HomeMy WebLinkAboutItem 12 - Hilton Force Main ProjectITEM I - / Z - MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROGER NELSON, CITY MANAGER �0 MEETING DATE: DECEMBER 19, 2000 SUBJECT: SURVEYING SERVICES CHANGE ORDER NUMBERS ONE, TWO, THREE, FOUR, AND FIVE FOR THE HILTON FORCE MAIN PROJECT RECOMMENDATION: City Council to consider Change Orders number 1, 2, 3, 4 and 5 to the Hilton Force Main survey contract of Pacheco Koch Inc. in the amount of $8,000, $650, $1,450, $5,850 and $9,000 respectively and authorize the City Manager as signatory. FUNDING SOURCE: Funds are available as follows: Funding Source Account Amount Award Percent 96 Utility Bonds 200-48940-534-2-000004SW $ 484,328 17.3% 99 Utility Bonds 200-48940-534-5-000002SW $ 25,375 .9% 99 Utility Bonds 200-48940-534-5-000003SW $ 35,100 1.3% 99 Utility Bonds 200-48940-534-5-000004SW $2,059,555 $19,100 73.8% WW Impact Fees 200-48930-534-6-000001 $ 161,419 5.8% Fellowship Church 178-21560 $ 24.600 $5,850 .9% TOTAL $2,790,377 $24,950 100% Budge Amount Award Percent Engineering $ 198,750 7.1% Construction $2,253,000 80.7% Testing/Surveying $ 60,587 $24,950 2.2% ROW Acquisition $ 58,000 2.1% Contingency $ 220.040 7.9% TOTAL $2,790,377 $24,950 100% BACKGROUND: Currently, sewage is conveyed from the northeast portion of Grapevine by the Hilton Lift Station and force main which was constructed when the DFW Hilton Hotel developed 16 years ago. The Grapevine Utility Master Plan called for upgraded facilities when December 13, 2000 (1:40PM) additional development exceeded the capacity of the lift station. The development of Olin' multifamily and commercial development in the area necessitates the initiation of this project. Although the lift station was upgraded recently, the force main needs to be enlarged. Pacheco Koch Inc. was selected to provide the surveying services for the force main design effort. The following is a summary of the change order authorization request. Change Order Number 1: The original survey contract incorporated a fee of $500 for legal document preparation by the surveyor for each easement. There were a total of 16 legal documents prepared for a total of $8,000. The fee represents payments above the original contract amount. Change Order Numbers 2 and 3: The Fellowship Church was concerned about the odor generated by the Hilton Lift Station and staff developed an odor control project that required the Church to dedicate an additional easement around the periphery of the lift station. The survey and document preparation fee was $650 and $1,450 respectively. Change Order Number 4: During the design phase the Fellowship Church platted the property that the lift station is located on and requested that the pipeline be relocated to allow the Church to better utilize their property. This request required a re -survey and the additional surveying fee was $5,850. The Fellowship Church reimbursed the City of Grapevine this amount. Change Order Number 5: The current force main route is Bass Pro Dr. to State Highway 26 to Ruth Wall and terminates at Boyd and Wildwood. This alignment was utilized for the design of the new facility. The existing force main must be kept in service during construction so the new force main must be in located in a new easement. Staff was unsuccessful in negotiating a new easement on Ruth Wall St. necessitating a new alignment and redesign of that section of the force main. The new alignment will follow State Highway 26 to Boyd and north on Boyd to Wildwood. The re -survey fee is $9,000. Staff recommends approval of change order number 1, 2, 3, 4, and 5 in the amount of $8,000, $650, $1,450, $5,850 and $9,000 respectively for a total of $24,950. MS/ms December 13, 2000 (1:40PM) Pacheco Koch Consulting Engineers I Mr. Matt Singleton CITY OF GRAPEVINE 501 Shady Brook Drive Grapevine, Texas 76099 December 5, 2000 PK No.: 1963-98.268 Re: Additional Services f%TQ LIFT STATION & FORCE MAIN REPLACEMENT PROJECTS J4 Grapevine, Texas Dear Mr. Singleton: As you are aware, the City of Grapevine has requested Pacheco Koch to provide additional surveying services on the referenced project. We believe these services to be outside the Scope of Work of our initial proposal dated September 29, 1998 and letters of additional services dated October 8, 1999, December 30, 1999, January 17, 2000 and June 6, 2000. These services are as follows: RUTH WALL FORCE MAIN REALIGNMENT _SURVEY., Pacheco Koch will provide a topographic survey for the realignment of approximately 3,900 LF of proposed force main. The force main realignment route, as described in a November 30, 2000 phone conversation with the Jean Bartley (City of Grapevine), will continue along S.H. 26 from Ruth Wall Road, then turn north along Boyd Drive and terminate at the intersection of Boyd @ Wildwood Drive (See attached Exhibit ). The survey shall be performed as per the original "Survey Scope of Services" for the Lift Stations & Force Main Replacement Projects. We propose that the fee for our current contract be increased by $ 9,000.00 to cover personnel expenses involved in these changes. Terms and conditions shall be the same as per our original agreement. If this request is acceptable to you as presented, please sign where indicated below and return to our office for our mutual agreement. If you have any questions or need any additional information, please call me at your earliest coRnv Mark A. Pacheco; KP.L.S. ACCEPTED BY: City of Grapevine SIGNATURE DATE PRINTED NAME AND TITLE MAP/nI 1963-51 TE 300 DALLAS, TEXAS 75243 972,235.3031 FAX 972.235.9544 WWW.PKCE.COM -__ -___-----'--'_--__- ] r '------------ ��==~ \ | | / i/ / . ., -- ----------------- or - rUmER ro^w ------------------ -------------------------- ----------------