HomeMy WebLinkAboutItem 06 - Temporary Concrete Batch PlantMEMO TO
FROM:
MEETING DATE:
SUBJECT:
RECOMMENDATION:
ITEM o �__
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER/$/
DECEMBER 5, 2000
TEMPORARY CONCRETE BATCH PLANT FOR OSBURN
CONTRACTORS
City Council to consider approval of a request to locate a temporary concrete batch plant
on Lot 1, Block 2, Westport Business Park from December 5, 2000 through May 1, 2001.
BACKGROUND:
The applicant, Osburn Contractors, is requesting a temporary concrete batch plant to be
located at Lot 1, Block 2, Westport Business Park. This is the site for Oakmont
Industries. The applicant plans to operate the batch plant from 7:00 a.m. to 7:00 p.m.
Monday through Friday until May 1, 2001.
Staff recommends approval.
HTH/sh
oAsh\osburn.cbp
November 29, 2000 (11:02AM)
Is
APPLICANT
NAME
CITY OF GRAPEVINE NOV 14 2000
TEMPORARY USE APPLICATION
7z�
77-1
0 2000
ADDRESS y/ 7
CITY
STATE _7Y Zip
PHONE NO.
f?91LyZO 1 FAX NO.
2. PROPERTY OWNER
NAME
ADDRESS 3 S -L c,
CITY
STATE Co lAr
PHONE NO. 'k0' -k -'d(6 FAX NO. q ef
3. ADDRESS OF TEMPORARY USE
P4 - . p
ERIMMIT REQUEqT-
4, LEGAL DEaCRIPTI N OF PROPEVTrY:lac 2-
5. DESCRIBE REASONFORTEMPORARY USE:
6. DATE(S) OF PROPOSED TEMPORARY
USE FROM
T. TOTAL NUMBER OF OFF-STREET OR HIGHWAY PARKING SPACES
8. TIME AND HOURS OF TEMPORARY USE OPERATION 7A -,k - -7,,- 400-15'.11
SUBMIT A DETAILED DIAGRAM OF THE PROPOSED TEMPORARY USE, SITEIPLOT PLAN OR A PLAT SHOWING THE
PROPOSED TEMPORARY USE DRAWN TO SCALE AND DIMENSIONED WITH OTHER DRAWINGS AS DESIRED OR AS
REQUESTED BY STAFF.
IN THE CASE OF CONCRETE MIXING OR BATCHING PLANTS FOR USE DURING THE CONSTRUCTION OF BUILDINGS
OR PUBLIC IMPROVEMENTS FOR THIRTY (30) DAYS OR LESS MAY BE APPROVED BY THE DIRECTOR OF
DEVELOPMENT SERVICES, CONCRETE MIXING OR BATCHING PLANTS FOR USE MORE THAN THIRTY (30) DAYS
SHALL REQUIRE APPROVAL BY COUNCIL.
OWNER NAME (PRIN'
OWNER SIGNATURE
CITY OF GRAPEVINE
7nOa
----------------
DEVELOPMENT SERVIC
2c 0 13
_4LE_NS`E�X
DATE 0 C
P 0 BOX 951
GRAPEVINE, TEXAS 76099 (817)410-3155 FAX (817)410-3012
TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
AIR QUALITY STANDARD PERMIT REGISTRATION for CONCRETE BATCH PLANTS
FORM PI-IS-CBP
Please print or type all information. This form is for use by Concrete Batch Plants ONLY. All other air quality
standardpermit registrations should use Form PI -IS. Please contact the Mechanical/Combustion Section of the
C Air Permits Division with any questions at (512) 239-1250 or Fax (512) 239-1300. Written inquiries may be
ron addressed to: Texas Natural Resource Conservation Commission, Office of Permitting, Remediation, &
ouraged
toe use anloadmiini trativecompleteess6chec list, available on request,ltoSas stineproviding registrant rc
ivision therequ red
information.
ation to TNRCC, Air Permits Division (MC -162) P.O. Box 13087, Austin,
TX
Forward application and supporting document
78711-3087; Forward any fees and a copy of this form onl to Cashier,agency use O. Box 13088, Austin,
TX 78711-3088.
For age
_ I EN YES
A. Is CONFIDENTIAL information part of this registration? YES /C NOI
If "YES", is each confidential page so marked in big red letters?
B. Is this registration in response to, or related in any way to, a Notice of Violation (NOV) at t�25
If "YES"date of NOV: P ocatiQU19-
and the specific TNRCC rale(s) violated:
,
C. Are the new facilities or changes to existing facilities represented in this registration requiredYtEoSe p e as a
disposal facility under the Taxes Solid Waste Disposal Act?
D. Does this action result in the registration of any grandfathered facilities? •YES O
A. PERMITTEE Osburn Contractors Inc .
(Entity legally responsible for permit; i.e., Owner or Operator of the facility)
Individual Authorized to Act for Registrant: Name: Titte: Fie 1 d Coordinator
Texas State Comptroller's Tax ID No.: 75-24 6 9062
Mailing Address: 1 7 C Fax: q -2 2 D 9 d 1Z
Telephone: ( 972
Technical Contact and Designee for Public Notice Period Questions; Name. Idago
E-mail Address:
Fax:
B. TYPE OF FACILITY: Portable Read Mix • Permanent Specialty
(check one): • Permanent (Central or Ready Mix) Y
Name of Facility and Company's Facility No.: Osburn Plant #1 Job `name • G%eStnQr-t- Buss. Par
TNRCC Account ID No. (ifnown):.193 -2 81 8 –O
Previous Exemption, Permit -by -Rule or Permit No.: Length of Time at this Site: 6 months-
Pronosed Start of Construction: Npv 27,9n
C. PHYSICAL LOCATION OF FACILP1YY:– 1 Black 2 Westport Bossiness Park
Street Address or Description of Location: Loc
Nearest City:
(A physical address or accurate
1��
ections must be provided on all registrarrons.)
Code: 76051 County: Tarrant
(Latitude and Longitude must be to the nearest second)
Contiguous or adjacent to Public Works Project? •YES L_.
Total number of employees of the company requesting this application: 300 to lace a
Please list the location (public place in the county where the facilities are/will be located) where you are planning p
copy of the application for public review and copying during the public comment period:
Please furnish the names of the state legislators who represent the area where the facility site is located:
State Senator:
T .„„ ,,Toy Gon State Representative: Vicki Tri�i tt
TNRCC F0RMPI-I S-CBP, AIR QUALITY STANDARD PERMIT REGISTRATION FOR CONCRETE BATCH PLANT (Page 2 of 4)
IV. FEE and FRANCHISE TAX R(V�TION:
A fee of $450 is attached.YS • NO If no, explain why:
A permit fee is required ifpu(licnE
o ce must be performed.
Please forward the fee and a co f this form to: Cashier, TNRCC, P.O. Box 13088, Austin, TX 78711
A copy of a Certificate of Good Standing from the State Comptroller's Office is attached.- YES • NO
If no, explain why: If the permittee is a corporation, a certification is required.
V. SUBNHT TIN FOLLOWING GENERAL INF � TION:
A. A current area map is attached. YES NO
A current area map is required for all s dard ermit registrations. This map must show a true north arrow, the
entire plantproperty, and the location of the operty relative to prominentgeographical features such as highways,
roads, streams, and significant landmarks such as buildings, residences, and schools. All areas within one mile
of any plant boundary must appear on this ma .
B. A plot plan is attached. YES NO
A plot plan is required for all standard pe it re strations. The plotplan must show the plant property and clearly
show all property lines, affected emission s, buildings, tanks, process vessels, and other process equipment.
The plot plan must have a scale, must indicate a true north arrow, must reference a plant benchmark, and must be
dated.
C. A process description is attached. YE NO If NO, explain why:
A process description and process flow 'agr m should be submitted for all registrations and must include a
description of the project and related p esses, and a description of any equipment being installed. The
description must be in sufficient detail to indicate that the facility will conform to the specified conditions of the
standard permit. If alternative fencing or borders are proposed in lieu of distance setbacks for stockpiles and roads,
these design specifics must be included.
n Rnhmit the following emissions data (including fugitive emissions) and the basis of emissions estimates:
Emission
Point
Number
Name of Source
Emission Rate of Each Air Contaminant
lb/hr
tons/yr
Total
Suspended
Particulate
P
Particulate
Matter
< 10 microns
PM
Total
Suspendeder
Particulate
P
LParticulate
crons
10)
7
Silo
Cement
1.94
2.52
.22
.28
10
Batch Drop
Cement
1.08
1.40
TWRCC FORM PI-JSCBP, AIR QUALITYSTANDARD PERMIT REGISTRATIONFOR CONCRETE BATCH PLANT (Page 3 of 4)
VI. GENERAL REQUIREMENTS:
Submit itemized information and/or analysis demonstrating that all applicable general requirements as specified in
TNRCCRules A17nformzz ten -c: ecessary to justify the following answers.
Please ric dispersion modeling will not uired as part of the air quality impact analysis.
ittach
note:
Z6.610(a)(1) -
Nota lic
• YES • NO • N/A § 116.610(a)(2) -
The construction or operation of the permitted sources will commence prior
to the effective date of a revision of this standard permit under which the
project would no longer meet the requirements for the standard permit
N/A § 116.610(a)(3) -
The proposed project will comply with applicable provisions of federal New
Source Performance Standards (HSPS)
• YES • NO • N/A § 116.610(a)(4) -
The proposed project complies with applicable provisions of Federal Clean
Air Act (FCAA) § 112 (Hazardous Air Pollutants) under Title 40 Code of
Federal Regulations Part 61 (40 CFR Part 61).
• YES • NO • N/A § 116.610(a)(5) -
The proposed project complies with applicable Maximum Achievable
Control Technology (MACT) standards under FCAA 40 CFR Part 63.
• YES • NO • N/A § 116.610(6) -
The proposed project does not constitute a new major source or major
modification for Prevention of Significant Deterioration (PSD) or
nonattainment permits
• YES • NO • N/A § 116.610(c) -
The proposed project does not circumvent by artificial limitations the
requirements of 30 TAC § 116.610
VII. A COPY OF THIS REGISTRATION and all attachments must be sent by the registrant trant to
A. Appropriate TNRCC Regional Office (City):_Arlington
B. Local Programs: 1. City of Dallas Department of Health and Human Servi es
2.
• NO LOCAL PROGRAMS
VIII. PROFESSIONAL ENGINEER SEAL:
Is the estimated capital cost of this project greater than $2 million dollars? • YES • NO
If YES, registration must be submitted under seal of a Texas Licensed Professional Engineer, unless exemption
is claimed pursuant to the Texas Engineering Practice Act (TEPA).
• Exemption from this P.E. seal requirement is claimed pursuant to TEPA Section
DL I, (Name - Please print or type) (Title: Owner, Plant Manager, President, Vice President, Environmental Director, etc)
state that I have knowledge of the facts herein set forth and that the same are true and correct to the best
of my knowledge and belief. I fiuther state that to the best of my knowledge and belief, the project for
which registration is made will not in any way violate any provision of the Texas Health & Safety Code
(THSC), Chapter 382, Texas Clean Air Act, as amended, or any of the rules and regulations of the Texas
Natural Resource Conservation Commission adopted under Chapter 382 or any local governmental
ordinance or resolution pursuant to the Texas Clean Air Act. I further state that I have read and
understand Section 382.091, THSC, which defines CRINIINAL OFFENSES for certain violations,
including intentionally or knowingly making or causing to be made false material statements or
representations in this registration, and Section 382.092, THSC, pertaining to rNAL PENALTIES.
DATE: 10 -12 - 0 0 SIGNATURE:
NOTE - ORIGINAL SIGNATURE LN INK IS REQ UIRED.
TABLE 20 CONCRETE HATCH PLANTS
1. What type of plant? (Check One) Permanent y Portable
2. What type of batching will be accomplished? (Check One)
Wet (Rotary Mix Trucks) Dry Central Mix
3. Maximum Production Rates: Z� yd'/hour ���a,QDt1 yd'/year
Maximum Operations: Jy hours/day _days/wk weeks/yr hour/year
Does the facility operate at night? Yes No
4. Cement/Flyash/Additive Silo Information: i
a) How many silos will this plant have? t
b) What is the volume of each silo? ft' ft' ft'
c) Explain method of loading silo(s): - Ij J
d) Is each silo equipped a
�d ith overl ad war ing evicg�? Yes No
Please describe: '7li[J ilk nr ic.� �[!C't Ld
—I -f Y� K,ew
e) What type of abatement device will be used on silo vent(6) ? g u c-
f) If baghouses are used on the vent(s), for each device submit the following data
and attach a Table 11:
I.Flow rate cfm Total filtering area ft2
Air to cloth ratio Outlet grain loading gr dscf
Method of cleaning bags
Automatic (not manual) sequenced cleaning? Yes No
II. Flow rate cfm Total filtering area ft2
Air to cloth ratio Outlet grain loading gr/dscf
Method of cleaning bags
Automatic (not manual) sequenced cleaning? Yes No
III.Flow rate cfm Total filtering area ft2
Air to cloth ratio Outlet grain loading gr/dscf
, Method of cleaning bags
Automatic (not manual) sequenced cleaning? Yes No
5. How will the batch drop to truck or central mixer be controlled to prevent dust emissions?
Suction shroud with exhaust air to central baghouse? (complete following and
(attach Table 11)
Flow rate _ cfm Total filtering area ft2
Air to cloth ratio Outlet grain loading gr/dscf
Method of cleaning bags Ai ryil tnr n
Automatic (not manual) sequenced cleaning? Yes No
Flexible Discharge Spout with Water Fog Ring (attach design drawing)
Other type of abatement device (explain in detail and attach design drawing):
6. The cement weigh hopper will be vented tot
he: (Pick One)
Cement\Flyash Silo Baghouse �_ Central Baghouse Discharge Spout
Other:
7. List all additives or ad -mixtures and maximum usage rates at your facility:
tial i L, 4 r C2a
Provide additional information on any items requested above in this space:
8. will the sand and aggregate be washed prior to delivery at your facility? 4es No -Y
9. The number of acres or square feet which may be covered by aggregate stockpiles: -:5i2
lo. Explain
in the metho� of mov I ng aggre5ate from storage piles to the mixing area (in detail):
f . - 11001-lell-
11. will water sprays be used at the fo,;lowinq locations?
a) stockpiles __2LYes No
b) Aggregate bin outlets -Yes No
c) conveyor transfer points -Yes No
d) Screens -Yes No
12. Plant roads will be: Paved & Cleaned Paved & Vacuumed oil Coated
,Y -Gravel Chemical sprayed Water Sprinkled
13. Aggregate transport trucks have: ___L Beds Covered by Tarps A sprinkler system
14. Please provide the following information for all vehicles which travel on plant property
Weight (tons) No. of Distance Traveled
Vehicle Type Speed Empty Full wheels per round trip (miles or feet))
Paved Unpaved
Raw Aggregate 5
Loaders
Cement Tankers
Flyash Tankers
3C txx�
Additives
Mix Trucks 00d
10/93
w
ON -SITZ CiONCRtTV BATCH PLANT COMMGsURATlOM