HomeMy WebLinkAboutItem 08 - 2003 Utilities Project ITEM ! MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER MEETING DATE: MAY 6, 2003 SUBJECT: ENGINEERING SERVICES CONTRACT — 2003 UTILITIES PROJECT RECOMMENDATION: City Council consider awarding an Engineering Services Contract to Pacheco Koch Consulting Engineers for the design of the 2003 Utilities Project in an amount not to exceed $147,000.00, authorize staff to execute said contract, and take any necessary action. FUNDING SOURCE: Funds are available as follows: Funding Source Account Amount Award Percent 95 Utility Bonds 200-48930-534-1-000012WA $123,834.65 11.3% 96 Utility Bonds 200-48930-534-2-000003WA $354,458.35 32.2% 99 Utility Bonds 200-48930-534-5-000003WA $120,000.00 10.9% W Impact Fees 200-48930-534-6-000007WA $188,000.00 $147,000.00 17.1% WW Impact Fees 200-48940-536-6-000006SW $313,707.00 28.5% TOTAL $1,100,000.00 $147,000.00 100% Budget Amount Award Percent Engineering $150,000.00 $147,000.00 13.6% Right-of-Way $50,000.00 4.6% Construction $750,000.00 68.2% Contingency $150,000.00 13.6% TOTAL $1,100,000.00 $147,000.00 100% BACKGROUND: The project includes the construction of water and wastewater lines at six locations across the City. We have combined these six locations into one project to provide a more cost efficient design package and a more attractive bid package for contractors. April 30, 2003(1:34PM) V v k The individual project locations are: • Glade Road Wastewater Extension — From Euless Grapevine Road east to an existing line connecting to the Big Bear TRA Trunk Line on the east side of SH 360. • O'Dell Court Wastewater Extension — Construction of a wastewater collection system in the O'Dell court area to enable the residents to discontinue use of septic tanks. • Hughes Road Wastewater Collector — From the Hughes Road @ Euless Grapevine Road intersection extending east across SH 360 to the Big Bear TRA Trunk Line. • Heritage Avenue Water Distribution Line — From Mustang Drive north to SH 26 • Parr Lane Distribution Line — Connecting four waterlines in the area of Heritage Ave and Big Bear Creek to complete the system in the southern part of the City. • Ruth Wall / Bushong Distribution Line — Extending a waterline parallel to Bushong Drive from Ruth Wall Road to Dooley Street. With the exception of O'Dell Court, the individual projects are listed on the latest Water and Wastewater Impact Fee program and are scheduled for construction in the 2004 time frame. O'Dell Court represents an opportunity to improve the City Wastewater system and meet the continued demand for wastewater service to undeveloped lots in the subdivision. Staff recommends approval. JSL 0:\AGENDA\5-6-03\ENGR CONTRACT 2003 Utilities April 30,2003(1:33PM) IA s • a APB 2 $ 2003 2003 (Revised) 2377-03.094 Mr. Stan Laster, P.E. Assistant Director of Public Works CITY OF GRAPEVINE P.O. Box 95104 Grapevine, Texas 76051 Re: Professional Civil Engineering & Land Surveying Services FY 2004 UTILITY BOND PROJECTS Grapevine, Tarrant County, Texas Dear Mr. Laster: Pacheco Koch Consulting Engineers, Inc. is pleased to submit this proposal to provide professional engineering and land surveying services relating to the referenced project. The project consists of new water or wastewater main construction at six (6) separate locations in Grapevine, Texas. Those locations are generally described as: Glade Road Sewer Extension—2000 Lf.of 10-inch wastewater main from Euless Grapevine Road north of Glade Road, across private property, to an existing main located along the west side of State Highway 360. Heritage Avenue Distribution Line— 2400 l.f. of 12-inch water main from the an existing main on the north side of Mustang Drive at Heritage Avenue, across private property, to an existing stub-out on the south side of State Highway 26 at Kimball Street. Hughes Road TRA Wastewater Collector-1500 I.f.of 12-inch wastewater main from Hughes Road, west of Euless Grapevine Road, along existing public right- of-way to the existing TRA Big Bear Wastewater Trunk Line east of State Highway 360. Parr Lane Distribution Line— 1600 I.f. of 12-inch water main generally along the future alignment of Heritage Drive to connect existing mains located north and south of Bear Creek along with 2600 I.f. of 12-inch water main from the existing main located in Parr Lane, across private property to an existing main on the west side of State Highway 121 at Stone Meyers Parkway. Ruth Wall/Bushong Distribution Line — 2400 I.f. of 8-inch water main in the Bushong Road right-of-way from an existing main on the east side of N. Dooley Street to an existing main on the west side of Ruth Wall Street. O'Dell Court Sewer Extension — 1680 l.f. of 6-inch wastewater main in O'Dell Court to an existing main located at the northeast corner of the addition. To date we have received a key map indicating the locations of the referenced projects, construction and engineering cost estimates and copies of City of Grapevine Water and Sanitary Sewer key maps. The estimated construction cost provided by the City is $954,544. Utilizing curves of median compensation published by the Texas Society of Professional Engineers and by the American Society of Civil Engineers,the fee for basic design services should be 7.60% or $ 72,545. Our proposal is consistent with that amount. Please note that Pacheco Koch has not prepared an independent opinion of probable construction cost for this project. tl • � • tltltl !. tl• / • • • 3 Mr. Stan Laster, P.E. April 22, 2003 Page 2 ,t It is our understanding that a Storm Water Pollution Prevention Plan that will satisfy all applicable requirements of the Environmental Protection Agency will be prepared by others. Based on that information, those items have not been included in this proposal and Pacheco Koch assumes no liability related to same. SCOPE OF SERVICES Based on our preliminary discussions and review of the information received to date,the following is our perception of the services to be provided by Pacheco Koch for the referenced project: Basic Services: DESIGN PHASE ■ WATER PLANS:Pacheco Koch will prepare construction plans and details for proposed water mains, fire hydrants, valves and other appurtenances. it is anticipated that these plans will be prepared at a scale of 1"=40' unless greater detail is required due to site features. This item includes coordination of City review and approval of these plans. This item also includes coordination with D/FW International Airport to obtain their approval of the Heritage Avenue project. ■ WATER PROFILES:Pacheco Koch will prepare profile sheets for proposed water mains that will be 12-inches in diameter or larger. These sheets will provide vertical design information for the mains described above. It is anticipated that these sheets will be prepared at a horizontal scale of 1"=40' and a vertical scale of 1"=5% This item includes coordination of review and approval of these plans. • SANITARY SEWER PLAN& PROFILES:Pacheco Koch will prepare construction plans and details for proposed sanitary sewer mains, manholes, cleanouts and other appurtenances. The connection points will be as directed by the City. It is anticipated that these sheets will be prepared at a horizontal scale of 1"=40' and a vertical scale of 1"=5'. This item includes coordination of City review and approval of these plans. • BID PHASE SERVICES: Pacheco Koch will assist the City in solicitation of bids from contractors to complete the work included in the project. During the Bid Phase, Pacheco Koch will be available to attend a Pre-Bid Conference and to provide coordination as required with prospective bidders. After the bid opening, a Bid Tabulation of the bids received will be provided to the City. A written recommendation regarding award of the construction contract will be provided to the City after a review of the apparent low bidder's qualifications and references. CONSTRUCTION PHASE • CONSTRUCTION PHASE SERVICES:Pacheco Koch will be available to attend project coordination meetings during construction as requested by the City. Those meetings could include: Pre-Construction Conference, Substantial Completion Walk-Through, Final Completion Walk-Through, and periodic visits to the construction site to monitor progress of the construction and to check for general compliance with the construction documents. This shall not be construed as performing continuous construction inspection. Pacheco Koch will also be available to review submittals from the contractor that are required for this project and related to the civil site improvements. Those submittals could include Contractor's Application for Partial Payment and Final Payment, shop drawings, product data, mix design, etc. Submittals not required by the contract documents will not be reviewed. Mr. Stan Laster, P.E. April 22, 2003 Page 3 • RECORD DRAWINGS:Based on project construction records, maintained and provided by the Contractor (or by the City), Pacheco Koch will prepare final Record Drawings for the project. These drawings will rely solely on the information provided to Pacheco Koch by others. Field verification of actual construction is not included in this item. Special Services DESIGN SURVEY: Pacheco Koch will perform an on the ground survey for each of the project sites under the direct supervision of a Registered Professional Land Surveyor.The survey will include location of permanent improvements, spot elevations on 50-foot intervals, contours on one foot intervals,top of curb and gutter elevations for paving, locations of trees over 6-inches in caliper, location of visible utilities and appurtenances, and the location and sizes of underground utilities based on available record information. Horizontal and vertical control monuments shall be provided at both ends of each project segment, and, if feasible, will be based on the established City coordinate system. EASEMENT DOCUMENTS: Pacheco Koch will prepare separate instrument dedication documents for water and sanitary sewer easements as required. These documents will include dedication statements, survey exhibits and metes and bounds descriptions for each permanent easement.These easements will also include an additional area for construction operations that will expire upon completion of the project. TxDOT PERMIT: Pacheco Koch will coordinate with the local district office of the Texas Department of Transportation (TxDOT)to obtain approval of proposed construction in their right-of-way. It is assumed that this item shall only apply to the Hughes Road project. WETLAND DELINEATION:Pacheco Koch will provide an identification of wetland areas in proximity to the proposed construction based on review of existing technical resources (i.e., soil survey, National Wetland Inventory maps, topographic maps, and available digital orthophotography) and field verification of maps prior to delineation field efforts. Field surveys will be conducted to identify all jurisdictional waters of the United States, including wetlands, in accordance with the USACE 1987 Wetland Delineation Manual. All potential jurisdictional sites identified will be accurately mapped on field maps. PERMITTING COORDINATION: The design team will work with the City to avoid and minimize impact to waters of the United States. This will occur through a coordination meeting to interpret the wetland delineation map as it relates to required permits. This coordination task is important because the results will determine the type of Section 404 permit the project will qualify for or will be applying for - Nationwide Permit (NW P) 12 — Utility Line Activities or Regional General Permit (RGP) 2 — Utility Lines and Outfall and Intake Structures. SECTION 404 PERMIT APPLICATION: If the project is eligible for NW P 12 without notification, Pacheco Koch will provide a letter report documenting the wetland delineation, avoidance and minimization efforts used, and impact analysis demonstrating that the project is qualified under the terms and conditions of the NWP 12. If the City requests that the USACE is notified and desires to have the USACE verify the project's eligibility under the CWA, the RGP 2 is recommended for efficiency. Through professional experience, when there is a requirement to notify the USACE,the USACE requires compensatory mitigation for unavoidable impacts to waters of the United States, which would require developing a conceptual mitigation design and approval from the USACE. Mr. Stan Laster, P.E. April 22, 2003 Page 4 r CONCEPTUAL MITIGATION DESIGN: If it is decided to proceed with the RGP 2, a conceptual mitigation design will be required. After all coordination with the client and a conceptual idea is developed, Pacheco Koch will provide a conceptual mitigation plan. This mitigation plan will include an assessment of the resources impacted to ensure that these functions and values are not lost, a description of the mitigation to be implemented, an assessment on how this mitigation will offset the functions and values of the proposed impacted resources, and design details. Conceptual design details include location, area, depth of depression (if necessary), species composition, planting densities, and mitigation monitoring program. PROTECTED SPECIES HABITAT EVALUATION:This effort will include coordinating with USFWS and Texas Parks and Wildlife to determine the species listed in Tarrant County, habitat surveys for listed protected species and a report presenting the findings of the surveys. Research of available data will determine the listed species and their preferred habitat. Species-specific surveys will not be covered in this scope of services, since they require substantial time throughout particular seasons using specific protocols. Habitat surveys are designed to determine whether the site contains preferred protected species habitat and the likelihood of the presence of that species. Included in this item is a brief letter report summarizing the results of the survey, describing the habitats present on the site, the protected species that are listed in Tarrant County and their preferred habitats, and an evaluation of whether or not this preferred habitat is present on the site. Based on our understanding of the scope of services, the following items are not included in this proposal: (1) Geotechnical Investigation, (2) Construction Staking, (3) Construction Inspection. COMPENSATION Pacheco Koch proposes to provide the services described above on a Fixed Fee basis for a total fee as follows: Basic Services: DESIGN PHASE $ 60,000.00 ■ Water Plans ■ Water Profiles • Sanitary Sewer Plan & Profiles • Bid Phase Services CONSTRUCTION PHASE $ 10,000.00 ■ Construction Phase Services ■ Record Drawings Sub-Total (Basic Services) $ 70,000.00 Special Services: DESIGN SURVEY $ 58,000.00 EASEMENT DOCUMENTS (Est. 19 @ $500.001ea.) $ 9,500.00 TxDOT PERMIT $ 1,000.00 WETLAND DELINEATION $ 1,000.00 PERMITTING COORDINATION* $ 750.00 SECTION 404 PERMIT APPLICATION* $ 3,000.00 CONCEPTUAL MITIGATION DESIGN* $ 2,750.00 PROTECTED SPECIES HABITAT EVALUATION $ 1,000.00 Sub-Total (Special Services) $ 77,000.00 *If required TOTAL $ 147,000.00 Mr. Stan Laster, P.E. April 22, 2003 Page 5 Usual and customary reimbursable expenses incurred will be recouped through a Purchase Price established for construction plans obtained by prospective bidders. Please note that the fees above are based on the assumption that Pacheco Koch will perform the above services all together for this project with the exception of any items noted as"if required." In the event any other item is deleted from the scope of work, Pacheco Koch reserves the right to adjust the fees for other items as appropriate. SCHEDULE Pacheco Koch acknowledges the importance to City of Grapevine of the project schedule and agrees to put forth its best professional efforts to perform its services under this Agreement in a manner consistent with that schedule. City of Grapevine understands, however, that Pacheco Koch's performance must be governed by sound professional practices. If requested, Pacheco Koch would be pleased to develop a project schedule outlining each of the items included previously described in the Scope of Services. SUMMARY This proposal, unless otherwise noted, constitutes our understanding of the services to be provided by Pacheco Koch Consulting Engineers, Inc. on the project described above. This proposal is offered for a period of thirty (30) days after which, if said proposal has not been executed, said proposal should no longer be valid. Pacheco Koch Consulting Engineers, Inc. is pleased to have this opportunity to submit this proposal and look forward to working with you on this project. If the proposal and accompanying agreement is acceptable to you as presented, please execute one copy of the agreement form and return one original copy to our office. If you have any questions or would like any additional information, please do not hesitate to call us at your convenience Sincerely Mark A. Pacheco, P.E., R.P.L.S. MAP/as 01-3956 rJ V , r r f l;. 4 i O h w i I 1 2003 UTILITIES Staff recommends renewal of contracts to Shred-Tech as primary contractor and Airport Y� Sand and Gravel as secondary contractor for these services. ,? Ot CD �i April 25,2003 (4:34PM) Todays Date: 02/28/2002 i CITY OF GRAPEVINE Bid Tabulation Form Bid 121 2002 Material Disposal-Annual Contract ""'we � s < a.;4u, .1.. n 4. s. �b?k`�'" §E„v�;*. s yp' [ �k `� '� �`k. `,:I �e a Waste Management of No. Airport Sand ar VENDORS............................................. BFI Waste S stems TX Se o, Inc. Gravel ##L4 see t Y•�° �+ �. , " `` �yisr.a�r , 1 1 Its '4- 2tr1< � W.i. �'� ti A .'1 �n ice 3`ritat Mace., . �. . otaE Pace ,.�. Truckload (7 Cu Yd)Disposal of Asphalt, 1 1 EA Concrete, Dirt, etc. $105.00 $35.00 $7.00 $15.00 Truckload (16 Cu Yd)Disposal of Asphalt, 2 1 EA Concrete, Dirt, etc. $240.00 $80.00 $16,00 $20,00 Truckload (22 Cu Yd)Disposal of Asphalt, 3 1 EA Concrete, Dirt, etc. $330,00 $110.00 $22.00 $40.00 Truckload (7 Cu Yd)Disposal of Brush or 4 1 EA Building Debris $35.00 $35.00 $35.00 No Bid Truckload (16 Cu Yd)Disposal of Brush or 5 1 EA Buildin2 Debris $80.00 $80.00 $80.00 No Bid Total................................................................ $790.00 $340.001 $160.00 $75.00 � Bid Summary: Total Bid Sego, Inc $160.00 Waste Management $340.00 BFI Waste Systems $790.00 Airport Sand and Gravel* $75.00 *Incomplete Bid