Loading...
HomeMy WebLinkAboutItem 14 - Grapevine Public LibraryMEMO TO FROM: MEETING DATE: SUBJECT RECOMMENDATION: ITEM ♦ � =` HONORABLE MAYOR AND MEMBERS OF HE CITY COUNCIL ROGER NELSON, CITY MANAGER - SEPTEMBER SEPTEMBER 5, 2000 GRAPEVINE PUBLIC LIBRARY — AMENDMENT TO ARCHITECT CONTRACT City Council consider approving an Amendment to the Contract with Philips Swager Associates (PSA) for coordination, fabrication and installation of a three-dimensional arbor entry into the Children's program area of the Library and coordination, fabrication and installation of a garden scene mural adjacent to the Children's program area of the Library in the amount of $31,560, authorizing staff to execute said Amendment, and take any necessary action. FUNDING SOURCE: BUDGET Planning/Design $ 615,000.00 8.9% Construction 4,784,547.00 69.0% Owner Direct Expenses 613,000.00 8.8% Furnishings and Signage 650,000.00 9.4% Contingency 273.030.35 3.9% TOTAL $ 6,935,577.35 100.0% Library Building Account $ 14,750.35 Acct. No. 100-48840-313-1 99 GO Bonds 1,000,152.00 Acct. No. 177-48840-010-313 00 GO Bonds 2,875,000.00 01 GO Bonds 2,875,000.00 Unallocated GO Bond Int. 67,000.00 Future GO Bond Int. 103,675.00 TOTAL $ 6,935,577.35 August 31, 2000 (10:26AM) 0 Funds for this item are available from the Project Contingency portion of the budget. During the design charrettes held with the City Council, Staff and PSA Architects, the development of a three-dimensional arbor entry and mural in the Children's program area was discussed. However, the details of the mural and the arbor entry to the Children's program area of the Library had not been finalized at the time of contract award. The construction of these facets of the facility was not included in the construction contract. PSA recommended to the Library Board and Staff the consideration of Studio H Design for the design of the mural and arbor entry work. After visiting with representatives of Studio H Design, the Library Board and Staff are comfortable with the ideas they presented and have chosen them as the firm to complete this portion of the work. The PSA representatives have worked with Studio H Design in the past and are comfortable coordinating the artist's work. Therefore, the PSA representatives will work with the Contractor and the artist throughout the development of this part of the project. Attached, please find a draft of the proposed mural artwork and the Arbor entrance to the entire Children's Area which will be located across the aisle from the Circulation desk. This attached draft of the mural is slightly different from what the final product will look like, in that, the tool shed will be a playhouse with a little girl having a Teddy Bear Tea Party. Also, the little girl on the swing will become a little boy. The mural will be 12' high by and approximately 21.5 feet long. The doors to the playhouse will be the actual doors to the Children's Program Area and there will be a short 4 foot high door into the Children's Program Area located in the trunk of the tree. The artwork and entryway are expected to be complete by the library construction completion date in July of 2001. The Facilities Committee and Staff recommend approval. RHP\JLH 0:\INT_SRV\BOB\Ubrary\AGM-PSA Amendment No. 1.doc August 31, 2000 (10:26AM) WS, a PHILLIPS SWAGER ASSOCIATES (PSA) Professional Services Agreement Addendum Project Grapevine Public Library Project No. 4195.00 Date 8-14-2000 As requested we are proceeding with providing Professional Services in accordance with our Agreement dated as of for the subject project. City of Grapevine hereby authorizes PSA to: X Proceed with Additional Services ❑ Proceed with revised scope of services ❑ Incur Reimbursable Expenses as follows: 1. Coordinate the installation, dimensional adjustments and fabrication of the three dimensional arbor entry into the children's room entry area including faux lattice, stone, foliage and critters on the drywall entry built by the general contractor. For a cost of: 516,000 fabrication - Studio H Design SI,920 installation -Studio H Design $1,200 coordination -PSA plus additional hours for drawing/coordination: Total item r 1: 519,120.00 2. Coordinate the installation and fabrication of the 12'-0" x 21'-6" mural depicting a garden scene, painted on flame retardant canvas and sealed vv ith three coats of clear polyurethane. The price includes a color rendering of the scene. For a cost of: $10,578 fabrication - Studio H Design $1,27 0 installation - Studio H Design $592 coordination - PSA plus additional hours for drawing/coordination: Total Item 92: $12,440 GRAND TOTAL: $31,560.00 Compensation shall be adjusted as follows: ❑ Hourly basis in accordance with Architect's Standard Hourly Rates ❑ Hourly basis in accordance with Architect's Standard Hourly Rates not -to -exceed X Lump Sum Fee of $31,560.00 PAYMENTS 50% deposit due upon acceptance of costs and design concept (black and white drawing) 30° o due upon completion of fabrication 20% due upon installation xy4195&OPSA4DDEN 6-1 wpd Please acknowledge your acceptance by signing, in the space provided. Retain one copy and return the remainder to our office. APPROVED BY: APPROVED BY: Architect: PHILLIPS SWAGER ASSOCIATES Owner: By Title Date X'\4195WTS.-kADDE\.6-1 u -pd LOSM Title Date