HomeMy WebLinkAboutItem 22 - Waterline Oversizing ReimbursementMEMO TO:
FROM:
MEETING DATE:
SUBJECT
RECOMMENDATION:
ITEM it 7- �-
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
ROGER NELSON, CITY MANAGER /"
DECEMBER 19, 2000
WATERLINE OVERSIZING REIMBURSEMENT
City Council consider authorizing waterline oversizing reimbursement to Matheus Brothers
Investment, Inc. in the amount of $25,510.00, for the construction of a 20 inch water main
along State Highway 121 through the Lot 1, Block 2, Driskill Place Addition (Boi Na Braza
Steak House), authorize staff to issue payment to Matheus Brothers Investment, Inc., and
take any necessary action.
FUNDING SOURCE:
Funds are available in the Water Impact Fee Fund Balance in Account No. 200-48930-534-
6-000004. This project is programmed in the current 10 Year Capital Improvements Plan
BACKGROUND INFORMATION:
Matheus Brothers Investment, Inc. developed the Lot 1, Block 2, Driskill Place Addition (Boi
Na Braza Steak House) on 2.380 acres of land located at the southeast corner of William
D. Tate Avenue (State Highway 121 Frontage Road) and Hall Johnson Road. Matheus
Brothers Investment, Inc. is required to oversize a water main to accommodate the City's
Master Water Plan.
Under normal conditions, this development would be required to construct an 8 inch water
main to provide adequate service. The City Code provides for the City of Grapevine to
refund private developments for the oversizing costs (the difference in costs of lines
necessary for their development compared to lines required by the City's Master Water and
Wastewater Plans).
The developer has submitted a cost proposal of $41,400.00 for the 20 inch water main and
appurtenances. For comparison, the developer also provided prices for an 8 inch water
main at a cost of $15,890.00. The net oversizing costs that will be owed to the
development for this water main is $25,510.00.
Staff has reviewed the submitted 8 inch and 20 inch water main costs to actual 8 inch and
20 inch water main costs. The costs reflected in the request are comparable to other water
main costs for the same line sizes. Therefore, staff feels that the prices presented by the
developer are representative of actual costs for this type of work.
Staff recommends approval.
JLH/SAD
0:lagenda112-19-004ater. rem
00 11:19
ww
-,..-Lreelk
Construction, Ltd.
(1 •R• CREEK a
BOI NA BRAZA RESTAURANT
HWY 121 @ HALL JOHNSON ROAD
GRAPEVINE, TEXAS
972 406 9010 P.02/03
Description Quantity Unit Cost Total Cost
WATER SYSTEM:
OFFSITE.-
FFSITE:Connect
Connectto Existing 20"
1 LS
2,000.00
$
2,000.00
20" RCCP
355 LP
62.00
22,010.00
Fittings wl Thrust Block
3 EA
1,000.00
3,000.00
20" Gate Valve
1 EA
9,970.00
9,970.00
6" Gate Valve
1 EA
750.00
750.00
Fire Hydrant
1 EA
1,500.00
1,500.00
Test
1 LS
750.00
750,00
Trends Safety
355 LF
4.00
1,420,00
Subtotal Offsite
$
41,400.00
ONSITE:
8" PVC
280 LF
16.00
$
4,480.Ob
6" PVC
10 LF
14.00
140.00
8" Gate Valve
1 EA
790.00
790.00
6" Gate Valve
1 EA
700.00
700.00
Fittings
2 EA
250.00
500.00
8 x 2 Domestic Service
1 EA
1,200.00
1.200.00
8 x 1 Irrigation Service
1 EA
900.00
900.00
Test
1 LS
500.00
500.00
Trench Safety
290 LF
100.00
290.00
Subtotal Onsite
9,500.00
TOTAL WATER SYSTEM
$
50,900.00
SANITARY SEWER'
Manhole @ Existing
1 EA
2,400.00
$
2,400.00
Manhole
2 EA
2,000.00
4,000.00
8" PVC
600 LF
16.00
9,600.00
Test
600 LF
1.50
900.00
Trench Safety
600 LF
1.00
600.00
TOTAL SANITARY SEWER
$
17,500.00