MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: ROGER NELSON, CITY MANAGER&/f/
MEETING DATE: OCTOBER 17, 2000
SUBJECT: AMENDMENTS 5 & 6 / CREEKS 17 & 23 DESIGN CONTRACT
RECOMMENDATION:
City Council consider approving Amendments No. 5 and 6 to the Creeks 17 & 23 Design
Contract with Freese and Nichols, Inc. in the "not to exceed" amounts of $5,200.00 and
$30,350.00, respectively, for additional engineering services relative to the development
of the final plans for the Creeks 17 & 23 Channel Improvements project, authorize staff
to execute said Amendments and take any necessary action.
FUNDING SOURCE:
Funds are available in the following accounts:
Funding Source Account
Amount
Award
Percent
94 GO Bonds178-78324-007
$ 373,830.48
7.8%
96 GO Bonds 178-78355-009 $
32,169.52
.7%
Peripheral Fees 178-21407
$ 1,892.77
.1
Stormwater Drainage
Utility Funds 116-48941-535-1
$ 160,710.00
$35,550.00
3.4%
Future Stormwater Bonds
$4.203.700.00
88.0%
TOTAL
$4,772,302.77
$35,550.00
Bu—. diet
Amount
Award
Percent
Engineering
$ 556,410.00
$35,550.00
11.7%
Construction
$ 3,695,922.53
77.4%
Permit
$ 18,077.47
0.4%
Contingency
$ 501.892.77
0.5%
TOTAL $4,772,302.77 $35,550.00
BACKGROUND:
During the development of the Creeks 17 & 23 project, residents along the creek have
raised a number of questions in both individual and public meetings. As a result of
residents' questions, a bio -engineer was hired, and an investigation of trench safety and
construction techniques was completed. The bio -engineer provided recommendations
\\CHOP\DATA\C ITYW I DE W GENDA\10-17-00\amend.creek 1723.design.contract.doc
October 12, 2000 (5:09PM)
relative to residents' concerns, such as gabions and vegetative slope stabilization, which
are now being made part of the plans. The questions regarding trench safety and
construction techniques were answered by a specialist during the last set of public
meetings.
The contract amendments reflect the retention of the additional consulting services
described above and also include the changes to the construction plans related to the
residents' questions.
Staff plans to advertise the project for bid in November.
Staff recommends approval.
\\CHU P\DATA\CITYWIDE\AGENDA110-17-00\amend.creek 1723.design.contract.doc
October 12, 2000 (5:09PM)
VO
ENGINEERING SERVICES
CONTRACT CHANGE AUTHORIZATION NO. 5
Client: City of Grapevine
F&N Project No.: GPV94248
Mr. Stan Laster P.E.
Client Contract Ref.:
P.O. Box 95104
Grapevine TX 76099
Date: July 5, 2000
Project Description: Special Services - Creek 23 & 17 Channel Improvements
Description of Services Added/Deleted:
The work to be added includes a review of the project by Charles Jackson, P.E. of Rone Engineers to evaluate
potential OSHA trench safety concerns, including his attendance at one working meeting and at all three Third
Public Meetings. The work also includes additional effort by F&N staff to coordinate the subconsultants.
Deliverables:
Attendance by Charles Jackson, P.E., at one working meeting and all three Third Public Meetings
Compensation shall be adjusted as follows:
As described in the attached Scope of Services, the additional effort for the trench safety review by Rone
Engineers consists of $2,000 of labor and $100 of expenses, and the additional effort by F&N staff to
coordinate the subconsultants consists of $3,100, for a total increase not to exceed $5,200, and shall be billed
on an hourly basis.
Original Contract (including CM#4)
$222,210.00
Revised Total Contract
$227,410.00
Schedule shall be adjusted as follows:
In order to meet the proposed schedule for the public meetings in July 2000, work on the OSHA trench safety
review shall start immediately after the date of this modification.
The above described services shall proceed upon return of this Contract Change Authorization. Services will
be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are
not expressly amended shall remain in full force and effect.
O
l�
A contract modification will be submitted.
This Contract Change Authorization will serve as contract modification.
CLIENT:
B
LE: D' ector of Public Works
DATE: July 11, 2000
FREESE AND NICHOLS, INC.:
TITLE:
DATE: � /?
DISTRIBUTION: PM, GROUP MGR., DISC. LDR., OPER. ANAL., CONTRACT ADMIN
4055 INTERNATIONAL PLAZA, SUITE 200 • FORT WORTH, TEXAS 76109-4895 • TELEPHONE: 817-735-7300 ® METRO: 817.429-1900 • FAX: 817-735.7491
till 1 1 LrC(1 (U'\FORMS\CONCHG.FRMj 02196
ra
FREESE- NICHCt LS
ENGINEERING SERVICES
CONTRACT CHANGE AUTHORIZATION NO.6
Client: _ City of Grapevine
Mr. Stan Laster, P.E.
F&N Project No.: GPV95087
P.O. Box 95104
Client Contract Ref.:
Grapevine, TX 76099
Date: August 10, 2000
Project Description: Creek 23 & 17 Channel Improvements
Description of Services Added/Deleted:
The work includes the modification of the plans and specifications to reflect the changes made during the
recent public meeting process as described in the attached list of general and specific changes to the project,
as well as additional review comments received from City staff. The work also includes the design of
bioengineering erosion protection along the outside bank of the oxbows on Upper Creek 23 and Creek 17,
along with Robbin Sotir's review of the bioengineering design and specifications.
Deliverables:
An updated set of plans and specifications for the City to bid the project.
Compensation shall be adjusted as follows:
The additional effort consists of $21,450 of labor and $2,500 of expenses, and the review of the bioengineering
design by Robbin Sotir and Associates consists of $6,400, for a total increase not to exceed $30,350, and
shall be billed on an hourly basis.
Original Basic Services Contract (with CM#1)
$288,100.00
Revised Total Basic Services Contract
$318,450.00
Schedule shall be adjusted as follows:
The modifications to the plans shall be completed within 60 days of the date of this agreement.
The above described services shall proceed upon return of this Contract Change Authorization. Services will
be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are
not expressly amended shall remain in full force and effect.
O A contract modification will be submitted.
C�r This Contract Change Authorization will serve as contract modification.
FREESE AND,NIICHOOLS, INC.: p+
TITLE:V: c (- /�� tJ.'04 ",'/
DATE: Y/i" I°"
CLIENT:
DISTRIBUTION: PM, GROUP MGR., DISC, LDR.,
BY:
TITLE:
DATE:
OPER. ANAL., CONTRACT ADMIN.
4055 INTERNATIONAL PLAZA, SUITE 2001 FORT WORTH, TEXAS 76109-48961 TELEPHONE: 817-735-7300 I METRO: 817-429-1900 I FAX: 817-735-7491
[UAFORMSICONCHG.FRM) 0296
Creeks 17 and 23 Stormwater Channelization Project
Design and Construction of the Channel Improvements to Creeks 17 and 23. These two locations have been
identified as the highest priority projects to address existing capacity and future capacity problems that could result
in flooding of private property.
U men.ali talle 11 M MEDWIrel
Design Mar -95 Nov -00
Construction Jan -01 Jun -02
FISCAL IMPACT
Cleaning of these areas would be dependent upon need.
Projected Annual
Operating Impact
FY -2001 FY --2002 FY -2003 FY -2004 IFY 2005
Bud et "Planned Planned Planned. Planned Total
Personnel Expenses
0
Total
Project
LTD
Budget
Planned
Project
Expenses
09130/00
FY -2001
FY -2002 FY -2003 FY -2004 FY -2005 '
Cost
Design
481,210
75,200
556,410
Construction
2,646,423
1,049,500
3,695,923
Permit
18,077
18,077
Contingency
501,893
501,893
TOTAL:
$481,210
$2,739,700
$1,551,393
$0
$0
$0
$4,772,303
Funding
Source
373,830
373,830
1994 GO Bonds
Future
Stormwater
Utility Bonds
2,652,307
1,551,393
4,203,700
1996 GO Bonds
32,170
32,170
SDUS Interest
75,210
85,500
160,710
Peripheral Fees
1 1,8931,893
TOTAL:
$481,210
1 $2,739,700
$1,551,393
$0
$0
$0
1 $4,772,303
Cleaning of these areas would be dependent upon need.
Projected Annual
Operating Impact
FY -2001 FY --2002 FY -2003 FY -2004 IFY 2005
Bud et "Planned Planned Planned. Planned Total
Personnel Expenses
0
Supplies
0
Maintenance
0
Services
0
,Capital Outlay
0
Total
$0 $0 40 $0 "S0 $0
■
City of Grapevine - Creeks 23 & 17 Channel Improvements
List of General Changes to the Project
• Charged Lower Creek 23 channel walls to use modular block for upper 4 feet of walls
• " Changed Creek 17 channel walls to modular block
• Using a stamped rock pattern in the concrete channel bottom
• Changed decorative chain link fence along Lower Creek 23 to welded pipe rail
• Deleted the maintenance access ramp at Creekwood Drive
• Will hire a tree specialist during construction to minimize impacts on existing trees
• Will add nesting boxes in mature trees
• Will plant clumps of berry -producing shrubs occasionally along the overbanks
• Will use bioengineering in oxbow areas and several overbank areas
List of Specific Changes to the Project
Address
Creek
Stream Station
Descri tion of Change
2812 Rosecliff Terrace
23
5+00
Won't extend 18" storm drain, will lower
channel wall and construct open channel
with inlet to channel, may use overbank
walls to hel save trees
2819 Springhill
23
5+70
Relocate aerial crossing support column
2810 Creekwood
23
6+00
Review the grading around several trees
2829 Greenbrook
23
8+00
Review the grading at the top of the
slopes to save the trees, especially large
ost oak next to driveway
2818 Creekwood
23
9+50 to 10+25
Raise the left channel wall .to flatten the
slope and protect the deck supports, add
area drain to intercept runoff from drives
2820 Creekwood
23
10+25 to 11+00
Raise the left channel wall to flatten out
slope, try to keep 2 big trees below the
existing retaining wall
2822 Creekwood
23
11+00 to 11+75
Raise the left channel wall to flatten
slope
2824 Creekwood
23
12+50
Be sure and connect the french drain to
the channel wall
2826 Creekwood
23
12+70 to 13+50
Raise the left channel wall, be sure to
connect drain pipe to channel wall, look
at using area drain grate for flow off
driveways
Address
Creek
Stream Station
Description of Change
2917 Timberline
23
13+00 to 14+00
Save as many trees on the ridge line as
possible
2718 Twin Creek
23/17
14+80
Add grading a small drainage ditch along
Cove
the sanitary sewer easement, with an inlet
2722 Twin Creek
to the channel
Cove
2830 Creekwood
23
15+00
Add an overbank wall to save some of
the trees around the deck
2832 Creekwood
23
15+80 to 16+10
Extend overbank wall to protect
driveway
2714 Twin Creek
23
16+60
Add an overbank wall to save several
Cove
trees
2836 Creekwood
23
17+40
Be careful of trees and new retaining wall
along driveway
2710 Twin Creek
23
18+00 to 19+00
Possibly use bioengineering on left bank
Cove
of channel
2712 Creekwood
23
23+00 to 23+50
Review grading to make sure we save the
trees we are showing we will save
3002 Old Mill Run
23
23+10 to 23+90
Remove the overbank wall to save trees
along bank
300.4 Old Mill Run
23
24+40
Add an inlet on the right channel wall to
et local runoff into the channel
3006 Old Mil Run
23
25+20
Protect tree near telephone pole, be
careful around the sprinkler system,
remove drop TXU pole if possible
3012 Old Mill Run
23
28+70 to 29+80
Modify bottom of flood overflow channel
to concrete so that maintenance vehicles
can drive over it
3012 Old Mill Run
23
29+60
Increase right overbank wall height to
save trees
2722 Twin Creek
17
2+00 to 2+90
Keep the top railroad tie retaining wall
Cove
2521 Bearhaven
17
7+00
Revise grading of fill area in left
overbank to save trees, possibly extend
the overbank wall to help, show and
protect large tree
3014 Oak Forest
17
5+00 to 5+50
Modify location and height of overbank
wall to avoid disturbing fence and trees
3010 Oak Forest
17
7+50
Stabilize creek bed below existing
railroad tie wall with rock rira
2510 Briarwood
17
8+00
Use bioengineering to stabilize the slope
of the outside bank of the low flow
channel, with limited grading on the
inside bank.
�okG �o
TREWS Tb BE
RVcD
I
m
9
K4
m
Y
C)
MA
uj
OD -
I
-' r
CL
m
zo < S6(5
< LJ
Li 1:'- 0%
ui
C�z
m L
= Wj <
C) 0 9:
cr.
< � X Uj
00 V) 0 U)
Crj- :2
U.J L'i
Z
C14
Z ooj/�-�
0 m
0 . &Z
z C7
—Z
co -S
Q
Ln
LL-
< 4:3
Lu
I
m
9
K4
m
Y
C)
MA
uj
OD -
I
-' r
CL
m
zo < S6(5
< LJ
Li 1:'- 0%
ui
C�z
m L
= Wj <
C) 0 9:
cr.
< � X Uj
00 V) 0 U)
Crj- :2
U.J L'i
Z
C14
Z ooj/�-�
0 m
0 . &Z
z C7