Loading...
HomeMy WebLinkAboutItem 16 - Church Street DesignITEM* 16 MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGERA/ MEETING DATE: OCTOBER 17, 2000 SUBJECT: ADDENDUM TO THE CHURCH STREET DESIGN CONTRACT - ADDITION OF THE SOUTH DOOLEY STREET IMPROVEMENTS RECOMMENDATION: City Council consider amending the Church Street design contract with HDR Engineering, Inc., with an addendum for additional professional services for the design of the South Dooley Street Improvements from College Street to Dallas Road in the amount of $64,215.00, authorize staff to execute said contract addendum, and take any necessary action. FUNDING SOURCE: 10 Funds are currently available as follows: Funding Source Account Amount Award Percent 99 GO Bonds 178-78106-010 $ 100,000.00 $64,215.00 5.0% 99 GO Bonds 178-78105-010 $ 767,223.00 38.4% Future GO Bonds $1.129.035.00 56.6% TOTAL $1,996,258.00 $64,215.00 Budget Amount Award Engineering $ 275,000.00 $64,215.00 Construction $1,381,880.00 ROW $ 86,000.00 Contingency $ 253.378.00 TOTAL j $1,996,258.00 $64,215.00 Percent 13.8% 69.2% 4.3% 12.7% October 12, 2000 (9:55AM) 0 '• i The improvements to South Dooley Street were approved as part of Proposition 1 in the 1998 bond election. Improvements include the reconstruction and widening of South Dooley Street from College Street to Dallas Road. Railroad crossing and signal improvements will also be completed as part of the project. The South Dooley Street crossing of the St. Louis and Southwestern Railroad is currently un -signalized and is a rough crossing with an extreme angle of vehicle travel. The City of Grapevine requested HDR Engineering, Inc. submit a design proposal which incorporated road improvements to South Dooley Street as well as improvements to the railroad crossing. HDR Engineering, Inc. will prepare right-of-way maps and descriptions, construction plans, details, specifications and special provisions for the South Dooley Street Improvements. While it is anticipated that all improvements to South Dooley Street will take place within the existing right-of-way and that the road will remain close to its current configuration, HDR Engineering, Inc. will assure that all the necessary right-of-way is incorporated. The rail line is owned by the Dallas Area Rapid Transit Authority (DART) and they will provide the plans and equipment for the signalization of the crossing. It is anticipated that the construction contracts for Church Street and the South Dooley Street projects will be bid together. Staff recommends approval. JLH/Ing O:\agenda\101700\dooley.agm October 11, 2000 (3:59PM) Church Street Church Street is to be reconstructed as a 36 -foot back to back concrete section. This will allow parking on the east side of the roadway while providing two 12 foot lanes for traffic. This project also includes substantial drainage improvements from Main Street to Moorehead Branch. These improvements will provide more parking and improved access to the downtown historic area. PROJECT SCHEDULE Beein End Design Oct -00 Jan -01 ROW Acquisition Feb -01 Feb -01 Construction Apr -01 Apr -02 FISCAL IMPACT Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement, and maintaining parkways on both sides of the roadway. Projected Annual Operating Impact FY -2001 FY -2002 Bud et Planned 'FY -2003 Planned FY -2004 Planned Total Project LTD Budget Planned Project Expenses 09/30/00 FY -2001 FY -2002 FY -2003 FY -2004 FY -2005 Cost Design 55,548 119,452 Maintenance 927 1,434 1,434 175,000 ROW Services 86,000 975 2,028 2,028 6,006 86,000 Construction 402,880 350,000 0 Total $0 � M11111902 752,880 Contingency 3'162 $11,235 183,378 183,378 TOTAL: $55,548 $608,332 $533,378 $0 $0 $0 $1,197,258 Funding Source 55,548 608,332 103,343 767,223 1999 GO Bonds 2001 GO Bonds 430,035 430,035 TOTAL: 1 $55,548 1 $608,332 1 $533,378 $0 $0 $0 1 $1,197,258 Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement, and maintaining parkways on both sides of the roadway. Projected Annual Operating Impact FY -2001 FY -2002 Bud et Planned 'FY -2003 Planned FY -2004 Planned FY -2005 Planned Total Personnel Expenses 0 Supplies 0 Maintenance 927 1,434 1,434 1,434 1 5,229 Services 975 975 2,028 2,028 6,006 Capital Outlay 0 Total $0 � M11111902 -$2,409,, "$34462 3'162 $11,235 0 GENERAL GOVERNMENT CAPITAL PROJECTS South Dooley Street Reconstruction and widening of South Dooley Street from College Street to Dallas Road. The roadway will be a 36 foot wide street with full concrete railroad crossing and signal improvements. The curve across the railroad tracks will be softened to provide for a smoother transition. PROJECT SCHEDULE Begin End Design Oct -00 Feb -01 Construction Apr -01 Apr -02 Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement and maintaining parkways on both sides of the roadway. Projected Annual Operating `Im act FY -2001 u 1F'Y-2002 FY -2003 Budget ''',.:Planned ' Planned ,FY-2004 2004 Planned Fy-2005 , 'Planned Total Project LTD Budget Planned Project Expenses 09/30/00 FY -2001 FY -2002 FY -2003 FY -2004 FY -2005 Cosh Design 479 100,000 2,501 4,941 Services 450 100,000 Construction 1,350 Capital Outlay 629,000 0 629,000 Contingency 52,411 $2;Si 70,000 70,000 TOTAL: $0 $100,000 $699,000 $0 $0 $0 $799,000 Funding Source 100,000 100,000 1999 GO Bonds Future GO Bonds 699,000 699,000 TOTAL: $0 1 $100,000 1 $699,000 $0 $0 $0 $799,000 Operating budget impact includes the cost of periodic street sweeping, electricity for street lights, maintenance of road markings, sealing of joints in pavement and maintaining parkways on both sides of the roadway. Projected Annual Operating `Im act FY -2001 u 1F'Y-2002 FY -2003 Budget ''',.:Planned ' Planned ,FY-2004 2004 Planned Fy-2005 , 'Planned "Total Personnel Expenses 0 Supplies 0 Maintenance 479 1,961 2,501 4,941 Services 450 450 450 1,350 Capital Outlay 0 "Total $0 0929 52,411 $2;Si $6,291