HomeMy WebLinkAboutItem 05 - Dove Loop Construction Project - Geotechnical ServicesMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION: STEM1P _, �rMMMMMOMM HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL ROGER NELSON, CITY MANAGER/%/ JUNE 3, 2003 DOVE LOOP CONSTRUCTION PROJECT — AWARD OF GEOTECHNICAL SERVICES CONTRACT City Council consider awarding the Dove Loop Construction Project Geo -technical Services Contract to CMJ Engineering, Incorporated in an amount not to exceed $156,017.40, authorize staff to execute said contract, and take any necessary action. FUNDING SOURCE: Funds are available as follows: Funding Source Account Amount Award Percent Peripheral Street Fees 178-21524-000 $31,476 .4% 99 GO Bonds 178-78103-010 $1,100,156 13.2% 00 GO Bonds 178-78101-011 $66,964 .8% 02 GO Bonds 178-78101-014 $4,870,000 58.4% 02 GO Bonds 178-78102-014 $800,000 9.6% 03 GO Bonds 178-78101-015 $1,464,354 $156,017.40 17.6% TOTAL $8,157,950 $156,017.40 100% Budget Amount Award Percent Engineering $1,091,100 13.1% Right -of -Way $66,850 .8% Construction $6,250,000 75.0% Geo Tech Services $175,000 $156,017.40 2.1% Contingency $750,000 9.0% TOTAL $8,157,950 $156,017.40 100% BACKGROUND: The Dove Loop Construction Project includes large quantities of roadway fill for the new roadway section across the City Service Center, the Joe Wright Property and the Corps of Engineer Property. The majority of the fill is associated with the two 300 foot long May 28, 2003 (8:13AM) bridges between N. Main Street and Dove Road. More than half of the contract cost for the geo-technical services is associated with the fill compaction testing. $86,744.00 Another significant cost element of the geo-technical services contract is the bridge related services including pier observation & material testing as well as bridge deck observation and material testing. $28,018.00 The balance of the costs is associated with normal geo-technical testing services for a large scale roadway project. These services include compaction testing of water line, wastewater line and drainage line backfill, compaction testing of stabilized roadway subgrade, concrete testing for the roadway and other concrete structures such as curb inlets, drainage system headwalls and concrete box culverts. $41,255.40 Staff recommends approval. JSL 0:\AGENDA\6-3-03\ DOVE LOOP GEO-TECH CONTRACT May 28, 2003 (8:14AM)