not lost, a description of the mitigation to be implemented, an
assessment on how this mitigation will offset the functions and values of the proposed
impacted resources, and design details. Conceptual design details include location, area,
depth of depression (if necessary), species composition, planting densities, and mitigation
monitoring program.
PROTECTED SPECIES HABITAT EVALUATION: This effort will include coordinating with
USFWS and Texas Parks and Wildlife to determine the species listed in Tarrant County,
habitat surveys for listed protected species and a report presenting the findings of the
surveys. Research of available data will determine the listed species and their preferred
habitat. Species-specific surveys will not be covered in this scope of services, since they
require substantial time throughout particular seasons using specific protocols. Habitat
surveys are designed to determine whether the site contains preferred protected species
habitat and the likelihood of the presence of that species. Included in this item is a brief
letter report summarizing the results of the survey, describing the habitats present on the
site, the protected species that are listed in Tarrant County and their preferred habitats, and
an evaluation of whether or not this preferred habitat is present on the site.
Based on our understanding of the scope of services, the following items are not included in this
proposal: (1) Geotechnical Investigation, (2) Construction Staking, (3) Construction Inspection.
Pacheco Koch proposes to provide the services described above on a Fixed Fee basis for a total
fee as follows:
Basic Services:
DESIGN PHASE
$
60,000.00
■ Water Plans
■ Water Profiles
• Sanitary Sewer Plan & Profiles
• Bid Phase Services
CONSTRUCTION PHASE
$
10,000.00
■ Construction Phase Services
■ Record Drawings
Sub -Total (Basic Services)
$
70,000.00
Special Services:
DESIGN SURVEY
$
58,000.00
EASEMENT DOCUMENTS (Est. 19 @ $500.00%a.)
$
9,500.00
TxDOT PERMIT
$
1,000.00
WETLAND DELINEATION
$
1,000.00
PERMITTING COORDINATION'
$
750.00
SECTION 404 PERMIT APPLICATION*
$
3,000.00
CONCEPTUAL MITIGATION DESIGN*
$
2,750.00
PROTECTED SPECIES HABITAT EVALUATION
$ 1,000.00
Sub -Total (Special Services)
$
77,000.00
*If required TOTAL
$
147,000.00
Mr. Stan Laster, P.E.
April 22.2003
Page
Usual and customary reimbursable expenses incurred will be recouped through a Purchase Price
established for construction plans obtained bvprospective bidders.
Please note that the fees above are based on the assumption that Pacheco Koch will perform the
above services all together for this project with the exception of any items noted as "if required." |n
the event any Other item is deleted from the scope of vvOrk. Pacheco Koch reserves the right to
adjust the fees for other items aSappropriate.
SCHEDULE
Pacheco Koch aOkOOVv|edg8S the importance to City of Grapevine of the project schedule and
agrees to put forth its best professional efforts to perform its services under this Agreement in a
manner consistent with that schedule. City of Grapevine understands, hDvveV8[^ that Pacheco
KoCh'S parfOrnO8nCa must be governed by sound professional practices. If requested, Pacheco
Koch would be pleased to develop a project schedule outlining each of the items included previously
described inthe Scope odServices.
SUMMARY
This proposal, unless otherwise noted, constitutes our understanding of the services to be provided
by Pacheco Koch Consulting Engineers, Inc. onthe project described abov8. This ppOpOSa| is
offered for period Ofthirty (3O) days after which, if said pKJpn38| has not been executed, said
proposal should OOlonger bevalid.
Pacheco Koch Consulting Engineers, Inc. is pleased to have this opportunity to submit this
proposal and look forward to working with you on this project. If the proposal and
accompanying agreement is acceptable to you as presented, please execute one copy cdthe
agreement form and return one original copy toour office. |fyou have any questions Orwould like
any8ddidOna|infornl8UOn'p|eoeedoOoth8aitatetooa||uS8tyouroonv8nien
Sincere
Mark A.Pacheco/ P.E, R.P.L8.
NAP/as
O1 -395O
Staff recommends renewal of contracts to Shred -Tech as primary contractor and Airport
Sand and Gravel as secondary contractor for these services.
M
April 25, 2003 (4:34PM)
Todays Date: 02128/2002
CITY OF GRAPEVINE
Bid 121-2002 Material Disposal - Annual Contract
BFI Waste SXstems
Waste
Management of No.
TX
Truckload (7 Cu Yd) Disposal of Asphalt,
Airport Sand ar
Gravel
EA
Concrete, Dirt, etc.
Total Prid-4i"'!,
Truckload (16 Cu Yd) Disposal of Asphalt,
2 1
EA
Concrete, Dirt, etc.
$240.00
$80,00.
Truckload (22 Cu Yd) Disposal of Asphalt,
3 1
EA
lConcrete, Dirt, etc.
$22.00
$40.00
Truckload (7 Cu Yd) Disposal of Brush or
4 1
EA
Buildinq Debris
$80.00
1
$80.00
Truckload (16 Cu Yd) Disposal of Brush or
5 1
EA
Buildina Debris
BFI Waste SXstems
Waste
Management of No.
TX
Se o, Inc.
Airport Sand ar
Gravel
P,
Total Prid-4i"'!,
$105.00
$35.00
$7.00
$15.00
$240.00
$80,00.
$16,00
$20,00
$330,00
$110-00
$22.00
$40.00
$35.00
$35.00
$35.00
No Bid
$80.00
1
$80.00
$80.00
No Bi
$75.00—
Total ... ....................................................... $790.00 $340.00 $160.00
Bid Summary: Total Bid
Sego, Inc $160.00
Waste Management $340.00
BFI Waste Systems $790.00
Airport Sand and Gravel* $75.00